Report | Type | Published |
2023 Operations, Maintenance, and Monitoring Closeout Report for the Hopedale Hydrologic Restoration (PO-0024) Project (PDF) | OM&M Report | 8/1/2024 |
2023 Operations, Maintenance, and Monitoring Report for Oyster Bayou Marsh Creation (PDF) | OM&M Report | 6/18/2024 |
2024 Annual Inspection Report For the Bayou Bonfouca Marsh Creation Project (PDF) | Inspection Report | 6/14/2024 |
CS-29 Black Bayou Culverts Hydrologic Restoration - OM plan-Budget.pdf (PDF) | OMM Plan | 6/1/2024 |
2024 Annual Inspection Report for the Lake Borgne Shoreline Protection Project (PO-30) (PDF) | Inspection Report | 4/17/2024 |
2024 Operations, Maintenance, and Monitoring Report for Naomi Outfall Management (BA-0003c) and Barataria Bay Waterway East Side Shoreline Protection (BA-0026) (PDF) | OM&M Report | 4/1/2024 |
2024 Operations, Maintenance, and Monitoring Report for Naomi Outfall Management (BA-0003c) and Barataria Bay Waterway East Side Shoreline Protection (BA-0026) (PDF) | OM&M Report | 4/1/2024 |
2023 Short Summary Report for Cameron-Creole Watershed Grand Bayou Marsh Creation (CS-54) (PDF) | OM&M Report | 4/1/2024 |
BA-276 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/18/2024 |
BA-276 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/18/2024 |
BS-47 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/18/2024 |
BS-47 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/18/2024 |
Monitoring Plan for Caminada Headland Back Barrier Marsh Restoration (BA-0171) (PDF) | OMM Plan | 3/14/2024 |
TE-0072 Monitoring Plan for Lost Lake Marsh Creation and Hydrologic Restoration Project (PDF) | OMM Plan | 2/14/2024 |
2024 Operations, Maintenance, and Monitoring Report for Grand-White Lakes Land Bridge Protection (PDF) | OM&M Report | 2/1/2024 |
Louisiana Department of Wildlife and Fisheries Fill Material License, License Number WLF2024020 (PDF) | PERMITS | 1/24/2024 |
Topographic Survey Report for Bayou De Cade Ridge Restoration and Marsh Creation (TE-0138) (PDF) | SURVEY REPORT | 12/8/2023 |
2023 Operations, Maintenance, and Monitoring Report for Black Bayou Culverts Hydrologic Restoration (CS-29) (PDF) | OM&M Report | 12/1/2023 |
No Name Bayou Marsh Creation and Nourishment Project (CS-0078) Bid Documents (PDF) | BID DOCUMENTS | 10/31/2023 |
Notes on Adjustment of CRMS Water Level Data for the 2021 Coastwide Survey Update (PDF) | SURVEY REPORT | 10/2/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF) | OMM Plan | 10/1/2023 |
Final Supplemental Environmental Assessment with FONSI for West Fourchon Marsh Creation (TE-134) (PDF) | NEPA COMPLIANCE DOCUMENT | 10/1/2023 |
DESIGN REPORT South Grand Chenier Baker Tract Marsh Creation (ME-32) (PDF) | DESIGN REPORT | 9/26/2023 |
2023/2024 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-2) Permanent Pipeline (PDF) | Inspection Report | 9/20/2023 |
2022 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF) | OM&M Report | 9/1/2023 |
Project Completion Report on Bayou Decade Ridge Marsh (TE-0138) Vegetative Planting (PDF) | Project Completion Report | 9/1/2023 |
Project Completion Report on Bayou Decade Ridge Marsh (TE-0138) Vegetative Planting (PDF) | Project Completion Report | 9/1/2023 |
Project Completion Report on Bayou Decade Ridge Marsh (TE-0138) Vegetative Planting (PDF) | Project Completion Report | 9/1/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF) | Project Completion Report | 8/28/2023 |
2023 Monitoring Close-Out Report for Timbalier Island Dune and Marsh Restoration (TE-40) (PDF) | OM&M Report | 8/25/2023 |
Rock Dike Profile and Settlement Plates Survey for West Lake Boudreaux Shoreline Protection and Marsh Creation Project (TE-0046) (PDF) | SURVEY REPORT | 8/17/2023 |
A Standard Operating Procedures Manual for the Coastwide Reference Monitoring System-Wetlands and the System-Wide Assessment and Monitoring Program: Methods for Site Establishment, Data Collection, and Quality Assurance/Quality Control (PDF) | General Programmatic Document | 8/12/2023 |
BS-46 General Project Fact Sheet (PDF) | General Project Fact Sheet | 8/10/2023 |
BS-46 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 8/10/2023 |
Caminada Headland Back Barrier Marsh Creation (BA-171) Final Fact Sheet (PDF) | FACT SHEET | 8/1/2023 |
Monitoring Plan for Bayou De Cade Ridge Restoration and Marsh Creation (TE-0138) (PDF) | OMM Plan | 7/7/2023 |
BS-46 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/24/2023 |
BS-46 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/24/2023 |
BA-268 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/23/2023 |
BA-268 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/23/2023 |
2022 Operations, Maintenance, and Monitoring Report for South Lake Lery Shoreline and Marsh Restoration (BS-0016) (PDF) | OM&M Report | 5/1/2023 |
Final Report, Geotechnical Engineering Report, State of Louisiana, Coastal Protection and Restoration Authority, North Delacroix Marsh Creation Project Lake Amedee and Bayou Juanita (PDF) | GEOTECHNICAL REPORT | 4/27/2023 |
Permits for TE-0134 West Fourchon Marsh Creation Nourishment Project (PDF) | PERMITS | 4/5/2023 |
Permits for TE-0134 West Fourchon Marsh Creation Nourishment Project (PDF) | PERMITS | 4/5/2023 |
Operation, Maintenance, Repair, and Rehabilitation Plan for Lost Lake Marsh Creation and Hydrologic Restoration Project (TE-0072) (PDF) | OMM Plan | 3/15/2023 |
Operation Maintenance, and Rehabilitation Plan for Bayou Decade Ridge and Marsh Creation;;;PROJECT (TE-0138) (PDF) | OMM Plan | 3/8/2023 |
Monitoring Plan for South Grand Chenier Marsh Creation Project (ME-20) (PDF) | OMM Plan | 3/1/2023 |
2023 Operations, Maintenance, and Monitoring Report for Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing (BA-0164) (PDF) | OM&M Report | 1/1/2023 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF) | DESIGN REPORT | 12/28/2022 |
2022 Operations, Maintenance, and Monitoring Report for Bayou Dupont Marsh and Ridge Creation (BA-0048) (PDF) | OM&M Report | 12/1/2022 |
2022 Operations, Maintenance and Monitoring Report for South White Lake Shoreline Protection (PDF) | OM&M Report | 12/1/2022 |
2022 Operations, Maintenance, and Monitoring Report for Sediment Trapping at the Jaws (TV-15) (PDF) | OM&M Report | 12/1/2022 |
Geotechnical Investigation Data Report (Final), State of Louisiana, Coastal Protection and Restoration Authority, North Delacroix Marsh Creation Project (PDF) | GEOTECHNICAL REPORT | 11/18/2022 |
2022 Operations, Maintenance, and Monitoring Report for West Bay Sediment Diversion (MR-0003) (PDF) | OM&M Report | 11/1/2022 |
2022 Elevation Survey Methodology Report for Northwest Turtle Bay (BA-0125) (PDF) | SURVEY REPORT | 10/27/2022 |
2022/2023 Annual Inspection Report for SABINE REFUGE MARSH CREATION PROJECT (CS-28-2) Permanent Pipeline (PDF) | Inspection Report | 10/19/2022 |
Bid Package for Mid Breton Land Bridge Marsh Creation and Terracing Project (BS-0032) (PDF) | BID DOCUMENTS | 10/17/2022 |
Bid Package for Mid Breton Land Bridge Marsh Creation and Terracing Project (BS-0032) (PDF) | BID DOCUMENTS | 10/17/2022 |
Bid Package for Mid Breton Land Bridge Marsh Creation and Terracing Project (BS-0032) (PDF) | BID DOCUMENTS | 10/17/2022 |
2022 Annual Inspection Report for the Lake Borgne Shoreline Protection Project (PDF) | Inspection Report | 10/1/2022 |
Project Completion Report for Bayou De Cade Ridge and Marsh Creation Project (TE-0138) (PDF) | Project Completion Report | 10/1/2022 |
2022 Operations, Maintenance, and Monitoring Report for Grand-White Lake Land Bridge Protection (PDF) | OM&M Report | 9/1/2022 |
Bayou Cane Marsh Creation Project PO-0181 95% Design Report (PDF) | DESIGN REPORT | 8/16/2022 |
Monitoring Plan for Cameron Creole Freshwater Introduction (CS-0049) (PDF) | OMM Plan | 8/1/2022 |
2022 Annual Inspection Report for Goose Point / Point Platte Marsh Creation Project (PDF) | Inspection Report | 7/1/2022 |
2022 Monitoring Plan for Cameron Meadows Marsh Creation and Terracing (CS-0066) (PDF) | OMM Plan | 7/1/2022 |
2022 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protections and Freshwater Bayou Bank Stabilization (PDF) | OM&M Report | 6/1/2022 |
2022 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protection and Freshwater Bayou Bank Stabilization (PDF) | OM&M Report | 6/1/2022 |
2022 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (PDF) | OM&M Report | 6/1/2022 |
Monitoring of the Lac des Allemands Swamp (BA-34-2) Hydrologic Restoration Project Annual Report - Fall 2021 (PDF) | CONTRACTED STUDY | 5/31/2022 |
2021 Monitoring Close-out Report for Isles Dernieres Restoration Whiskey Island (TE-27) and Whiskey Island Back Barrier Marsh Creation (TE-50) Projects (PDF) | OM&M Report | 5/3/2022 |
2021 Monitoring Close-out Report for Isles Dernieres Restoration Whiskey Island (TE-27) and Whiskey Island Back Barrier Marsh Creation (TE-50) Projects (PDF) | OM&M Report | 5/3/2022 |
Operation, Maintenance, and Rehabilitation Plan for the Barataria Land Bridge Shoreline Protection Project (BA-27c), Construction Units No. 7 and No. 8 (PDF) | OMM Plan | 5/2/2022 |
2021 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles – 3, 4 5 (PDF) | OM&M Report | 5/1/2022 |
2021 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles – 3, 4 5 (PDF) | OM&M Report | 5/1/2022 |
2022 Operations, Maintenance, and Monitoring Report for Grand Liard Marsh and Ridge Restoration (BA-0068) (PDF) | OM&M Report | 4/21/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF) | SURVEY REPORT | 3/29/2022 |
Monitoring Plan for Northwest Turtle Bay Marsh Creation (BA-0125) (PDF) | OMM Plan | 3/17/2022 |
Louisiana Natural Scenic River System SCENIC RIVER PREMIT #1178 (PDF) | PERMITS | 3/9/2022 |
CS-88 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/2/2022 |
CS-88 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/2/2022 |
TE-171 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/2/2022 |
TE-171 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/2/2022 |
BA-257 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/2/2022 |
BA-257 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/2/2022 |
BA-258 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/2/2022 |
BA-258 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/2/2022 |
2022 Operations, Maintenance, and Monitoring Closeout Report for Sweet Lake/Willow Lake Hydrologic Restoration (PDF) | OM&M Report | 3/1/2022 |
2021 Operations, Maintenance, and Monitoring Report for Pecan Island Terracing (ME-14) (PDF) | OM&M Report | 3/1/2022 |
Project Completion Report for Lake Borgne Shoreline Protection Project (PO-0030) Sheet Pile Wall Maintenance (2021) (PDF) | Project Completion Report | 3/1/2022 |
Hydraulic and Water Quality Modeling of Proposed River Reintroduction into Maurepas Swamp (PO-0029) (PDF) | CONTRACTED STUDY | 2/18/2022 |
Delta Wide Crevasses (MR-0009) Maintenance Event 4 Project Completion Report (PDF) | Project Completion Report | 2/1/2022 |
Geotechnical Investigation Data Report Phoenix Marsh Creation Borrow Material Study (BS-0042 and BS-0044) (PDF) | GEOTECHNICAL REPORT | 1/25/2022 |
Geotechnical Investigation Data Report Phoenix Marsh Creation Borrow Material Study (BS-0042 and BS-0044) (PDF) | GEOTECHNICAL REPORT | 1/25/2022 |
2020 Annual Inspection Report for Goose Point / Point Platte Marsh Creation Project (PO-33) (PDF) | Inspection Report | 12/1/2021 |
2020 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF) | Inspection Report | 12/1/2021 |
2021 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF) | Inspection Report | 12/1/2021 |
CS-85 Draft Environmental Assessment (PDF) | Environmental Assessment | 11/18/2021 |
2021/2022 Annual Inspection Report for East Marsh Island Marsh Creation Project (TV-21) (PDF) | Inspection Report | 11/17/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF) | DESIGN REPORT | 11/12/2021 |
Post Hurricane Monitoring Report Rockefeller Refuge Gulf Shoreline Stabilization Project (PDF) | CONTRACTED STUDY | 10/15/2021 |
2021/2022 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-2);Permanent Pipeline (PDF) | Inspection Report | 10/5/2021 |
Final Survey Report for North Delacroix Marsh Creation and Terracing Project (BS-0041): Topographic, Bathymetric,;Magnetometer and other Professional Land Survey Services (PDF) | SURVEY REPORT | 10/4/2021 |
2021 Monitoring Plan for Rockefeller Gulf Shoreline Stabilization (ME-0018) (PDF) | OMM Plan | 9/28/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 9/8/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
Design Report for Long Point Bayou (CS-0085) (PDF) | DESIGN REPORT | 9/1/2021 |
2021 Operations, Maintenance, and Monitoring Report for Coastwide Vegetative Planting Project (LA-0039) (PDF) | OM&M Report | 9/1/2021 |
2021 Operations, Maintenance, and Monitoring Report for Cameron Creole Maintenance Project (PDF) | OM&M Report | 9/1/2021 |
Post Hurricane Monitoring Report Rockefeller Refuge Gulf Shoreline Stabilization Project (PDF) | CONTRACTED STUDY | 8/18/2021 |
Geotechnical Engineering Services Report. Breton Landbridge West Marsh Creation Project (BS-0038). Plaquemines Parish, Louisiana (PDF) | GEOTECHNICAL REPORT | 8/16/2021 |
Permits for North Delacroix Marsh Creation and Terracing Project (BS-0041) (PDF) | PERMITS | 8/13/2021 |
Permits for North Delacroix Marsh Creation and Terracing Project (BS-0041) (PDF) | PERMITS | 8/13/2021 |
Monitoring Plan for Mid Breton Landbridge Marsh Creation and Terracing (BS-0032) (PDF) | OMM Plan | 8/1/2021 |
2021/2022 Annual Inspection Report for Black Bayou Culverts Hydrologic Restoration Project (CS-29) (PDF) | Inspection Report | 7/22/2021 |
C20210071, Coastal Zone Consistency (PDF) | PERMITS | 7/16/2021 |
C20210071, Coastal Zone Consistency (PDF) | PERMITS | 7/16/2021 |
Operation and Maintenance Plan for Bayou Bonfouca Marsh Creation Project (PO-0104) (PDF) | OMM Plan | 6/28/2021 |
2021 Monitoring Plan for Cameron Creole Maintenance (CS-0004a) (PDF) | OMM Plan | 6/1/2021 |
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF) | BID DOCUMENTS | 6/1/2021 |
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF) | BID DOCUMENTS | 6/1/2021 |
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF) | BID DOCUMENTS | 6/1/2021 |
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF) | BID DOCUMENTS | 6/1/2021 |
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF) | BID DOCUMENTS | 6/1/2021 |
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF) | BID DOCUMENTS | 6/1/2021 |
Monitoring of the Lac des Allemands Swamp (BA-34-2) Hydrologic Restoration - Fall 2020 (PDF) | CONTRACTED STUDY | 5/31/2021 |
Geotechnical Engineering Report (Revised) East Delacroix Marsh Creation Project, Phase II (BS-37) (PDF) | GEOTECHNICAL REPORT | 5/26/2021 |
USACE Permit MVN-2012-1081-EPP (PDF) | PERMITS | 5/17/2021 |
Mid-Breton Land Bridge Marsh Creation and Terracing (BS-32) 95% Design Report (PDF) | DESIGN REPORT | 5/7/2021 |
Phase I Environmental Site Assessment Report North Delacroix Marsh Creation Project (PDF) | CONTRACTED STUDY | 5/1/2021 |
Project Completion Report for Goose Point/Point Platte Marsh Creation (PO-0033) and Bayou Bonfouca Marsh Creation (PO-0104) Tidal Features Maintenance Project (PDF) | Project Completion Report | 4/1/2021 |
Project Completion Report for Goose Point/Point Platte Marsh Creation (PO-0033) and Bayou Bonfouca Marsh Creation (PO-0104) Tidal Features Maintenance Project (PDF) | Project Completion Report | 4/1/2021 |
BS-44 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/29/2021 |
BS-44 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/29/2021 |
TE-166 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/9/2021 |
TE-166 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/9/2021 |
BS-43 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/9/2021 |
BS-43 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/9/2021 |
Breton Landbridge Marsh Creation (West) (BS-38) Numerical Modeling and Wave Impact Analysis (PDF) | CONTRACTED STUDY | 2/26/2021 |
2020 Short Summary Report for East Marsh Island Marsh Creation (TV-21) (PDF) | OM&M Report | 2/1/2021 |
Breton Landbridge Marsh Creation (West) (BS-38) Geotechnical Data Report (PDF) | GEOTECHNICAL REPORT | 1/4/2021 |
East Delacroix Marsh Creation and Terracing (BS-37) Geotechnical Data Report (PDF) | GEOTECHNICAL REPORT | 12/11/2020 |
2020 Operations, Maintenance, and Monitoring Report for Black Bayou Culverts Hydrologic Restoration (CS-29) (PDF) | OM&M Report | 12/1/2020 |
2020 Operations, Maintenance, and Monitoring Report for Sabine Structure Replacement (CS-23) (PDF) | OM&M Report | 12/1/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF) | DATA COLLECTION | 10/30/2020 |
No Name Bayou Marsh Creation and Nourishment 95% Design Report (PDF) | DESIGN REPORT | 10/1/2020 |
Post Hurricane Laura Review: Impact on Existing Coastal Protection and Restoration Projects (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
Post Hurricane Laura Review: Impact on Existing CPRA Projects (PDF) | MEETING PRESENTATIONS AND MINUTES | 9/30/2020 |
TE-0138 Conformed Stamped Plans and Specs (PDF) | BID DOCUMENTS | 9/23/2020 |
Geotechnical Report for Long Point Bayou (CS-0085) (PDF) | GEOTECHNICAL REPORT | 9/17/2020 |
Geotechnical Report for Long Point Bayou (CS-0085) (PDF) | GEOTECHNICAL REPORT | 9/17/2020 |
Survey Report for Long Point Bayou (CS-0085) (PDF) | SURVEY REPORT | 9/14/2020 |
Survey Report for Long Point Bayou (CS-0085) (PDF) | SURVEY REPORT | 9/14/2020 |
2020 Monitoring Close-out Report for Isles Dernieres Restoration East Island (TE-20), Isles Dernieres Restoration Trinity Island (TE-24) and New Cut Dune and Marsh Restoration (TE-37) Projects (PDF) | OM&M Report | 9/1/2020 |
2020 Monitoring Close-out Report for Isles Dernieres Restoration East Island (TE-20), Isles Dernieres Restoration Trinity Island (TE-24) and New Cut Dune and Marsh Restoration (TE-37) Projects (PDF) | OM&M Report | 9/1/2020 |
2020 Monitoring Close-out Report for Isles Dernieres Restoration East Island (TE-20), Isles Dernieres Restoration Trinity Island (TE-24) and New Cut Dune and Marsh Restoration (TE-37) Projects (PDF) | OM&M Report | 9/1/2020 |
2020 Operations, Maintenance, and Monitoring Report for Jonathan Davis Wetland Restoration (BA-20) (PDF) | OM&M Report | 9/1/2020 |
East Delacroix Marsh Creation and Terracing (BS-37) Topographic, Bathymetric, Magnetometer Surveys, and Marsh Elevation Survey (PDF) | SURVEY REPORT | 8/12/2020 |
East Delacroix Marsh Creation and Terracing (BS-37) Topographic, Bathymetric, Magnetometer Surveys, and Marsh Elevation Survey (PDF) | SURVEY REPORT | 8/12/2020 |
Addendum No. 1 to Bid Documents for the Raccoon Island Restoration 2020 Vegetative Plantings Project (TE-48) (PDF) | BID DOCUMENTS | 8/6/2020 |
2020 Operations, Maintenance and Monitoring Report for Oaks/Avery Canals Hydrologic Restoration (TV-13a) (PDF) | OM&M Report | 8/1/2020 |
2020 Operations, Maintenance, and Monitoring Report for Raccoon Island Shoreline Protection/Marsh Creation (TE-48) (PDF) | OM&M Report | 8/1/2020 |
Labranche Central Marsh Creation (PO-133) 95% Design Report (PDF) | DESIGN REPORT | 8/1/2020 |
Bid Documents for Raccoon Island Vegetative Plantings (TE-48) (PDF) | BID DOCUMENTS | 7/29/2020 |
Breton Landbridge Marsh Creation (West) (BS-38) Phase I Environmental Site Assessment and Hazardous, Toxic, and Radioactive Waste Assessment (HTRW) Report (PDF) | CONTRACTED STUDY | 7/28/2020 |
East Leeville Marsh Creation and Nourishment (BA-194) 95% Design Report (PDF) | DESIGN REPORT | 7/28/2020 |
Raccoon Island Restoration Project 2020 Vegetative Plantings Project (TE-48) (PDF) | BID DOCUMENTS | 7/20/2020 |
East Delacroix Marsh Creation and Terracing (BS-37) Phase I Hazardous, Toxic, and Radioactive Waste (HTRW) Assessment Report (PDF) | CONTRACTED STUDY | 7/15/2020 |
Topographic and Bathymetric Analysis: Cheniere Ronquille (BA-0076) Shell Island West (BA-0111) (PDF) | SURVEY REPORT | 7/12/2020 |
East Leeville Marsh Creation and Nourishment (BA-194) 95% Design Drawings (PDF) | DESIGN REPORT | 7/1/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF) | BID DOCUMENTS | 6/24/2020 |
2019 Operations, Maintenance,and Monitoring Closeout Report for Fritchie Marsh Restoration (PO-06) (PDF) | OM&M Report | 6/18/2020 |
Lost Lake MCA 3 Vegetative Plantings Project (PDF) | BID DOCUMENTS | 6/17/2020 |
Lost Lake MCA 3 Vegetative Plantings Project (PDF) | BID DOCUMENTS | 6/17/2020 |
Lost Lake MCA 3 Vegetative Plantings Project (PDF) | BID DOCUMENTS | 6/17/2020 |
Lost Lake MCA 3 Vegetative Plantings Project (PDF) | BID DOCUMENTS | 6/17/2020 |
Cameron Meadows Marsh Creation and Terracing (CS-66) Coastal Zone Consistency Permit (PDF) | PERMITS | 6/12/2020 |
2020 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration (TV-14) (PDF) | OM&M Report | 6/1/2020 |
2020 Operations, Maintenance, and Monitoring Report for Freshwater Introduction South of Highway 82 (ME-0016) (PDF) | OM&M Report | 6/1/2020 |
Final Environmental Assessment with FONSI for West Fourchon Marsh Creation (TE-134) (PDF) | NEPA COMPLIANCE DOCUMENT | 6/1/2020 |
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF) | General Programmatic Document | 5/20/2020 |
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF) | General Programmatic Document | 5/20/2020 |
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF) | General Programmatic Document | 5/20/2020 |
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF) | General Programmatic Document | 5/20/2020 |
Biological Oyster Assessment for Breton Landbridge Marsh Creation (West) (BS-38) (PDF) | CONTRACTED STUDY | 5/15/2020 |
Bayou Bonfouca Marsh Creation Project (PO-104) Project Completion Report (PDF) | Project Completion Report | 5/11/2020 |
East Leeville Marsh Creation and Nourishment (BA-194) Geotechnical Engineering Report Revision 1 (PDF) | GEOTECHNICAL REPORT | 5/8/2020 |
Survey Report TE-0026 Lake Chapeau Structure # 3 Demolition at Point Au Fer (PDF) | SURVEY REPORT | 5/7/2020 |
Bayou Decade Ridge Restoration and Marsh Creation As-Built Drawings (TE-0138) (PDF) | AS-BUILT | 5/1/2020 |
BS-42 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/30/2020 |
BS-42 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/30/2020 |
TE-157 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/30/2020 |
TE-157 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/30/2020 |
Breton Landbridge Marsh Creation (West) (BS-38) Nationwide Permit Summary (PDF) | PERMITS | 4/22/2020 |
C202000025, Coastal Zone Consistency (PDF) | PERMITS | 4/17/2020 |
BS-41 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/6/2020 |
BS-41 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/6/2020 |
TE-156 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/6/2020 |
TE-156 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/6/2020 |
Breton Landbridge Marsh Creation (West) (BS-38) Geotech Permit (PDF) | PERMITS | 4/1/2020 |
Monitoring Plan for Grand Liard Marsh and Ridge Restoration (BA-0068) (PDF) | OMM Plan | 3/31/2020 |
East Leeville Marsh Creation and Nourishment Geotechnical Data Report Addendum 1 Revision 1 (PDF) | GEOTECHNICAL REPORT | 3/17/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF) | BID DOCUMENTS | 3/10/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF) | BID DOCUMENTS | 2/20/2020 |
East Delacroix Marsh Creation and Terracing (BS-37) Coastal Use Permit (PDF) | PERMITS | 1/27/2020 |
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) 95% Design Drawings (PDF) | DESIGN REPORT | 1/2/2020 |
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) 95% Design Report (PDF) | DESIGN REPORT | 1/1/2020 |
2019 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF) | Inspection Report | 1/1/2020 |
2019 Annual Inspection Report for Bayou Bonfouca Marsh Creation Project (PO-0104) (PDF) | Inspection Report | 1/1/2020 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF) | DATA COLLECTION | 12/15/2019 |
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF) | BID DOCUMENTS | 12/11/2019 |
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF) | BID DOCUMENTS | 12/11/2019 |
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF) | BID DOCUMENTS | 12/11/2019 |
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF) | BID DOCUMENTS | 12/11/2019 |
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF) | BID DOCUMENTS | 12/11/2019 |
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF) | BID DOCUMENTS | 12/11/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
BA-171 Landrights Documents (PDF) | LANDRIGHTS | 12/10/2019 |
East Leeville Marsh Creation and Nourishment (BA-194) Coastal Use Permit (PDF) | PERMITS | 12/4/2019 |
East Leeville Marsh Creation and Nourishment (BA-194) Programmatic General Permit (PDF) | PERMITS | 12/3/2019 |
Survey Methodology Report for Raccoon Island Shoreline Protection/Marsh Creation (TE-48) Project (PDF) | SURVEY REPORT | 11/21/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF) | BID DOCUMENTS | 11/12/2019 |
2019 Operations, Maintenance, and Monitoring Report for Highway 384 Hydrologic Restoration (CS-21) (PDF) | OM&M Report | 11/1/2019 |
2019 Operations, Maintenance, and Monitoring Report for Lake Portage Land Bridge Project (TV-0017) (PDF) | OM&M Report | 11/1/2019 |
2019 Operations, Maintenance, and Monitoring Report for Humble Canal Hydrologic Restoration (ME-11) (PDF) | OM&M Report | 11/1/2019 |
BA-171 Annex B Monument Data Sheet (PDF) | BID DOCUMENTS | 10/31/2019 |
Oyster Bayou Marsh Creation and Terracing Project Completion Report (PDF) | Project Completion Report | 10/24/2019 |
TE-0117 Island Road Marsh Creation and Nourishment Project 30% Design Report (PDF) | DESIGN REPORT | 10/7/2019 |
TE-0117 Island Road Marsh Creation and Nourishment Project 30% Design Report (PDF) | DESIGN REPORT | 10/7/2019 |
TE-0117 Island Road Marsh Creation and Nourishment Project 30% Design Report (PDF) | DESIGN REPORT | 10/7/2019 |
Cameron Creole Grand Bayou Marsh Creation (CS-54) CWPPRA Project FWS Construction Outreach Report (PDF) | Project Report | 10/7/2019 |
PO-104 Bayou Bonfouca Marsh Creation FWS Cwppra Outreach Report (PDF) | Project Report | 10/7/2019 |
TE-72 Lost Lake Marsh Creation and Hydrologic Restoration CWPPRA Project FWS Outreach Report (PDF) | Project Report | 10/7/2019 |
2019 Operations, Maintenance, and Monitoring Report for Delta Management at Fort St. Philip (BS-11) (PDF) | OM&M Report | 10/7/2019 |
Water Quality Modeling of Proposed River Reintroduction Into Maurepas Swamp (PO-0029) (PDF) | CONTRACTED STUDY | 10/3/2019 |
Water Quality Modeling of Proposed River Reintroduction Into Maurepas Swamp (PO-0029) (PDF) | CONTRACTED STUDY | 10/3/2019 |
BA-171 Final Permit Mod 9-26-2019 (PDF) | PERMITS | 9/26/2019 |
East Leeville Marsh Creation and Nourishment Project (BA-194) Near Leeville Final Survey Report (PDF) | SURVEY REPORT | 9/24/2019 |
East Delacroix Marsh Creation and Terracing (BS-37) Permits (PDF) | PERMITS | 9/16/2019 |
East Delacroix Marsh Creation and Terracing (BS-37) Permits (PDF) | PERMITS | 9/16/2019 |
East Delacroix Marsh Creation and Terracing (BS-37) Geotech Permit (PDF) | PERMITS | 9/16/2019 |
2019 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF) | Inspection Report | 9/1/2019 |
BA-171 Finding of No Significant Impact and
Final Supplement to the Environmental Assessment (PDF) | Environmental Assessment | 8/26/2019 |
2019 Annual Inspection Report for Delta Management at Fort St. Philip (BS-11) (PDF) | Inspection Report | 8/23/2019 |
2019 Monitoring Plan for Cole's Bayou Marsh Restoration (PDF) | OMM Plan | 8/1/2019 |
Labranche Central Marsh Creation (PO-133) 95% Design Drawings (PDF) | DESIGN REPORT | 8/1/2019 |
Monitoring Plan for Oyster Bayou Marsh Restoration (CS-0059) (PDF) | OMM Plan | 8/1/2019 |
BA-171 Appendix A Combined (PDF) | Environmental Assessment | 7/8/2019 |
BA-171 Appendix B Finding of No Significant Impact and Final Environmental Assessment (PDF) | Environmental Assessment | 7/8/2019 |
Coastwide Nutria Control Program 2018-2019 Nutria Harvest and Distribution 2018-2019 and A Survey of Nutria Herbivory Damage in Coastal Louisiana 2019 (PDF) | OM&M Report | 7/1/2019 |
BA-171 Coastal Use Permit (PDF) | PERMITS | 6/25/2019 |
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF) | PERMITS | 6/21/2019 |
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF) | PERMITS | 6/21/2019 |
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF) | PERMITS | 6/21/2019 |
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF) | PERMITS | 6/21/2019 |
BA-171 Final Permit 6-18-19 (PDF) | PERMITS | 6/18/2019 |
BA-171 Final Supplement to the Environmental Assessment (PDF) | Environmental Assessment | 6/5/2019 |
2019 Short Summary Report for East Sabine Lake Hydrologic Restoration (CS-32) (PDF) | OM&M Report | 6/1/2019 |
State of Louisiana Coastal Protection and Restoration Authority of Louisiana General: Quality Assurance Project Plan (QAPP) (PDF) | General Programmatic Document | 6/1/2019 |
Swamp Community Wetland Value Assessment. PO-0029 River Reintroduction into Maurepas Swamp. (PDF) | Wetland Value Assessment | 6/1/2019 |
2018 Operations, Maintenance, and Monitoring Report for Delta Wide Crevasses (MR-09) (PDF) | OM&M Report | 6/1/2019 |
2019 Short Summary Report for Sabine Refuge Marsh Creation Cycles - 3-4-5 (PDF) | OM&M Report | 6/1/2019 |
2019 Short Summary Report for Sabine Refuge Marsh Creation Cycles - 3-4-5 (PDF) | OM&M Report | 6/1/2019 |
BS-38 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/9/2019 |
BS-38 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/9/2019 |
BS-37 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/9/2019 |
BS-37 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/9/2019 |
BA-217 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/9/2019 |
BA-217 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/9/2019 |
CS-85 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/9/2019 |
CS-85 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/9/2019 |
2019 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF) | Inspection Report | 5/7/2019 |
2019 Annual Inspection Report for Naomi Outfall Management (PDF) | Inspection Report | 5/7/2019 |
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) Geotechnical Report Addendum #2 (PDF) | GEOTECHNICAL REPORT | 5/3/2019 |
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF) | BID DOCUMENTS | 4/16/2019 |
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF) | BID DOCUMENTS | 4/16/2019 |
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF) | BID DOCUMENTS | 4/16/2019 |
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF) | BID DOCUMENTS | 4/16/2019 |
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF) | BID DOCUMENTS | 4/16/2019 |
2019 Operations, Maintenance, and Monitoring Final Report for Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island (PDF) | OM&M Report | 4/1/2019 |
2018 Operations, Maintenance and Monitoring Report for Barataria Barrier Island Comples: Pelican Island and Pass La Mer to Chaland Pass Restoration (BA-0038) (PDF) | OM&M Report | 4/1/2019 |
2019 Annual Inspection Report for Jonathan Davis Wetland Restoration Project (PDF) | Inspection Report | 3/26/2019 |
Borrow Area Geotechnical Services. West Fourchon Marsh Creation and Nourishment Project (TE-134). Lafourche Parish, Louisiana. (PDF) | GEOTECHNICAL REPORT | 3/13/2019 |
2018 Operations, Maintenance, and Monitoring Close-out Report for Brady Canal Hydrologic Restoration (TE-28) (PDF) | OM&M Report | 3/1/2019 |
Cameron Meadows Marsh Creation and Terracing (CS-66) Programmatic General Permit (PDF) | PERMITS | 2/27/2019 |
Lost Lake Marsh Creation and Hydrologic Restoration Project Completion Report (PDF) | Project Completion Report | 2/26/2019 |
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) Geotechnical Addendum #1 (PDF) | GEOTECHNICAL REPORT | 1/18/2019 |
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation) | MEETING PRESENTATIONS AND MINUTES | 1/16/2019 |
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation) | MEETING PRESENTATIONS AND MINUTES | 1/16/2019 |
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation) | MEETING PRESENTATIONS AND MINUTES | 1/16/2019 |
BA-171 Water Quality Certification (PDF) | PERMITS | 1/16/2019 |
Operation, Maintenance and Rehabilitation Plan for the Penchant Basin Natural Resource Plan, Increment 1 Project (TE-34) (PDF) | OMM Plan | 1/8/2019 |
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF) | BID DOCUMENTS | 12/19/2018 |
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF) | BID DOCUMENTS | 12/19/2018 |
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF) | BID DOCUMENTS | 12/19/2018 |
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF) | BID DOCUMENTS | 12/19/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF) | BID DOCUMENTS | 12/14/2018 |
2018 Annual Inspection Report for Delta Wide Crevasses (MR-09) (PDF) | Inspection Report | 12/5/2018 |
2018 Operations, Maintenance, and Monitoring Report for Bayou Chevee Shoreline Protection (PO-22) (PDF) | OM&M Report | 12/1/2018 |
2018 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF) | Inspection Report | 11/19/2018 |
2018 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF) | OM&M Report | 11/1/2018 |
East Mud Lake Hydrologic Restoration Project (CS-0020) Final Maintenance Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATIONS AND MINUTES | 10/24/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF) | DESIGN REPORT | 10/11/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF) | DESIGN REPORT | 10/11/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF) | DESIGN REPORT | 10/11/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF) | DESIGN REPORT | 10/11/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF) | DESIGN REPORT | 10/11/2018 |
TE-134 West Fourchon Marsh Creation Nourishment Project 95% Design Report (PDF) | DESIGN REPORT | 10/10/2018 |
East Leeville Marsh Creation and Nourishment (BA-194) Geotechnical Data Report (PDF) | GEOTECHNICAL REPORT | 10/8/2018 |
Bayou DeCade Marsh and Ridge Creation Geotechnical Data Report and Geotechnical Engineering Report (PDF) | GEOTECHNICAL REPORT | 10/5/2018 |
Bayou DeCade Marsh and Ridge Creation Geotechnical Data Report and Geotechnical Engineering Report (PDF) | GEOTECHNICAL REPORT | 10/5/2018 |
Project Completion Report: Lake Chapeau Sediment Input and Hydrologic Restoration (TE-26) (PDF) | Project Completion Report | 10/1/2018 |
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF) | RESEARCH PROJECT SUMMARY | 9/28/2018 |
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF) | RESEARCH PROJECT SUMMARY | 9/28/2018 |
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF) | RESEARCH PROJECT SUMMARY | 9/28/2018 |
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF) | RESEARCH PROJECT SUMMARY | 9/28/2018 |
2018 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF) | Inspection Report | 9/25/2018 |
East Mud Lake Hydrologic Restoration Project (CS-0020) Final Maintenance Bid Package (PDF) | BID DOCUMENTS | 9/20/2018 |
Draft Design Report Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) (PDF) | DESIGN REPORT | 9/20/2018 |
Draft Design Report Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) (PDF) | DESIGN REPORT | 9/20/2018 |
Labranche East Marsh Creation (PO-75) 95% Design Drawings (PDF) | DESIGN REPORT | 9/14/2018 |
Labranche East Marsh Creation (PO-75) 95% Design Report (PDF) | DESIGN REPORT | 9/13/2018 |
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF) | Project Completion Report | 9/10/2018 |
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF) | Project Completion Report | 9/10/2018 |
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF) | Project Completion Report | 9/10/2018 |
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF) | BID DOCUMENTS | 9/5/2018 |
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF) | BID DOCUMENTS | 9/5/2018 |
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF) | BID DOCUMENTS | 9/5/2018 |
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF) | BID DOCUMENTS | 9/5/2018 |
TE-117 Borrow Area and Access Corridor Deliverable (Borrow Area Geophysical Survey) (PDF) | SURVEY REPORT | 9/1/2018 |
Lake Chapeau (TE-26) 2018 Maintenance Project As-Built Drawings (PDF) | AS-BUILT | 8/21/2018 |
Island Road Marsh Creation and Nourishment (TE-117) Phase II Final Geotechnical Engineering Report (Supplementary Marsh Creation Area Geotechnical Investigation) (PDF) | GEOTECHNICAL REPORT | 8/17/2018 |
2018 Annual Inspection Report North Lake Mechant Landbridge Restoration Project (TE-44) (PDF) | Inspection Report | 8/8/2018 |
2018 Operations, Maintenance, and Monitoring Close-Out Report for GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration (BA-02) (PDF) | OM&M Report | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF) | CONTRACTED STUDY | 8/1/2018 |
Topographic Survey in the Outfall Management Area of the Mississippi River Reintroduction into the Maurepas Swamp (PO-29) St. John the Baptist and St. James Parish, Louisiana (PDF) | SURVEY REPORT | 7/18/2018 |
Project Completion Report for Hydrologic Restoration and Vegetative Plantings in the Des Allemands Swamp (BA-34-2) (PDF) | Project Completion Report | 7/12/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF) | DESIGN REPORT | 7/10/2018 |
Little Lake BA-37 As-Built Drawings (Revised Perpendicular Rock Dike Alignment) (PDF) | AS-BUILT | 7/2/2018 |
Project Completion Report for Little Lake Shoreline Protection and Marsh Creation Segment 1 & 2 Demolition and Perpendicular Rock Dike Construction (PDF) | Project Completion Report | 7/1/2018 |
Project Completion Report: Raccoon Island Breakwater Rehabilitation Project (TE-48) (PDF) | Project Completion Report | 7/1/2018 |
BA-171 Bid Package Environmental Documents (PDF) | BID DOCUMENTS | 6/29/2018 |
2018 Operations, Maintenance, and Monitoring Report: Final Closeout Report for Non-rock Alternatives to Shoreline Protection Demonstration Project (PDF) | OM&M Report | 6/27/2018 |
Coastwide Nutria Control Program 2017-2018 Nutria Harvest and Distribution 2017-2018 and A Survey of Nutria Herbivory Damage in Coastal Louisiana 2018 (PDF) | OM&M Report | 6/22/2018 |
East Mud Lake Hydrologic Restoration Project (CS-0020) - Final Maintenance - Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 6/21/2018 |
Lake Chapeau Sediment Input and Hydrologic Restoration (TE-0026) 2018 Maintenance Event Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 6/7/2018 |
State of the Coast 2018: Assessing the Western Caminada-Moreau Headland's Shoreline, Elevational, Vegetative, and Avian response to Beach, Dune and Marsh Creation (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF) | MEETING PRESENTATION | 6/1/2018 |
2018 Operations, Maintenance, and Monitoring Report for Holly Beach Sand Management (CS-0031) (PDF) | OM&M Report | 6/1/2018 |
2018 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration (PDF) | OM&M Report | 6/1/2018 |
2018 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (TV-21) (PDF) | OM&M Report | 6/1/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF) | MEETING PRESENTATION | 5/31/2018 |
State of the Coast 2018: NFWF Projects and Path Forward (PDF) | MEETING PRESENTATION | 5/30/2018 |
Wave Monitoring Data Processing and Calculation of Wave Transmission Coefficients (PDF) | DATA COLLECTION | 5/22/2018 |
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) Bid Tabulation (PDF) | BID DOCUMENTS | 5/17/2018 |
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF) | BID DOCUMENTS | 5/10/2018 |
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF) | BID DOCUMENTS | 5/10/2018 |
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF) | BID DOCUMENTS | 5/10/2018 |
Geotechnical Engineering Report Caminada Headlands Back Barrier Marsh Creation Increment I (BA-171) Marsh Fill Settlement Re-Evaluation (PDF) | GEOTECHNICAL REPORT | 5/10/2018 |
TE-48 Raccoon Island Breakwater Rehabilitation As-Built Drawings (PDF) | AS-BUILT | 5/8/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Tabulation (PDF) | BID DOCUMENTS | 5/3/2018 |
BA-206 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/1/2018 |
CS-81 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/1/2018 |
BS-32 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/1/2018 |
PO-181 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/1/2018 |
BA-206 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/1/2018 |
CS-81 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/1/2018 |
BS-32 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/1/2018 |
PO-181 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/1/2018 |
Raccoon Island Maintenance/Construction Feature Removal Project (TE-48) Project Completion Report (PDF) | Project Completion Report | 5/1/2018 |
Island Road (TE-117) Geotechnical Investigation Data Report Addendum 1 (Borrow Area Geotechnical Investigation) (PDF) | GEOTECHNICAL REPORT | 4/24/2018 |
Final Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-0193) (PDF) | DATA COLLECTION | 4/18/2018 |
Final Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-0193) (PDF) | DATA COLLECTION | 4/18/2018 |
TE-48 Raccoon Island Feature Removal As-Built Drawings (PDF) | AS-BUILT | 4/17/2018 |
Mandatory Pre -Bid Conference for the Cole’s Bayou Marsh Restoration Project (TV-0063) (PDF) | MEETING PRESENTATION | 4/12/2018 |
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF) | BID DOCUMENTS | 4/11/2018 |
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF) | BID DOCUMENTS | 4/11/2018 |
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF) | BID DOCUMENTS | 4/11/2018 |
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF) | SURVEY REPORT | 4/10/2018 |
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF) | SURVEY REPORT | 4/10/2018 |
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF) | SURVEY REPORT | 4/10/2018 |
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF) | SURVEY REPORT | 4/10/2018 |
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF) | SURVEY REPORT | 4/10/2018 |
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF) | SURVEY REPORT | 4/10/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF) | SURVEY REPORT | 4/6/2018 |
2018 Operations, Maintenance, and Monitoring Closeout Report for Atchafalaya Sediment Delivery (AT-02) (PDF) | OM&M Report | 4/1/2018 |
2018 Operations, Maintenance, and Monitoring Closeout Report for Big Island Mining (AT-03) (PDF) | OM&M Report | 4/1/2018 |
River Reintroduction into Maurepas Swamp Public Meeting March 26, 2018 (PDF) | MEETING PRESENTATION | 3/26/2018 |
River Reintroduction into Maurepas Swamp Frequently Asked Questions (PDF) | General Programmatic Document | 3/26/2018 |
River Reintroduction into Maurepas Swamp (PO-0029) Project Overview (PDF) | General Programmatic Document | 3/26/2018 |
2017 Annual Inspection Report for Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF) | Inspection Report | 3/23/2018 |
2017 Annual Inspection Report for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF) | Inspection Report | 3/23/2018 |
2017 Annual Inspection Report for Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | Inspection Report | 3/22/2018 |
2017 Annual Inspection Report for Bayou Sauvage Refuge Restoration Phase I (PDF) | Inspection Report | 3/21/2018 |
2017 Annual Inspection Report for Grand Liard Marsh and Ridge Restoration (BA-68) (PDF) | Inspection Report | 3/21/2018 |
2017 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF) | Inspection Report | 3/21/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF) | BID DOCUMENTS | 3/20/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF) | BID DOCUMENTS | 3/20/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF) | BID DOCUMENTS | 3/20/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF) | BID DOCUMENTS | 3/20/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF) | BID DOCUMENTS | 3/20/2018 |
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF) | BID DOCUMENTS | 3/20/2018 |
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF) | BID DOCUMENTS | 3/15/2018 |
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF) | BID DOCUMENTS | 3/15/2018 |
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF) | BID DOCUMENTS | 3/15/2018 |
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF) | BID DOCUMENTS | 3/15/2018 |
2017 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF) | Inspection Report | 3/14/2018 |
2017 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF) | Inspection Report | 3/12/2018 |
Labranche East Marsh Creation (PO-75) 30% Design Report (PDF) | DESIGN REPORT | 3/12/2018 |
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF) | BID DOCUMENTS | 3/6/2018 |
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF) | BID DOCUMENTS | 3/6/2018 |
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF) | BID DOCUMENTS | 3/6/2018 |
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF) | BID DOCUMENTS | 3/6/2018 |
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 3/6/2018 |
Labranche East Marsh Creation (PO-75) 30% Design Drawings (PDF) | DESIGN REPORT | 3/2/2018 |
Survey Report BA-0038-1 Pelican Island (PDF) | SURVEY REPORT | 2/28/2018 |
Survey Report BA-0076 NRDA Chenier Ronquille (PDF) | SURVEY REPORT | 2/28/2018 |
Survey Report BA-0040 Scofield Island (PDF) | REFERENCE LITERATURE | 2/28/2018 |
A Standard Operating Procedures Manual for The Coastwide Reference Monitoring System-Wetlands: Methods for Site Establishment, Data Collection, and Quality Assurance/Quality Control. (PDF) | General Programmatic Document | 2/21/2018 |
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp As Built (PDF) | AS-BUILT | 2/18/2018 |
Final Geotechnical Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) Offshore Borrow Investigation (PDF) | GEOTECHNICAL REPORT | 2/15/2018 |
Final Geotechnical Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) Offshore Borrow Investigation (PDF) | GEOTECHNICAL REPORT | 2/15/2018 |
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) Geotechnical Services Report (PDF) | GEOTECHNICAL REPORT | 2/14/2018 |
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp Project (BA-34-2) As-Built Survey Report (PDF) | AS-BUILT | 2/5/2018 |
Monitoring Plan for Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing (BA-0164) (PDF) | OMM Plan | 2/1/2018 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 1/10/2018 |
Project Completion Report for the GIWW to Clovelly Restoration (BA-02) 2015 Maintenance Project (PDF) | Project Completion Report | 1/5/2018 |
2017 Operations, Maintenance, and Monitoring Report for Channel Armor Gap Crevasse (MR-06) (PDF) | OM&M Report | 1/1/2018 |
Final Report Senate Resolution No. 154 of the 2017 Regular Session (PDF) | CONTRACTED STUDY | 1/1/2018 |
Final Report Senate Resolution No. 154 of the 2017 Regular Session (PDF) | CONTRACTED STUDY | 1/1/2018 |
2017 Annal Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF) | Inspection Report | 12/4/2017 |
Coastal Protection and Restoration Authority of Louisiana (CPRA) 2017 Operations, Maintenance, and Monitoring Report: Final Closeout Report for Bio-engineered Oyster Reef Demonstration Project (LA-0008) (PDF) | OM&M Report | 12/1/2017 |
2017 Operations, Maintenance, and Monitoring Report for Dedicated Dredging on the Barataria Basin Landbridge (BA-36) (PDF) | OM&M Report | 12/1/2017 |
2017 Operations, Maintenance, and Monitoring Report for Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2 (PO-18) (PDF) | OM&M Report | 12/1/2017 |
2017 Annual Inspection Report for South Shore of the Pen Shoreline Protection and Marsh Creation (PDF) | Inspection Report | 11/15/2017 |
Operation, Maintenance and Rehabilitation Plan for the New Cut Dune and Marsh Restoration Project (TE-37) (PDF) | OMM Plan | 11/14/2017 |
Operation, Maintenance and Rehabilitation Plan for the Whiskey Island Back Barrier Island Marsh Creation Project (TE-50) (PDF) | OMM Plan | 11/13/2017 |
2017 Annual Inspection Report for Fritchie Marsh Restoration (PDF) | Inspection Report | 11/9/2017 |
2017 Annual Inspection Report for Naomi Outfall Management (PDF) | Inspection Report | 11/9/2017 |
2017 Annual Inspection Report for Barataria Bay Waterway East Shoreline Protection (PDF) | Inspection Report | 11/7/2017 |
2017 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF) | Inspection Report | 11/7/2017 |
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF) | DESIGN REPORT | 11/7/2017 |
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF) | DESIGN REPORT | 11/7/2017 |
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF) | DESIGN REPORT | 11/7/2017 |
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF) | DESIGN REPORT | 11/7/2017 |
2017 Annual Inspection Report for Caernarvon Outfall Management (BS-03a) (PDF) | Inspection Report | 11/1/2017 |
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF) | Inspection Report | 10/31/2017 |
2017 Annual Inspection Report for Little Lake Shoreline Protection/Dedicated Dredging near Round Lake (BA-37) (PDF) | Inspection Report | 10/31/2017 |
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF) | Inspection Report | 10/31/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF) | MEETING PRESENTATION | 10/18/2017 |
Governor's Advisory Commission Diversion Sub-Committee October 3, 2017 River Reintroduction Into Maurepas Swamp (PDF) | MEETING PRESENTATION | 10/3/2017 |
2017 Operations, Maintenance, and Monitoring Report for Perry Ridge Shore Protection (PDF) | OM&M Report | 10/1/2017 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 10/1/2017 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 10/1/2017 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 10/1/2017 |
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF) | Inspection Report | 9/7/2017 |
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF) | Inspection Report | 9/7/2017 |
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF) | Inspection Report | 9/7/2017 |
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake (BA-37) (PDF) | OM&M Report | 9/1/2017 |
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for Coastwide Vegetative Planting Project (LA-0039) (PDF) | OM&M Report | 9/1/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF) | DATA COLLECTION | 8/18/2017 |
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/16/2017 |
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/16/2017 |
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/16/2017 |
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/16/2017 |
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/16/2017 |
2017 Annual Inspection Report for Mississippi Sediment Delivery System - Bayou Dupont (PDF) | Inspection Report | 8/8/2017 |
East Leeville Marsh Creation and Nourishment (BA-194) Feasibility Study Technical Report (PDF) | FEASIBILITY REPORTS | 8/7/2017 |
2016 Annual Inspection Report for Mississippi Sediment Delivery System – Bayou Dupont (PDF) | Inspection Report | 8/2/2017 |
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-0052) (PDF) | OM&M Report | 8/1/2017 |
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Bayou Dupont Marsh and Ridge Creation (BA-0048) (PDF) | OMM Plan | 8/1/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF) | MEETING PRESENTATION | 7/19/2017 |
2017 Annual Inspection Report for GIWW Bank Restoration Project - Segment 4 (TE-43) (PDF) | Inspection Report | 7/13/2017 |
2017 Annual Inspection Report for Penchant Basin Natural Resource Plan, Increment No. 1 (TE-34) (PDF) | Inspection Report | 7/12/2017 |
2017 Annual Inspection Report for South Lake Decade Freshwater Introduction Project (TE-39) (PDF) | Inspection Report | 7/12/2017 |
Oyster Bayou Handout (PDF) | FACT SHEET | 7/12/2017 |
2017 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF) | Inspection Report | 7/11/2017 |
Decommission of Data Collection Platforms for LA-0016 Non-Rock Alternatives Shoreline Protection Demonstration Project (PDF) | General Programmatic Document | 7/1/2017 |
2016 Operations, Maintenance, and Monitoring Report for West Bay Sediment Diversion (MR-03) (PDF) | OM&M Report | 7/1/2017 |
Coastwide Nutria Control Program 2016-2017 Nutria Harvest and Distribution 2016-2017 and A Survey of Nutria Herbivory Damage in Coastal Louisiana 2017 (PDF) | OM&M Report | 6/16/2017 |
2016/2017 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-2) Permanent Pipeline (PDF) | Inspection Report | 6/15/2017 |
2016-2017 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-4&5) (PDF) | Inspection Report | 6/15/2017 |
CS-66 Environmental Assessment 2017 (PDF) | Environmental Assessment | 6/7/2017 |
Performance measures for a Mississippi River reintroduction into the forested wetlands of Maurepas Swamp (PDF) | CONTRACTED STUDY | 6/1/2017 |
Survey Methodology Report Topographic and Magnetometer Surveys of the Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) (PDF) | SURVEY REPORT | 6/1/2017 |
Survey Methodology Report Topographic and Magnetometer Surveys of the Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) (PDF) | SURVEY REPORT | 6/1/2017 |
2017 Operations, Maintenance, and Monitoring Report for Cote Blanche Hydrologic Restoration (TV-04) (PDF) | OM&M Report | 6/1/2017 |
Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) Topographic, Bathymetric, and Magnetometer Surveys February - April 2017 (PDF) | SURVEY REPORT | 5/31/2017 |
Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) Topographic, Bathymetric, and Magnetometer Surveys February - April 2017 (PDF) | SURVEY REPORT | 5/31/2017 |
Labranche East Marsh Creation (PO-75) Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 5/26/2017 |
2016/2017 Annual Inspection Report for East Marsh Island Marsh Creation Project (TV-21) (PDF) | Inspection Report | 5/16/2017 |
Monitoring Plan for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) (PDF) | OMM Plan | 5/8/2017 |
Coastal Protection and Restoration Authority 2017 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (BA-0002) (PDF) | Inspection Report | 5/1/2017 |
(TE-43) Bank Restoration of Critical Areas - Segment No. 4, (EB-10) GIWW Breach Closure Project - Segment No. 6, and (TE-34) Penchant Basin Natural Resource Plan - Increment 1 Data Collection Report (PDF) | DATA COLLECTION | 4/4/2017 |
(TE-43) Bank Restoration of Critical Areas - Segment No. 4, (EB-10) GIWW Breach Closure Project - Segment No. 6, and (TE-34) Penchant Basin Natural Resource Plan - Increment 1 Data Collection Report (PDF) | DATA COLLECTION | 4/4/2017 |
2016/2017 Annual Inspection Report for Hwy 384 Hydrologic Restoration Project (CS-21) (PDF) | Inspection Report | 3/23/2017 |
2015 Annual Inspection Report for Delta Wide Crevasses (MR-0009) (PDF) | Inspection Report | 3/21/2017 |
State of Louisiana Coastal Protection and Restoration Authority Topographic and Bathymetric Survey of the West Belle Pass Barrier Headland Restoration (TE-0052) Project Lafourche Parish, Louisiana (PDF) | SURVEY REPORT | 3/9/2017 |
2016/2017 Annual Inspection Report for Black Bayou Culverts Hydrologic Restoration Project (CS-29) (PDF) | Inspection Report | 3/7/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF) | CONTRACTED STUDY | 2/28/2017 |
LA-284 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/21/2017 |
LA-284 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/21/2017 |
PO-179 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/21/2017 |
PO-179 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/21/2017 |
PO-178 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/21/2017 |
PO-178 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/21/2017 |
TE-138 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/21/2017 |
TE-138 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/21/2017 |
LA Outer Coast Monitoring Plan_Original_2017 (PDF) | OMM Plan | 2/6/2017 |
Island Road Marsh Creation/Nourishment (TE-117) Geotechnical Investigation Data Report (Supplementary Marsh Creation Area Phase II Geotechnical Investigation) (PDF) | GEOTECHNICAL REPORT | 2/1/2017 |
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (BA-35) (PDF) | OM&M Report | 2/1/2017 |
West Belle Pass Barrier Headland Restoration Vegetative Planting (PDF) | BID DOCUMENTS | 1/19/2017 |
BA-37 Survey Data - Bathymetric Data (PDF) | SURVEY REPORT | 1/19/2017 |
Marsh Creation Area Grid Survey & Rock Dike Jetty Creation Survey Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake Project BA-37 Lafourche Parish, Louisiana (PDF) | SURVEY REPORT | 1/19/2017 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF) | Project Completion Report | 12/23/2016 |
Little Lake Shoreline Protection/Dedicataed Dredging Near Round Lake Project BA-37 Lafourche Parish, Louisiana Marsh Creation Area Grid Survey & Rock Dike Jetty Creation Survey (PDF) | SURVEY REPORT | 12/14/2016 |
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System-Bayou Dupont (BA-0039) (PDF) | OM&M Report | 12/1/2016 |
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1 (PO-16) (PDF) | OM&M Report | 11/1/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Notice of Award (PDF) | BID DOCUMENTS | 11/1/2016 |
PO-104 Bayou Bounfouca Aerial Photos (PDF) | DESIGN REPORT | 10/19/2016 |
Caminada Headland Back Barrier Marsh Creation Project 95% Design Report (PDF) | DESIGN REPORT | 10/14/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 10/13/2016 |
Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 10/6/2016 |
Northwest Turtle Bay Marsh Creation 95% Design Report (PDF) | DESIGN REPORT | 10/1/2016 |
Section 4 Survey Drawings (PDF) | SURVEY REPORT | 9/30/2016 |
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF) | BID DOCUMENTS | 9/29/2016 |
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF) | BID DOCUMENTS | 9/29/2016 |
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF) | BID DOCUMENTS | 9/29/2016 |
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF) | BID DOCUMENTS | 9/29/2016 |
Oyster Bayou Marsh Creation and Terracing Bid Tabulation Sheet (PDF) | BID DOCUMENTS | 9/9/2016 |
2016 Annual Inspection Report for Delta Management at Fort St. Philip (BS-0011) (PDF) | Inspection Report | 9/9/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF) | BID DOCUMENTS | 9/7/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF) | MEETING PRESENTATION | 8/31/2016 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 8/30/2016 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 8/30/2016 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 8/30/2016 |
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF) | BID DOCUMENTS | 8/30/2016 |
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF) | FACT SHEET | 8/1/2016 |
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF) | FACT SHEET | 8/1/2016 |
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF) | FACT SHEET | 8/1/2016 |
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF) | FACT SHEET | 8/1/2016 |
2016 Operations, Maintenance and Monitoring Report for Oaks/Avery Canals Hydrologic Restoration (PDF) | OM&M Report | 8/1/2016 |
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Caernarvon Diversion Outfall Management (BS-03a) (PDF) | OM&M Report | 7/28/2016 |
2016 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF) | Inspection Report | 7/28/2016 |
2016 Annual Inspection Report for Lake Chapeau Sediment Input and Hydrologic Restoration Project (PDF) | Inspection Report | 7/25/2016 |
2016 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF) | Inspection Report | 7/20/2016 |
2016 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF) | Inspection Report | 7/15/2016 |
PO-0104 Notice to Proceed (PDF) | BID DOCUMENTS | 7/15/2016 |
2016/2017 Annual Inspection Report for East Sabine Lake Hydrologic Restoration Project (CS-32) (PDF) | Inspection Report | 7/14/2016 |
2016 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF) | Inspection Report | 7/11/2016 |
2016 Annual Inspection Report for South Shore of the Pen Shoreline Protection and Marsh Creation (PDF) | Inspection Report | 7/11/2016 |
Monitoring Plan for Hydrologic Restoration and Vegetative Planting in the Lac des Allemands Swamp (BA-34-2) (PDF) | OMM Plan | 7/1/2016 |
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Lake Hermitage Marsh Creation (BA-42) (PDF) | OMM Plan | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF) | SURVEY REPORT | 7/1/2016 |
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Cameron - Creole Watershed Grand Bayou Marsh Creation (CS-0054) (PDF) | OMM Plan | 7/1/2016 |
2016 Annual Inspection Report for CAERNARVON OUTFALL MANAGEMENT (BS-03a) (PDF) | Inspection Report | 7/1/2016 |
PO-104 Bayou Bonfouca Notice of Award (PDF) | BID DOCUMENTS | 6/27/2016 |
Coastwide Vegetative Planting - East Grand Terre Project -Addendum 1 (PDF) | BID DOCUMENTS | 6/27/2016 |
2015/2016 Annual Inspection Report for Sabine Refuge Marsh Creation Project (PDF) | Inspection Report | 6/22/2016 |
2015/2016 Annual Inspection Report for Lake Portage Land Bridge Project (PDF) | Inspection Report | 6/16/2016 |
2016 Annual Inspection Report for Barataria Bay Waterway East Shoreline Protection (PDF) | Inspection Report | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
New Orleans Region Construction Projects, June 15, 2016 (PDF) | MEETING PRESENTATION | 6/15/2016 |
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF) | Inspection Report | 6/14/2016 |
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF) | Inspection Report | 6/14/2016 |
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF) | Inspection Report | 6/14/2016 |
2016 Annual Inspection Report for Naomi Outfall Management (PDF) | Inspection Report | 6/9/2016 |
Coastwide Nutria Control Program 2015-2016 Nutria Harvest and Distribution 2015-2016 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2016 (PDF) | OM&M Report | 6/7/2016 |
Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF) | SURVEY REPORT | 6/3/2016 |
Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF) | SURVEY REPORT | 6/3/2016 |
State of Louisiana Coastal Protection and Restoration Authority Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF) | CONTRACTED STUDY | 6/3/2016 |
State of Louisiana Coastal Protection and Restoration Authority Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF) | CONTRACTED STUDY | 6/3/2016 |
2016 Operations, Maintenance, and Monitoring Report for Humble Canal Hydrologic Restoration (PDF) | OM&M Report | 6/1/2016 |
2016 Operations, Maintenance, and Monitoring Report for GIWW - Perry Ridge West Bank Stabilization (PDF) | OM&M Report | 6/1/2016 |
2016 Operations, Maintenance, and Monitoring Report for Little Vermilion Bay Sediment Trapping (PDF) | OM&M Report | 6/1/2016 |
2016 Operations, Maintenance, and Monitoring Report for West Belle Pass Headland Restoration (TE-23) (PDF) | OM&M Report | 6/1/2016 |
2016 Annual Inspection Report for Fritchie Marsh Restoration (PDF) | Inspection Report | 5/31/2016 |
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF) | BID DOCUMENTS | 5/26/2016 |
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF) | BID DOCUMENTS | 5/26/2016 |
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF) | BID DOCUMENTS | 5/26/2016 |
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF) | BID DOCUMENTS | 5/26/2016 |
Bayou Bonfouca Marsh Creation Addendum 4 (PDF) | BID DOCUMENTS | 5/23/2016 |
2016 Annual Inspection Report for Little Lake Shoreline Protection/ Dedicated Dredging Near Round Lake (BA-37) (PDF) | Inspection Report | 5/19/2016 |
Bayou Bonfouca Marsh Creation Addendum 2 (PDF) | BID DOCUMENTS | 5/17/2016 |
Bayou Bonfouca Marsh Creation Addendum 3 (PDF) | BID DOCUMENTS | 5/16/2016 |
PO-0104 Pre-bid Attendance Record (PDF) | BID DOCUMENTS | 5/16/2016 |
Bayou Bonfouca Marsh Creation Addendum 1 (PDF) | BID DOCUMENTS | 5/13/2016 |
Black Bayou Culverts Bid Instructions (PDF) | BID DOCUMENTS | 5/12/2016 |
Black Bayou Culverts Bid Terms and Conditions - Attachment A (PDF) | BID DOCUMENTS | 5/12/2016 |
Black Bayou Culverts Hydrologic Restoration Bid Specifications - Attachment B (PDF) | BID DOCUMENTS | 5/8/2016 |
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF) | BID DOCUMENTS | 5/8/2016 |
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF) | BID DOCUMENTS | 5/8/2016 |
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF) | BID DOCUMENTS | 5/8/2016 |
2015/2016 Annual Inspection Report for Sediment Trapping At The Jaws Project (PDF) | Inspection Report | 5/5/2016 |
2016 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (PDF) | Inspection Report | 5/3/2016 |
2016 Annual Inspection Report for Goose Point/Point Platte Marsh Creation Project (PDF) | Inspection Report | 4/28/2016 |
2016 Annual Inspection Report for South Lake Decade Freshwater Introduction Project (TE-39) (PDF) | Inspection Report | 4/27/2016 |
Island Road Marsh Creation and Nourishment Project No. (TE-117) Data Collection Report (PDF) | DATA COLLECTION | 4/27/2016 |
2016 Annual Inspection Report for Raccoon Island Shoreline Protection/ Marsh Creation Project and Raccoon Island Breakwater Demonstration Project (PDF) | Inspection Report | 4/26/2016 |
2016 Annual Inspection Report for Raccoon Island Shoreline Protection/ Marsh Creation Project and Raccoon Island Breakwater Demonstration Project (PDF) | Inspection Report | 4/26/2016 |
2015/2016 Annual Inspection Report for Four Mile Canal Terracing and Sediment Trapping Project (PDF) | Inspection Report | 4/21/2016 |
2016 Annual Inspection Report for West Lake Boudreaux Shoreline Protection and Marsh Creation Project (TE-46) (PDF) | Inspection Report | 4/15/2016 |
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF) | BID DOCUMENTS | 4/5/2016 |
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF) | BID DOCUMENTS | 4/5/2016 |
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF) | BID DOCUMENTS | 4/5/2016 |
Coastwide Vegetative Planting - East Grand Terre Project Plans (PDF) | BID DOCUMENTS | 4/1/2016 |
Coastwide Vegetative Planting East Grant Terre Project Specifications (PDF) | BID DOCUMENTS | 4/1/2016 |
2015/2016 Annual Inspection Report for Freshwater Bayou Wetlands Project (PDF) | Inspection Report | 3/4/2016 |
2015/2016 Annual Inspection Report for Freshwater Bayou Canal Bank Stabilization Project (PDF) | Inspection Report | 3/4/2016 |
2015 Annual Inspection Report Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF) | Inspection Report | 3/2/2016 |
Appendix C: Geotechnical Investigation Data Report Caminada Headlands Back Barrier Marsh Creation Project (PDF) | GEOTECHNICAL REPORT | 3/1/2016 |
Bayou Bonfouca Louisiana Uniform Public Work Bid Forms (PDF) | BID DOCUMENTS | 2/29/2016 |
Island Road Marsh Creation and Nourishment Project (TE-117) Final Plan Set (PDF) | DESIGN REPORT | 2/29/2016 |
Bayou Bonfouca Marsh Creation Plan Set with Seal (PDF) | BID DOCUMENTS | 2/29/2016 |
Bayou Bonfouca Marsh Creation Bid Specifications with Seal (PDF) | BID DOCUMENTS | 2/29/2016 |
Lost Lake Marsh Creation and Hydrologic Restoration Louisiana Department of Wildlife and Fisheries Fill Material License WLF201626 (PDF) | PERMITS | 2/15/2016 |
South Grand Chenier Marsh Creation Design Report February 2016 (PDF) | DESIGN REPORT | 2/1/2016 |
2016 Operations, Maintenance and Monitoring Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island GUlly (PDF) | OM&M Report | 2/1/2016 |
Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Clear Marais Shoreline Protection (CS-0022) (PDF) | OM&M Report | 2/1/2016 |
BA-37 Survey Report Segment 2 (PDF) | SURVEY REPORT | 2/1/2016 |
BA-37 Survey Report Segment 1 (PDF) | SURVEY REPORT | 2/1/2016 |
No Name Bayou Marsh Creation U S Army Corps of Engineers Permit MVN 2015-2171 WB (PDF) | PERMITS | 1/21/2016 |
West Bay 2015 Depth Analysis Process Report (PDF) | SURVEY REPORT | 1/1/2016 |
CONTROLS ON THE SUCCESSFUL USE OF DREDGED SEDIMENTS FOR THE RESTORATION AND REHABILITATION OF BRACKISH MARSHES ON THE BARATARIA BASIN LANDBRIDGE (PDF) | CONTRACTED STUDY | 12/31/2015 |
2015/2016 Annual Inspection Report for Freshwater Introduction South of Highway 82 Project (PDF) | Inspection Report | 11/5/2015 |
South Shore of the Pen Shoreline Protection and Marsh Creation Operation, Maintenance, and Rehabilitation Plan (PDF) | OMM Plan | 11/4/2015 |
TE-28 2015 Annual Inspection Report (PDF) | Inspection Report | 11/4/2015 |
Coastal Zone Consistency Soil Borings No Name Bayou Marsh Creation (PDF) | PERMITS | 11/3/2015 |
2015 Operations, Maintenance, and Monitoring Report for Terrebonne Bay Shore Protection Demonstration (TE-0045) (PDF) | OM&M Report | 11/1/2015 |
Operation, Maintenance and Rehabilitation Plan for the GIWW Bank Restoration of Critical Areas - Segment No. 4 (TE-43) (PDF) | OMM Plan | 11/1/2015 |
2015/2016 Annual Inspection Report for Cote Blanche Hydrologic Restoration Project (PDF) | Inspection Report | 10/19/2015 |
Coastal Protection and Restoration Authority 2015 Short Summary Report for Highway 384 Hydrologic Restoration (CS-0021) (PDF) | DATA COLLECTION | 10/15/2015 |
Bayou Bonfouca Marsh Creation 95% Design Report (PDF) | DESIGN REPORT | 10/15/2015 |
2015 Operations, Maintenance, and Monitoring Report for East Mud Lake Marsh Management CS-20 (PDF) | OM&M Report | 10/1/2015 |
TE-48 and TE-29 2015 Annual Inspection Report (PDF) | Inspection Report | 10/1/2015 |
TE-48 and TE-29 2015 Annual Inspection Report (PDF) | Inspection Report | 10/1/2015 |
BA-37 2015 Annual Inspection Report (PDF) | Inspection Report | 10/1/2015 |
CS-20 2015 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 10/1/2015 |
2015 Annual Inspection Report for Lake Chapeau Sediment Input and Hydrologic Restoration Project (PDF) | Inspection Report | 9/28/2015 |
TE-43 2015 Annual Inspection Report (PDF) | Inspection Report | 9/21/2015 |
2015 Annual Inspection Report for Barataria Landbridge (PDF) | Inspection Report | 9/10/2015 |
2015 Annual Inspection Report for Barataria Landbridge (PDF) | Inspection Report | 9/10/2015 |
2015 Annual Inspection Report for Barataria Landbridge (PDF) | Inspection Report | 9/10/2015 |
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for South Lake Lery Shoreline and Marsh Restoration BS-0016 (PDF) | OMM Plan | 9/1/2015 |
TE-22 2015 Annual Inspection Report (PDF) | Inspection Report | 8/28/2015 |
TE-34 2015 Annual Inspection Report (PDF) | Inspection Report | 8/28/2015 |
BA-23 2015 Annual Inspection Report (PDF) | Inspection Report | 8/24/2015 |
BA-26 2015 Annual Inspection Report (PDF) | Inspection Report | 8/24/2015 |
BA-02 2015 Annual Inspection Report (PDF) | Inspection Report | 8/24/2015 |
AT-02 2015 Inspection Report (PDF) | Inspection Report | 8/24/2015 |
BA-03c 2015 Annual Inspection Report (PDF) | Inspection Report | 8/24/2015 |
TV-17 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 8/20/2015 |
2014/2015 Annual Inspection Report for Lake Portage Land Bridge Project (TV-0017) (PDF) | Inspection Report | 8/20/2015 |
2015 Operations, Maintenance, and Monitoring Report for Bayou Chevee Shoreline Protection (PO-22) (PDF) | OM&M Report | 8/10/2015 |
2015 Annual Inspection Report for HOPEDALE HYDROLOGIC RESTORATION (PO-24) (PDF) | Inspection Report | 8/10/2015 |
2015 Annual Inspection Report for BAYOU CHEVEE SHORELINE PROTECTION (PO-22) (PDF) | Inspection Report | 8/7/2015 |
Section 2 Survey Field Notes (PDF) | SURVEY REPORT | 8/7/2015 |
Section 3 Survey Point Data (PDF) | SURVEY REPORT | 8/7/2015 |
Annex C Nomogram (PDF) | SURVEY REPORT | 8/7/2015 |
TE-52 2015 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2015 |
2015 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-52) (PDF) | OM&M Report | 8/1/2015 |
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Royal Engineers (PDF) | Project Completion Report | 7/27/2015 |
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Jansen, Inc. (PDF) | Project Completion Report | 7/27/2015 |
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Living Shoreline Solutions, Inc. (PDF) | Project Completion Report | 7/27/2015 |
Cameron Meadows Marsh Creation and Terracing (CS-66) Geotechnical Data Report (PDF) | GEOTECHNICAL REPORT | 7/27/2015 |
Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Engineering Services (Exploratory Marsh Creation Area Geotechnical Investigation) (PDF) | GEOTECHNICAL REPORT | 7/17/2015 |
Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Data Report (Exploratory Marsh Creation Area Geotechnical Investigation) (PDF) | GEOTECHNICAL REPORT | 7/15/2015 |
2015 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF) | Inspection Report | 7/7/2015 |
Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report (PDF) | SURVEY REPORT | 7/6/2015 |
2015 Annual Inspection Report for South Shore of The Pen Shoreline Protection and Marsh Creation (PDF) | Inspection Report | 7/1/2015 |
Investigations of coal and petroleum coke occurrences in restoration projects using Mississippi River sediment report (PDF) | CONTRACTED STUDY | 7/1/2015 |
Investigations of coal and petroleum coke occurrences in restoration projects using Mississippi River sediment report (PDF) | CONTRACTED STUDY | 7/1/2015 |
Investigations of coal and petroleum coke occurrences in restoration projects using Mississippi River sediment report (PDF) | CONTRACTED STUDY | 7/1/2015 |
Coastwide Nutria Control Program 2014-2015 Nutria Harvest and Distribution 2014-2015 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2015 (PDF) | OM&M Report | 6/30/2015 |
2014/2015 Annual Inspection Report for Pecan Island Terracing Project (ME-0014) (PDF) | Inspection Report | 6/30/2015 |
ME-14 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 6/30/2015 |
PO-06 2015 Annual Inspection Report (PDF) | Inspection Report | 6/29/2015 |
TV-14 2014/2015 Annual Inspection Report
Report (PDF) | Inspection Report | 6/25/2015 |
2014/2015 Annual Inspection Report for Marsh Island Hydrologic Restoration Project (TV-0014) (PDF) | Inspection Report | 6/25/2015 |
2014/2015 Annual Inspection Report for Four Mile Canal Terracing and Sediment Trapping Project TV-0018 (PDF) | Inspection Report | 6/24/2015 |
TV-18 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 6/24/2015 |
Coastal Use Permit/Consistency Determination Oyster Bayou Marsh Creation and Terracing (PDF) | PERMITS | 6/10/2015 |
CS-28-2 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 6/8/2015 |
2014/2015 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-0028-2) (PDF) | Inspection Report | 6/8/2015 |
BS-11 2015 Annual Inspection Report (PDF) | Inspection Report | 6/2/2015 |
PO-33 2015 Annual Inspection Report (PDF) | Inspection Report | 6/2/2015 |
CS-59 Environmental Assessment (PDF) | Environmental Assessment | 6/1/2015 |
2015 Operations, Maintenance, and Monitoring Report for Vermilion River Cutoff Bank Protection (PDF) | OM&M Report | 6/1/2015 |
2015 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF) | OM&M Report | 6/1/2015 |
2015 Operations, Maintenance, and Monitoring Report for East Sabine Lake Hydrologic Restoration (PDF) | OM&M Report | 6/1/2015 |
2015 Operations, Maintenance, and Monitoring Report for Freshwater Introduction South of Highway 82 (PDF) | OM&M Report | 6/1/2015 |
2015 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 4 and 5. (PDF) | OMM Plan | 6/1/2015 |
2015 Annual Inspection Report for CAERNARVON OUTFALL MANAGEMENT (BS-03a) (PDF) | Inspection Report | 6/1/2015 |
GIWW to Clovelly Hydrologic Restoration 2015 Maintenance Project (PDF) | AS-BUILT | 6/1/2015 |
Cameron Meadows Marsh Creation and Terracing (CS-66) Geotechnical Engineering Services (PDF) | GEOTECHNICAL REPORT | 5/22/2015 |
2014/2015 Annual Inspection Report for Hwy 384 Hydrologic Restoration Project CS-0021 (PDF) | Inspection Report | 5/11/2015 |
CS-21 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 5/11/2015 |
Raccoon Island Shoreline Protection/Marsh Creation (TE-48) Project, Terrebonne Parish, Louisiana Survey Report (PDF) | SURVEY REPORT | 5/5/2015 |
ME-19 2015 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2015 |
TV-03 2015 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2015 |
TV-03 2015 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2015 |
Bayou Bonfouca Marsh Creation Biological Evaluation (PDF) | CONTRACTED STUDY | 5/1/2015 |
2014/2015 Annual Inspection Report for Sediment Trapping At The Jaws Project (TV-0015) (PDF) | Inspection Report | 4/30/2015 |
TV-15 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 4/30/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
Cole's Bayou Marsh Restoration 30% Design Report (PDF) | DESIGN REPORT | 4/29/2015 |
2016 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF) | Inspection Report | 4/20/2015 |
TE-44 2015 Annual Inspection Report (PDF) | Inspection Report | 4/8/2015 |
2015 Monitoring Plan for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (BE-0035) (PDF) | OMM Plan | 4/1/2015 |
2015 Monitoring Plan for Pelican Island and Pass La Mer to Chaland Pass Restoration (BA-0038) (PDF) | OMM Plan | 4/1/2015 |
Cameron Meadows Marsh Creation and Terracing (CS-66) Geophysical Investigations Data Report (PDF) | GEOTECHNICAL REPORT | 4/1/2015 |
2014/2015 Annual Inspection Report for East Marsh Island Marsh Creation Project TV-0021 (PDF) | Inspection Report | 3/30/2015 |
TV-21 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 3/30/2015 |
LA-09 Project Completion Report (PDF) | Project Completion Report | 3/26/2015 |
West Belle Pass Barrier Headland Restoration (TE-52) Project - Bathymetric and Topographic Survey (PDF) | SURVEY REPORT | 2/25/2015 |
Geotechnical Investigation Data Report PO-104 Bayou Bonfouca Marsh Creation Project Expanded Borrow Area Investigation (PDF) | GEOTECHNICAL REPORT | 2/24/2015 |
Island Road Marsh Creation and Nourishment Permit MVN 2014-2677 WB (PDF) | PERMITS | 1/23/2015 |
Survey Plan Methodology Report January 22, 2015 State of Louisiana, Coastal Protection and Restoration Authority (CPRA) Cole's Bayou Marsh Restoration (TV-0063) Amendment 2 Vermilion Parish, La (PDF) | SURVEY REPORT | 1/22/2015 |
2014/2015 Annual Inspection Report for Holly Beach Sand Management CS-0031 (PDF) | Inspection Report | 12/12/2014 |
Island Road Marsh Creation and Nourishment Coastal Use Permit P20141474 (PDF) | PERMITS | 12/5/2014 |
State of Louisiana Coastal Protection and Restoration Authority Cole's Bayou Marsh Creation and Hydrological Restoration (TV-0063) Magnetometer Survey Equipment Access, Pipeline Corridor, and Borrow Area, Vermilion Parish, Louisiana (PDF) | SURVEY REPORT | 12/3/2014 |
Cole's Bayou Marsh Hydrodynamic Modeling Report (PDF) | CONTRACTED STUDY | 12/2/2014 |
Cole's Bayou Marsh Hydrodynamic Modeling Report (PDF) | CONTRACTED STUDY | 12/2/2014 |
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2014 |
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2014 |
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028) (CS-0028-1) (CS-0028-3) (PDF) | OM&M Report | 12/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028) (CS-0028-1) (CS-0028-3) (PDF) | OM&M Report | 12/1/2014 |
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP Modification #2 (PDF) | PERMITS | 11/24/2014 |
Grand Lake Shoreline Protection Tebo Point Water Quality Certification WQC 140602-01 (PDF) | PERMITS | 11/21/2014 |
CS-31 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 11/12/2014 |
CS-23 2014/2015 Annual Inspection Report (PDF) | Inspection Report | 11/12/2014 |
2014/2015 Annual Inspection Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-0023) (PDF) | Inspection Report | 11/12/2014 |
Joint Permit Application for Island Road Marsh Creation and Nourishment Exploratory Geotech at Fill Site (PDF) | PERMITS | 11/6/2014 |
Island Road Marsh Creation and Nourishment CAD Package for Exploratory Geotech at Fill Site (PDF) | PERMITS | 11/1/2014 |
Highway 384 Hydrologic Restoration Project Maintenance Event Bid Package (PDF) | BID DOCUMENTS | 11/1/2014 |
Annex A CPRA Maps and Scope of Services for Topographic, Bathymetric, Magnetometer, and Geophysical Surveys for Caminada Headlands Back Barrier Marsh Creation Project (BA-171) (PDF) | SURVEY REPORT | 11/1/2014 |
GIWW Bank Restoration of Critical Areas in Terrebonne Project Completion Report (PDF) | Project Completion Report | 10/17/2014 |
LA-08 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 10/1/2014 |
2014 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028-1), (CS-0028-3) (PDF) | OMM Plan | 10/1/2014 |
2014 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028-1), (CS-0028-3) (PDF) | OMM Plan | 10/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Bioengineered Oyster Reef Demonstration Project (LA-08) (PDF) | OM&M Report | 10/1/2014 |
2014 Annual Inspection Report Hopedale Hydrologic Restoration (PDF) | Inspection Report | 9/16/2014 |
Operations, Maintenance, and Rehabilitation Plan for Oyster Bayou Marsh Restoration Project (CS-59) (PDF) | OMM Plan | 9/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Jonathan Davis Wetland Restoration (BA-20) (PDF) | OM&M Report | 9/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Bayou LaBranche Wetland Creation (PO-17) (PDF) | OM&M Report | 9/1/2014 |
BA-20 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2014 |
PO-24 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2014 |
PO-17 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2014 |
Bayou Bonfouca Borrow Area Survey (PDF) | SURVEY REPORT | 8/8/2014 |
Final Design Report Cole's Bayou Marsh Restoration Project (TV-63) (PDF) | GEOTECHNICAL REPORT | 8/4/2014 |
TE-26 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2014 |
PO-33 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/23/2014 |
Grand Liard Marsh and Ridge Restoration Permit Modifications #5 (07/21/2014) (PDF) | PERMITS | 7/21/2014 |
PO-33 2014 Annual Inspection Report (PDF) | Inspection Report | 7/16/2014 |
2014 Annal Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF) | Inspection Report | 7/11/2014 |
2014 Annual Inspection Report for Fritchie Marsh Restoration (PDF) | Inspection Report | 7/8/2014 |
2014 Annual Inspection Report Barataria Bay Waterway East Shoreline Protection (PDF) | Inspection Report | 7/7/2014 |
2014 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF) | Inspection Report | 7/7/2014 |
2014 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF) | Inspection Report | 7/7/2014 |
2014 Annual Inspection Report for NAOMI OUTFALL MANAGEMENT (PDF) | Inspection Report | 7/7/2014 |
GIWW To Clovelly Hydrologic Restoration (BA-0002) (PDF) | SURVEY REPORT | 7/1/2014 |
2014 Annual Inspection Report for CAERNARVON OUTFALL MANAGEMENT (BS-03a) (PDF) | Inspection Report | 7/1/2014 |
BA-48 Coastal Protection & Restoration Authority Quarterly Progress Report July 2014 (PDF) | General Programmatic Document | 7/1/2014 |
Coastwide Nutria Control Program 2013-2014 Nutria Harvest and Distribution 2013-2014 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2014 (PDF) | OM&M Report | 6/30/2014 |
Coastal Protection and Restoration Authority Whiskey Island Back Barrier Marsh Creation Project Final Report TE-50 (PDF) | SURVEY REPORT | 6/20/2014 |
BS-11 Delta Management at Fort St. Philip (BS-11) 2014 Annual Inspection Report (PDF) | Inspection Report | 6/17/2014 |
2014 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF) | Inspection Report | 6/4/2014 |
Grand Liard Marsh and Ridge Restoration Permit Modifications #4 (06/03/2014) (PDF) | PERMITS | 6/3/2014 |
CS-18 2014 Operations, Maintenance, and Monitoring and Final Close Out Report (PDF) | OM&M Report | 6/1/2014 |
CS-24 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2014 |
ME-04 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2014 |
TV-04 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2014 |
TV-09 2014 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protection (ME-0004) (PDF) | OM&M Report | 6/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Boston Canal/Vermilion Bay Shoreline Stabilization Project (TV-0009) (PDF) | OM&M Report | 6/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Perry Ridge Shore Protection (CS-0024) (PDF) | OM&M Report | 6/1/2014 |
2014 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration TV-0014 (PDF) | OM&M Report | 6/1/2014 |
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2014 Post-Construction Survey;Monitoring Report (PDF) | SURVEY REPORT | 6/1/2014 |
October 23, 2014 Task Force Meeting Funding Transfer Presentation ME-21 Grand Lake Shoreline Protection Project (PDF) | MEETING PRESENTATION | 5/22/2014 |
Lost Lake Marsh Creation and Hydrologic Restoration Finding of No Significant Impact (PDF) | Environmental Assessment | 5/6/2014 |
Lost Lake Marsh Creation and Hydrologic Restoration Environmental Assessment (PDF) | Environmental Assessment | 5/1/2014 |
Lost Lake Marsh Creation and Hydrologic Restoration Environmental Assessment (PDF) | Environmental Assessment | 5/1/2014 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report (PDF) | DESIGN REPORT | 5/1/2014 |
2014 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF) | Inspection Report | 4/28/2014 |
Grand Liard Marsh and Ridge Restoration Permit Modifications #3 (04/14/2014) (PDF) | PERMITS | 4/14/2014 |
Labranche Central Marsh Creation (PO-133) Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 4/11/2014 |
TV-21 Addendum 1 (PDF) | BID DOCUMENTS | 4/4/2014 |
Shell Beach South Marsh Creation Plan View and Surveys (PDF) | GEOTECHNICAL REPORT | 4/1/2014 |
TE-48 Phase B Project Completion Report (PDF) | Project Completion Report | 3/31/2014 |
GIWW Bank Restoration of Critical Areas in Terrebonne As Built Plans (PDF) | AS-BUILT | 3/26/2014 |
TV-21 Bid Documents (PDF) | BID DOCUMENTS | 3/10/2014 |
2014 Annual Inspection Report for Terrebonne Bay Shore Protection Demonstration (PDF) | Inspection Report | 3/1/2014 |
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP Modification #1 (PDF) | PERMITS | 2/24/2014 |
BA-36 Monitoring Plan (PDF) | OMM Plan | 2/1/2014 |
BA-68 Addendum 4 (PDF) | BID DOCUMENTS | 1/27/2014 |
BA-68 Addendum 3 (PDF) | BID DOCUMENTS | 1/15/2014 |
TV-03 Monitoring Plan (PDF) | OMM Plan | 1/15/2014 |
TV-13a Monitoring Plan (PDF) | OMM Plan | 1/15/2014 |
TE-43 Construction Update 1-25-2014 Photos (PDF) | AS-BUILT | 1/15/2014 |
ME-19 Monitoring Plan (2014 Update) (PDF) | OMM Plan | 1/14/2014 |
BA-68 Addendum 2 (PDF) | BID DOCUMENTS | 1/8/2014 |
BA-40 Addendum 2 (PDF) | BID DOCUMENTS | 1/7/2014 |
BA-40 Addendum 3 (PDF) | BID DOCUMENTS | 1/7/2014 |
TV-12 Monitoring Plan (PDF) | OMM Plan | 1/2/2014 |
ME-11 Monitoring Plan (PDF) | OMM Plan | 1/2/2014 |
ME-14 Monitoring Plan (Update 2014) (PDF) | OMM Plan | 1/2/2014 |
CS-27 Monitoring Plan (PDF) | OMM Plan | 1/2/2014 |
ME-04 Monitoring Plan (PDF) | OMM Plan | 1/2/2014 |
Operation, Maintenance and Rehabilitation Plan for the West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF) | OMM Plan | 1/1/2014 |
Draft Data Report Field and Laboratory Data Collection Phase Cole's Bayou Marsh Restoration Project (TV-63) (PDF) | DATA COLLECTION | 12/20/2013 |
Draft Data Report Field and Laboratory Data Collection Phase Cole's Bayou Marsh Restoration Project (TV-63) (PDF) | DATA COLLECTION | 12/20/2013 |
BA-68 Addendum 1 (PDF) | BID DOCUMENTS | 12/20/2013 |
TV-09 Monitoring Plan (PDF) | OMM Plan | 12/19/2013 |
MR-09 Addendum 4 (PDF) | BID DOCUMENTS | 12/16/2013 |
ME-16 Monitoring Plan (PDF) | OMM Plan | 12/12/2013 |
TV-14 Monitoring Plan (PDF) | OMM Plan | 12/12/2013 |
TV-21 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan (PDF) | OMM Plan | 12/12/2013 |
ME-09 Monitoring Plan (PDF) | OMM Plan | 12/12/2013 |
CS-30 Monitoring Plan (PDF) | OMM Plan | 12/12/2013 |
CS-24 Monitoring Plan (PDF) | OMM Plan | 12/12/2013 |
Perry Ridge Shore Protection (CS-24) Monitoring Plan (PDF) | OMM Plan | 12/12/2013 |
LA-16 Information Packet (PDF) | Project Report | 12/11/2013 |
MR-09 Addendum 3 (PDF) | BID DOCUMENTS | 12/5/2013 |
BA-40 Addendum 1 (PDF) | BID DOCUMENTS | 12/3/2013 |
BA-02 2013 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2013 |
2013 Operations, Maintenance, and Monitoring Report for GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration (BA-02) (PDF) | OM&M Report | 12/1/2013 |
2013 Operations, Maintenance, and Monitoring Report for West Lake Boudreaux Shoreline Protection and Marsh Creation (TE-46) (PDF) | OM&M Report | 12/1/2013 |
BA-40 Bid Plans (PDF) | BID DOCUMENTS | 11/26/2013 |
BA-40 Bid Specifications (PDF) | BID DOCUMENTS | 11/26/2013 |
MR-09 Addendum 2 (PDF) | BID DOCUMENTS | 11/26/2013 |
BA-76 Finding of No Significant Impact (PDF) | Project Report | 11/26/2013 |
BA-76 Environmental Assessment (PDF) | Environmental Assessment | 11/25/2013 |
BA-76 Environmental Assessment Appendix A (PDF) | Environmental Assessment | 11/25/2013 |
Notice to Proceed for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation Project (BA-48) (PDF) | BID DOCUMENTS | 11/25/2013 |
Signed Contract with Weeks Marine (PDF) | BID DOCUMENTS | 11/22/2013 |
BA-68 Appendix B (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Appendix E (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Appendix F (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Appendix G (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Appendix H (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Appendix I (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Bid Plans (PDF) | BID DOCUMENTS | 11/19/2013 |
BA-68 Bid Specifications (PDF) | BID DOCUMENTS | 11/19/2013 |
MR-09 Addendum 1 (PDF) | BID DOCUMENTS | 11/12/2013 |
MR-09 Bid Plans (PDF) | BID DOCUMENTS | 11/5/2013 |
MR-09 Bid Specifications (PDF) | BID DOCUMENTS | 11/5/2013 |
Original Bid - Recommendation of Award to Weeks Marine, Inc. (PDF) | BID DOCUMENTS | 10/29/2013 |
Moffatt & Nichol Re-Bid Recommendation Letter (PDF) | BID DOCUMENTS | 10/28/2013 |
Original Bid - Bid Tabulation Sheet for Mississippi River Long Distance Sediment Pipeline and Bayou Dupont Marsh and Ridge Creation (PDF) | BID DOCUMENTS | 10/22/2013 |
Re-Bid Addendum No. 1 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | BID DOCUMENTS | 10/16/2013 |
Coastal Protection and Restoration Authority Project Completion Report for Brady Canal Hydrologic Restoration (TE-01) 2012 Maintenance Report (PDF) | Project Completion Report | 10/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF) | DESIGN REPORT | 9/25/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF) | DESIGN REPORT | 9/25/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF) | DESIGN REPORT | 9/25/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF) | DESIGN REPORT | 9/25/2013 |
Labranche Central Marsh Creation U S Army Corps of Engineers Permit MVN2013-1950 EBB (PDF) | PERMITS | 9/20/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF) | DESIGN REPORT | 9/18/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF) | DESIGN REPORT | 9/18/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF) | DESIGN REPORT | 9/18/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF) | DESIGN REPORT | 9/18/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF) | DESIGN REPORT | 9/18/2013 |
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP (PDF) | PERMITS | 9/3/2013 |
CS-20 2013 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix F 95 Percent Cost Estimate Back Up (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix G Mech. Sluice Gate Calculations (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As Builts (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As Builts (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix B Percent Specifications (PDF) | DESIGN REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF) | GEOTECHNICAL REPORT | 9/1/2013 |
TE-52 Project Completion Report (PDF) | Project Completion Report | 8/21/2013 |
Survey Plan Methodology Report August 21, 2013 State of Louisiana, Coastal Protection and Restoration Authority (CPRA) Cole's Bayou Marsh Restoration (TV-0063) Vermilion Parish, La (PDF) | SURVEY REPORT | 8/21/2013 |
2013 Annual Inspection Report Hopedale Hydrologic Restoration (PDF) | Inspection Report | 8/12/2013 |
Final Data Report Field and Laboratory Data Collection Phase Oyster Bayou Marsh Restoration Project (PDF) | GEOTECHNICAL REPORT | 8/9/2013 |
TE-45 2013 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2013 |
2013 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) (PDF) | OM&M Report | 8/1/2013 |
2013 Operations, Maintenance, and Monitoring Report for Terrebonne Bay Shore Protection Demonstration (TE-45) (PDF) | OM&M Report | 8/1/2013 |
Orginal Bid - Addendum No. 3 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | BID DOCUMENTS | 7/30/2013 |
Original Bid - Addendum No. 2 Plans and Constract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | BID DOCUMENTS | 7/19/2013 |
PO-104 Meeting Presentation (PDF) | MEETING PRESENTATION | 7/17/2013 |
Geotechnical Data Report Bayou Bonfouca Borrow Area Sediment Sampling (PDF) | GEOTECHNICAL REPORT | 7/16/2013 |
Original Bild - Addendum 01 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | BID DOCUMENTS | 7/12/2013 |
Borrow Area Geotechnical Services Data Report (PDF) | GEOTECHNICAL REPORT | 7/11/2013 |
2013 Annual Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF) | Inspection Report | 7/10/2013 |
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF) | OM&M Report | 7/2/2013 |
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF) | OM&M Report | 7/2/2013 |
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF) | OM&M Report | 7/2/2013 |
BA-39 Monitoring Plan (PDF) | OMM Plan | 7/1/2013 |
TE-48 2013 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2013 |
2013 Annual Inspection Report for Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake (BA-37) (PDF) | Inspection Report | 7/1/2013 |
2012 Annual Inspection Report Mississippi Sediment Delivery System – Bayou Dupont (PDF) | REFERENCE LITERATURE | 7/1/2013 |
2013 Annual Inspection Report Mississippi Sediment Delivery System – Bayou Dupont (PDF) | Inspection Report | 7/1/2013 |
Coastwide Nutria Control Program 2012-2013 Nutria Harvest and Distribution 2012-2013 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2013 (PDF) | OM&M Report | 6/30/2013 |
State of Louisiana Coastal Protection and Restoration Authority Cole's Bayou Marsh Creation and Hydrological Restoration (TV-0063) Magnetometer Survey Marsh Creation and Borrow Areas, Vermilion Parish, Louisiana (PDF) | SURVEY REPORT | 6/26/2013 |
BA-68 Appendix C (PDF) | BID DOCUMENTS | 6/26/2013 |
TV-15 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 6/14/2013 |
CS-22 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 6/13/2013 |
CS-24 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 6/13/2013 |
CS-30 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 6/13/2013 |
CS-11b 2012/2013 Annual Inspection (PDF) | Inspection Report | 6/12/2013 |
ME-09 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 6/12/2013 |
CS-31 2013 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2013 |
2013 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (TV-21) (PDF) | OM&M Report | 6/1/2013 |
Non-Rock Alternatives To Shoreline Protection Demonstration Permit U S Army Corps of Engineers (PDF) | PERMITS | 5/23/2013 |
2013 Annual Inspection Report Fritchie Marsh Restoration (PDF) | Inspection Report | 5/15/2013 |
TV-14 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 5/12/2013 |
2013 Annual Inspection Report Bayou Chevee Shoreline Protection (PDF) | Inspection Report | 5/9/2013 |
2014 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (PDF) | Inspection Report | 5/6/2013 |
2013 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF) | Inspection Report | 5/6/2013 |
Non-Rock Alternatives to Shoreline Protection Demonstration As Builts (PDF) | AS-BUILT | 5/1/2013 |
TV-18 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 4/17/2013 |
TV-03 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 4/17/2013 |
TV-12 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 4/17/2013 |
ME-14 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 4/17/2013 |
Lost Lake Marsh Creation and Hydrologic Restoration Department of Environmental Quality Water Quality Certification WQC 13031-01/AI 186530/CER 20130001 (PDF) | PERMITS | 4/17/2013 |
Joint Public Notice (PDF) | PERMITS | 4/15/2013 |
TV-14 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 3/26/2013 |
CS-27 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 3/20/2013 |
Grand Liard Marsh and Ridge Restoration Permit Modifications #2 (03/19/2013) (PDF) | PERMITS | 3/19/2013 |
CS-21 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 3/7/2013 |
PO-33 Monitoring Plan (PDF) | OMM Plan | 3/1/2013 |
2013 Operations, Maintenance and Monitoring Report for Humble Canal Hydrologic Restoration (ME-11) (PDF) | OM&M Report | 3/1/2013 |
Re-Bid - Bid Package Plans and Specifications for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | BID DOCUMENTS | 3/1/2013 |
Re-Bid - Bid Package Plans and Specifications for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF) | BID DOCUMENTS | 3/1/2013 |
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management Water Quality Certification WQC 121129-02?AI 185272/CER 20130001 (PDF) | PERMITS | 2/28/2013 |
BA-164 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/25/2013 |
BA-164 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/25/2013 |
2012 Annual Inspection Report Hopedale Hydrologic Restoration (PDF) | Inspection Report | 2/1/2013 |
CS-28-1 Meeting Presentation (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Southwest Louisiana Projects Update January 22, 2013 (PDF) | MEETING PRESENTATION | 1/22/2013 |
Non-Rock Alternatives To Shoreline Protection Demonstration Coastal Use Permit, Coastal Zone Consistency (PDF) | PERMITS | 1/17/2013 |
BA-68 Appendix A (PDF) | BID DOCUMENTS | 1/4/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
Joint Permit Application and Amendments (PDF) | PERMITS | 1/1/2013 |
TE-53 Final Report (PDF) | EA or EIS and Ecological Review | 12/19/2012 |
TE-53 - Final Report (PDF) | Project Report | 12/19/2012 |
AT-02 2012 Biennial Inspection Report (PDF) | Inspection Report | 12/15/2012 |
AT-03 2012 Biennial Inspection Report (PDF) | Inspection Report | 12/15/2012 |
ME-16 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 12/13/2012 |
CS-17 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 12/12/2012 |
TV-13A 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 12/11/2012 |
TE-46 2012 Monitoring Plan (PDF) | OMM Plan | 12/1/2012 |
Private Aids to Navigation Application (PDF) | PERMITS | 11/29/2012 |
Private Aids to Navigation Application (PDF) | PERMITS | 11/29/2012 |
Private Aids to Navigation Application (PDF) | PERMITS | 11/29/2012 |
BS-11 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 11/12/2012 |
CS-32 2012/2013 Annual Inspection Report (PDF) | Inspection Report | 10/11/2012 |
BA-27d 2012 Operation, Maintenance, and Rehabilitation Plan (PDF) | Project Report | 10/10/2012 |
Operation, Maintenance, and Rehabilitation Plan for the BA-27d - Barataria Land Bridge Shoreline Protection Phase 4 (Construction Unit No. 6) (PDF) | OMM Plan | 10/10/2012 |
GIWW To Clovelly Hydrologic Restoration 2010 Maintenance Report Project Completion Report (PDF) | Project Completion Report | 10/5/2012 |
2012 Annual Inspection Report for Delta Wide Crevasses (MR-09) (PDF) | Inspection Report | 10/3/2012 |
Lost Lake Marsh Creation and Hydrologic Restoration 95% Design Report (PDF) | DESIGN REPORT | 10/1/2012 |
Notice to Proceed Racoon Island - Phase B (PDF) | BID DOCUMENTS | 9/27/2012 |
TE-46 Operation, Maintenance, and Rehabilitation Plan (PDF) | OMM Plan | 9/25/2012 |
BA-37 2012 Annual Inspection Report (PDF) | Inspection Report | 9/5/2012 |
2012 Annual Inspection Report for Goose Point/ Point Platte Marsh Creation Project (PO-33) (PDF) | Inspection Report | 9/1/2012 |
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/24/2012 |
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/24/2012 |
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/24/2012 |
Acceptance of Offer and Notice of Award (PDF) | BID DOCUMENTS | 8/20/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Phase B As-Builts (PDF) | AS-BUILT | 8/12/2012 |
2012 Annual Inspection Report for Delta Management at Fort St. Philip (BS-11) (PDF) | Inspection Report | 8/7/2012 |
MR-06 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2012 |
West Lake Boudreaux Shoreline Protection and Marsh Creation As-Built (PDF) | AS-BUILT | 7/27/2012 |
BA-39 Investigation of Potential Mississippi River Borrow Areas (PDF) | Contract Studies/Data Collection Report | 7/24/2012 |
TE-48 Bids (PDF) | BID DOCUMENTS | 7/23/2012 |
Penchant Basin Natural Resources Plan, Increment 1 Project Completion Report (PDF) | Project Completion Report | 7/19/2012 |
TE-28 2012 Annual Inspection Report (PDF) | Inspection Report | 7/15/2012 |
TE-44 2012 Annual Inspection Report (PDF) | Inspection Report | 7/10/2012 |
CS-32 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2012 |
TE-25 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2012 |
TE-25 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2012 |
TE-26 2012 Annual Inspection Report (PDF) | Inspection Report | 7/1/2012 |
Great Lak Dredge & Dock Plaquemines Parish Government Construction Permit (PDF) | PERMITS | 7/1/2012 |
Coastwide Nutria Control Program 2011-2012 Nutria Harvest and Distribution 2011-2012 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2012 (PDF) | OM&M Report | 6/30/2012 |
CS-20 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 6/29/2012 |
ME-22 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 6/19/2012 |
TE-22 2012 Annual Inspection Report (PDF) | Inspection Report | 6/15/2012 |
ME-14 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 6/13/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF) | BID DOCUMENTS | 6/8/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF) | BID DOCUMENTS | 6/8/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF) | BID DOCUMENTS | 6/8/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF) | BID DOCUMENTS | 6/8/2012 |
South Lake Decade Freshwater Introduction Project Completion Report (PDF) | Project Completion Report | 6/5/2012 |
Lost Lake Marsh Creation and Hydrologic Restoration 30% Design Report (PDF) | DESIGN REPORT | 6/1/2012 |
BA-68 Environmental Assessment (PDF) | Environmental Assessment | 6/1/2012 |
TV-15 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
CS-27 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
PO-06 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
ME-16 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
BA-37 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
CS-22 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
CS-30 2012 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2012 |
TV-04 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/30/2012 |
TV-17 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/29/2012 |
CS-24 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/24/2012 |
ME-19 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/17/2012 |
TV-09 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/16/2012 |
ME-04 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/16/2012 |
ME-13 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 5/16/2012 |
BA-02 2012 Annual Inspection Report (PDF) | Inspection Report | 5/14/2012 |
Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island (TE-26), Structure 3 Demolition Project Completion Report (PDF) | Project Completion Report | 5/9/2012 |
LA-08 2012 Operations, Maintenance, and Monitoring Plan (PDF) | OMM Plan | 5/7/2012 |
CS-32 Monitoring Plan 2012 (PDF) | OMM Plan | 5/4/2012 |
TE-46 CU#2 Project Completion Report (PDF) | Project Completion Report | 5/4/2012 |
TE-46 Project Completion Report (PDF) | Project Completion Report | 5/3/2012 |
West Lake Boudreaux Shoreline Protection and Marsh Creation Project Completion Report (PDF) | Project Completion Report | 5/3/2012 |
Brady Canal Hydrologic Restoration 2012 Maintenance Project (TE-28) Terrebonne Parish, Louisiana (PDF) | AS-BUILT | 4/16/2012 |
TV-03 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 4/12/2012 |
TV-18 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 4/12/2012 |
TV-12 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 4/12/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Phase A Project Completion Report (PDF) | Project Completion Report | 4/9/2012 |
LA-08 Project Completion Report (PDF) | Project Completion Report | 4/2/2012 |
Bayou Bonfouca Marsh Creation 30% Design Report (PDF) | DESIGN REPORT | 4/1/2012 |
CS-11b 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 3/28/2012 |
ME-09 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 3/28/2012 |
TV-04 2012 Project Completion Report (PDF) | Project Completion Report | 3/20/2012 |
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 6 Project Completion Report (BA-27) (PDF) | Project Completion Report | 3/16/2012 |
TV-14 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 3/14/2012 |
TV-21 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 3/13/2012 |
DOTD Highway 23 Permit Extension (PDF) | PERMITS | 3/13/2012 |
CS-59 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/5/2012 |
CS-59 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/5/2012 |
TV-04 As-Built Drawings - Contruction (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 3/2/2012 |
CS-23 2012 Monitoring Plan (PDF) | OMM Plan | 3/1/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Plans and Specs Phase B (PDF) | BID DOCUMENTS | 2/29/2012 |
Raccoon Island Shoreline Protection and Marsh Creation Plans and Specs Phase B (PDF) | BID DOCUMENTS | 2/29/2012 |
CS-21 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 2/23/2012 |
BA-30 Projects Under Construction Update February 15, 2012 (PDF) | MEETING PRESENTATION | 2/15/2012 |
PO-133 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/10/2012 |
PO-133 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/10/2012 |
BA-125 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/1/2012 |
BA-125 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/1/2012 |
TV-63 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/1/2012 |
TV-63 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/1/2012 |
2011 Annual Inspection Report Hopedale Hydrologic Restoration (PDF) | Inspection Report | 2/1/2012 |
2011 Annual Inspection Report Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF) | Inspection Report | 2/1/2012 |
SOP Manual for CRMS-Wetlands 2012 (PDF) | Project Report | 1/27/2012 |
2011 Annual Inspection Report Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF) | Inspection Report | 1/26/2012 |
BS-11 2011 Annual Inspection Report (PDF) | Inspection Report | 1/12/2012 |
MR-09 2011 Annual Inspection Report (PDF) | Inspection Report | 1/12/2012 |
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2011 Post-Construction Survey;Monitoring Report (PDF) | SURVEY REPORT | 1/1/2012 |
BA-68 Appendix D (PDF) | BID DOCUMENTS | 12/28/2011 |
CS-31 As-Built Drawings - Construction (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 12/28/2011 |
CS-31 Segment Lengths for As-Built Drawings - Construction (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 12/28/2011 |
ME-16 As-Built Drawings - Construction (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 12/22/2011 |
CS-31 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 12/21/2011 |
CS-23 As-Built Drawings (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 12/20/2011 |
BA-33 Myrtle Grove Delta Building Diversion Modeling Effort in Support of the LCA Medium Diversion at Myrtle Grove with Dedicated Dredging Project (PDF) | Contract Studies/Data Collection Report | 12/12/2011 |
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF) | OM&M Report | 12/6/2011 |
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF) | OM&M Report | 12/6/2011 |
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF) | OM&M Report | 12/6/2011 |
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF) | OM&M Report | 12/6/2011 |
CS-23 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 12/1/2011 |
ME-16 2011 Project Completion Report (PDF) | Project Completion Report | 12/1/2011 |
CS-21 2010 Operations, Maintenance, and Monitoring Plan (PDF) | OMM Plan | 12/1/2011 |
TE-40 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2011 |
ME-13 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2011 |
BA-03C 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2011 |
PO-17 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2011 |
TE-28 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2011 |
Lake Hermitage Marsh Creation Bid Package (PDF) | BID DOCUMENTS | 11/15/2011 |
BA-68 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/14/2011 |
BA-20 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 11/1/2011 |
TV-13a 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 11/1/2011 |
2011 Annual Inspection Report Fritchie Marsh Restoration (PDF) | Inspection Report | 11/1/2011 |
Bayou Bonfouca Marsh Creation Survey Report (PDF) | SURVEY REPORT | 10/27/2011 |
Bayou Bonfouca Marsh Creation Survey Report (PDF) | SURVEY REPORT | 10/27/2011 |
Bayou Bonfouca Marsh Creation Survey Report (PDF) | SURVEY REPORT | 10/27/2011 |
CS-17 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 10/20/2011 |
Rockefeller Refuge Gulf Shoreline Stabilization Demonstration Project (ME-18) Post Construction Monitoring (PDF) | OM&M Report | 10/4/2011 |
TV-21 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan (PDF) | OMM Plan | 10/1/2011 |
BA-68 Final Design Report (PDF) | FINAL DESIGN REPORT | 10/1/2011 |
BA-23 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 10/1/2011 |
TV-18 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 10/1/2011 |
South Lake Decade Freshwater Introduction As-Built Plans (PDF) | AS-BUILT | 9/22/2011 |
CS-04a Meeting Presentation (PDF) | MEETING PRESENTATION | 9/21/2011 |
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 4 Project Completion Report (PDF) | Project Completion Report | 9/1/2011 |
BS-03A 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2011 |
2010 Annual Inspection Report Hopedale Hydrologic Restoration (PDF) | Inspection Report | 8/31/2011 |
2010 Annual Inspection Report Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF) | Inspection Report | 8/31/2011 |
TE-44 2011 Annual Inspection Report (PDF) | Inspection Report | 8/30/2011 |
Penchant Basin Natural Resources Plan, Increment 1 As Builts (PDF) | AS-BUILT | 8/29/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/8/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/8/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/8/2011 |
Department of the Army Consent to Cross U.S. Government Easement at Empire to Gulf Waterway Project (PDF) | PERMITS | 8/6/2011 |
Geotech Permits (PDF) | PERMITS | 8/5/2011 |
Geotech Permits (PDF) | PERMITS | 8/5/2011 |
Geotech Permits (PDF) | PERMITS | 8/5/2011 |
River Reintroduction Into Maurepas Swamp (PO-0029). Draft Environmental Information Document. (PDF) | Environmental Assessment | 8/1/2011 |
BA-02 2011 Annual Inspection Report (PDF) | Inspection Report | 8/1/2011 |
TE-41 2011 Closeout Report For Mandalay Bank Protection Demonstration (TE-41) Project (PDF) | Project Completion Report | 8/1/2011 |
TE-26 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2011 |
TV-14 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2011 |
BA-37 2011 Annual Inspection Report (PDF) | Inspection Report | 7/30/2011 |
2011 Annual Inspection Report Naomi Outfall Management (PDF) | Inspection Report | 7/26/2011 |
2011 Annual Inspection Report Barataria Bay Waterway East Bank Protection (PDF) | Inspection Report | 7/26/2011 |
Non-Rock Alternatives to Shoreline Protection Demonstration Geotechnical Engineering Services (PDF) | GEOTECHNICAL REPORT | 7/7/2011 |
BA-39 2011 Annual Inspection Report (PDF) | Inspection Report | 7/1/2011 |
CS-24 2011 Operations, Maintenance, and Monitoriing Report (PDF) | OM&M Report | 7/1/2011 |
TE-22 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2011 |
TV-04 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2011 |
CS-28-1 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2011 |
Geotechnical Design Report Chenier Ronquille Restoration Plaquemines Parish, Louisiana (PDF) | GEOTECHNICAL REPORT | 6/30/2011 |
Coastwide Nutria Control Program 2010-2011 Nutria Harvest and Distribution 2010-2011 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2011 (PDF) | OM&M Report | 6/30/2011 |
2011 Annual Inspection Report Jonathan Davis Wetland Protection (PDF) | Inspection Report | 6/29/2011 |
TV-17 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 6/26/2011 |
2011 Annual Inspection Report Barataria Bay Waterway West Bank Protection (PDF) | REFERENCE LITERATURE | 6/23/2011 |
2011 Annual Inspection Report Bayou Chevee Shoreline Protection (PDF) | Inspection Report | 6/23/2011 |
ME-14 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 6/10/2011 |
ME-04 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2011 |
CS-11b 2011 Operations, Maintenance, and Monitoring (PDF) | OM&M Report | 6/1/2011 |
PO-22 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2011 |
BA-39 Project Completion Report (PDF) | Project Completion Report | 5/24/2011 |
CS-27 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 5/4/2011 |
BS-03a Analysis of Fisheries-Independent Data (PDF) | Contract Studies/Data Collection Report | 5/1/2011 |
ME-19 2011 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF) | SURVEY REPORT | 5/1/2011 |
CS-30 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 4/14/2011 |
TV-09 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 4/12/2011 |
ME-13 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 4/12/2011 |
Water Quality Certification (PDF) | PERMITS | 4/11/2011 |
TV-15 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 4/5/2011 |
Operation, Maintenance, and Rehabilitation Plan for North Lake Mechant Landbridge Restoration Project TE-0044 (PDF) | OMM Plan | 4/5/2011 |
TE-44 2011 Operation, Maintenance, and Rehabilitation Plan (PDF) | Project Report | 4/5/2011 |
ME-11 2011/2012 Annual Inspection Report (PDF) | Inspection Report | 3/24/2011 |
ME-22 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 3/24/2011 |
ME-11 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 3/24/2011 |
ME-09 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 3/24/2011 |
Mississippi River Sediment Delivery System - Bayou Dupont Final Construction Fact Sheet (PDF) | FACT SHEET | 3/21/2011 |
CS-20 Project Completion Report (PDF) | Project Completion Report | 3/16/2011 |
LA-05 Monitoring and Comprehensive Project FINAL REPORT (PDF) | Comprehensive Monitoring Report | 3/9/2011 |
Analysis of Sediment Cores from the West Bay Diversion Receiving Area (PDF) | DATA COLLECTION | 3/3/2011 |
LDWF Permit Application for Dredging (PDF) | PERMITS | 3/1/2011 |
LDWF Permit Application for Dredging (PDF) | PERMITS | 3/1/2011 |
TV-21 Completion Report (PDF) | Project Completion Report | 3/1/2011 |
TV-21 As Built Drawings - Construction (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 3/1/2011 |
GIWW To Clovelly Hydrologic Restoration 2010 Maintenance Project As Built (PDF) | AS-BUILT | 3/1/2011 |
TV-12 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 2/22/2011 |
TV-03 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 2/22/2011 |
CS-21 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 2/9/2011 |
CS-54 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/8/2011 |
CS-54 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/8/2011 |
TE-83 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/8/2011 |
TE-83 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/8/2011 |
PO-104 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/8/2011 |
PO-104 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/8/2011 |
CS-20 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 2/7/2011 |
BA-40 Permit Plat (PDF) | PERMITS | 2/3/2011 |
Riverine Sand Mining/Scofield Island Restoration Project (BA-40) Project Narrative (PDF) | PERMITS | 2/1/2011 |
TE-45 2011 Annual Inspection Report (PDF) | Inspection Report | 2/1/2011 |
BA-48 Environmental Assessment (PDF) | Environmental Assessment | 2/1/2011 |
East Grand Terre Survey Report January 21, 2011 (PDF) | SURVEY REPORT | 1/21/2011 |
CS-23 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 1/20/2011 |
BA-30 Project Completion Report (PDF) | Project Completion Report | 1/20/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
Scofield Construction Bid Documents (PDF) | BID DOCUMENTS | 1/5/2011 |
CS-53 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/1/2011 |
CS-53 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/1/2011 |
LA-39 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/1/2011 |
LA-39 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/1/2011 |
Bio-Engineered Oyster Reef Demonstration Bid Package (PDF) | BID DOCUMENTS | 1/1/2011 |
TE-28 2010 Annual Inspection Report (PDF) | Inspection Report | 12/28/2010 |
Raccoon Island Shoreline Protection Marsh Creation Coastal Zone Consistency Permit C20070631 (PDF) | PERMITS | 12/24/2010 |
2010 Annual Inspection Report Jonathan Davis Wetland Protection (PDF) | Inspection Report | 12/15/2010 |
2010 Annual Inspection Report for Fritchie Marsh Restoration (PDF) | Inspection Report | 12/15/2010 |
2010 Annual Inspection Report Barataria Bay Waterway East Bank Protection (PDF) | Inspection Report | 12/13/2010 |
2010 Annual Inspection Report Barataria Bay Waterway West Bank Protection (PDF) | Inspection Report | 12/13/2010 |
2010 Annual Inspection Report Naomi Outfall Management (PDF) | Inspection Report | 12/13/2010 |
CS-17 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 12/9/2010 |
BA-02 2010 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2010 |
CS-31 2010 Operations, Maintenance, and Monitoring Plan (PDF) | OM&M Report | 12/1/2010 |
CS-20 2010 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2010 |
ME-11 2010 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/1/2010 |
PO-24 2010 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 11/29/2010 |
CS-31 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 10/27/2010 |
TE-22 2010 Annual Inspection Report (PDF) | Inspection Report | 10/27/2010 |
BA-48 Ecological Review (PDF) | EA or EIS and Ecological Review | 10/27/2010 |
PO-29 Assessment of an Alternative Siphon System Intake (PDF) | Contract Studies/Data Collection Report | 10/20/2010 |
PO-29 Assessment of an Alternative Siphon System Intake - Figures (PDF) | Contract Studies/Data Collection Report | 10/20/2010 |
MR-09 2010 Annual Inspection Report (PDF) | Inspection Report | 10/7/2010 |
CS-32 2010/2011 Annual Inspection Report (PDF) | Inspection Report | 10/6/2010 |
Ba-48 95% Design Report (PDF) | 95% DESIGN REPORT | 10/1/2010 |
TE-52 Water Quality Certification (PDF) | PERMITS | 9/29/2010 |
2010 Annual Inspection Report for Delta Management at Fort St. Phillip (BS-11) (PDF) | Inspection Report | 9/8/2010 |
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Project Completion Report (PDF) | Project Completion Report | 9/1/2010 |
BA-37 2010 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2010 |
Bio-Engineered Oyster Reef Demonstration Coastal Use Permit/Consistency Determination (PDF) | PERMITS | 8/25/2010 |
Survey Cost Estimate BA-0002 GIWW To Clovelly Maintenance Project (PDF) | SURVEY REPORT | 8/6/2010 |
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2010 Post-Construction Survey Monitoring Report (PDF) | SURVEY REPORT | 8/1/2010 |
TE-44 Lake Mechant Project Completion Report (PDF) | Project Completion Report | 8/1/2010 |
TE-52 Environmental Assessment (PDF) | Environmental Assessment | 8/1/2010 |
CRMS Fact Sheet (PDF) | General Project Fact Sheet | 8/1/2010 |
GIWW Bank Restoration of Critical Areas in Terrebonne USACE Permit Extension MVN-2004-04534-WY (PDF) | PERMITS | 7/22/2010 |
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 5 As Build Drawings (PDF) | AS-BUILT | 7/20/2010 |
TE-48 2010 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 7/1/2010 |
LA-03b Nutria Harvest and Distribution 2009-2010 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2010 (PDF) | OM&M Report | 6/30/2010 |
PO-75 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/16/2010 |
PO-75 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/16/2010 |
TE-72 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/16/2010 |
TE-72 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/16/2010 |
BA-76 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/14/2010 |
BA-76 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/14/2010 |
ME-31 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/9/2010 |
ME-31 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/9/2010 |
Bio-Engineered Oyster Reef Demonstration Category II Programmatic General Permit (PDF) | PERMITS | 6/7/2010 |
Operation, Maintenance, and Rehabilitation Plan for the Terrebonne Bay Shore Protection and Demonstration Project State Project No. TE-45 (PDF) | OMM Plan | 6/1/2010 |
TE-45 2010 Operation, Maintenance, and Rehabilitation Plan (PDF) | Project Report | 6/1/2010 |
TE-26 2010 Annual Inspection Report (PDF) | Inspection Report | 6/1/2010 |
TE-45 2010 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 6/1/2010 |
BA-35 Project Completion Report (PDF) | Project Completion Report | 6/1/2010 |
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management 95% Design Report (PDF) | DESIGN REPORT | 5/7/2010 |
Lake Borgne Shoreline Protection Project Completion Report (PDF) | Project Completion Report | 4/14/2010 |
CS-17 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 4/6/2010 |
AT-02 2010 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 3/20/2010 |
AT-03 2010 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 3/20/2010 |
CS-18 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 3/18/2010 |
BA-40 Ecological Review (PDF) | EA or EIS and Ecological Review | 3/16/2010 |
MR-03 West Bay Sediment Diversion EIS- Record of Decision (PDF) | Project Report | 3/11/2010 |
CS-32 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 3/11/2010 |
BS-15 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/10/2010 |
BS-15 General Project Fact Sheet High Qulaity (PDF) | General Project Fact Sheet | 3/10/2010 |
BS-18 General Project Fact Sheet (PDF) | General Project Fact Sheet | 3/10/2010 |
BS-18 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 3/10/2010 |
TE-50 Project Completion Report (PDF) | Project Completion Report | 3/1/2010 |
Shoreline Position and Transect Elevation Preliminary Survey Report, TE-0040, March 2010 (PDF) | CONTRACTED STUDY | 3/1/2010 |
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Increment 2 (PDF) | BID DOCUMENTS | 2/23/2010 |
CS-04a Project Completion Report - Levee Erosion Work (PDF) | Project Completion Report | 2/15/2010 |
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans Increment 2 (PDF) | BID DOCUMENTS | 2/10/2010 |
CS-04a Project Completion Report - As Built 2010 (PDF) | Project Completion Report | 2/1/2010 |
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management Subsoil Investigation (PDF) | GEOTECHNICAL REPORT | 1/27/2010 |
LA-09 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/22/2010 |
LA-09 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/22/2010 |
BS-16 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/19/2010 |
BS-16 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/19/2010 |
CS-49 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/19/2010 |
CS-49 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/19/2010 |
TV-09 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 1/14/2010 |
TV-13a 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 1/14/2010 |
BA-48 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/7/2010 |
BA-48 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/7/2010 |
BA-68 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/7/2010 |
BA-68 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/7/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix A - Mississippi River Borrow Area Geophysical Survey (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix B: Mississippi River Borrow Area Geotechnical Survey (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix C: Mississippi River Borrow Area Sediment Analyses (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix D: Mississippi River One-Dimensional Modeling Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix E: Mississippi River Borrow Area Design Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix F: Conveyance Corridor Survey Report - Upland Segment (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 1-10 (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 11-20 (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 21-32 (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix H: Environmental Mapping of the Conveyance Corridor and Scofield Island (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix I: Conveyance Corridor Design Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix J: Scofield Offshore Borrow Areas Design Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix K: SI Back-Barrier Geotechnical Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix L: Scofield Island Native Beach Sediment Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix M: Scofield Island Restoration Area Design Analysis (PDF) | 95% DESIGN REPORT | 1/1/2010 |
TV-14 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 12/3/2009 |
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 1 of 6 Overview (PowerPoint Presentation) | Project Report | 12/1/2009 |
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 2 of 6 Uncertainty (PowerPoint Presentation) | Project Report | 12/1/2009 |
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 3 of 6 Data Collection (PowerPoint Presentation) | Project Report | 12/1/2009 |
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 4 of 6 Geomorphic Assessment (PowerPoint Presentation) | Project Report | 12/1/2009 |
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 5 of 6 1-Dimensional Modeling (PowerPoint Presentation) | Project Report | 12/1/2009 |
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 6 of 6 Multi-Dimensional Modeling (PowerPoint Presentation) | Project Report | 12/1/2009 |
MR-03 ERDC Work Plan Report - DRAFT West Bay Sediment Diversion Effects (PDF) | Project Report | 11/25/2009 |
MR-03 Appendices A through M (PDF) | Project Report | 11/25/2009 |
MR-03 Aerial and Bathymetric Spatial Change Analysis of the West Bay Sediment Diversion Receiving Area, Louisiana for U.S. Army Engineer District, New Orleans (MVN) (PDF) | Project Report | 11/24/2009 |
North Lake Mechant Landbridge Restoration Water Quality Certification WQC 080424-01/AI 117287/CER 20090002 (PDF) | PERMITS | 11/18/2009 |
LA-16 General Project Fact Sheet (PDF) | General Project Fact Sheet | 11/16/2009 |
LA-16 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 11/16/2009 |
MR-09 2009 Annual Inspection Report (PDF) | Inspection Report | 11/16/2009 |
BA-47 General Project Fact Sheet (PDF) | General Project Fact Sheet | 11/12/2009 |
BA-47 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 11/12/2009 |
CS-21 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 11/12/2009 |
ME-11 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 11/6/2009 |
ME-20 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/3/2009 |
BA-37 2009 Operation, Maintenance, and Rehabilitation Plan (PDF) | Project Report | 11/1/2009 |
Operation, Maintenance, and Rehabilitation Plan for the Little Lake Shoreline Protection / Dedicated Dredging Project BA-37 (PDF) | OMM Plan | 11/1/2009 |
West Bay Sediment Diversion Effects. (PDF) | CONTRACTED STUDY | 11/1/2009 |
MR-03 20 Oct 09 Peer Review Meeting Presentations (PDF) | Project Report | 10/27/2009 |
TE-66 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/20/2009 |
TE-66 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/20/2009 |
CS-31 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 10/20/2009 |
CS-23 2009/2010 Annual Inspection Report (PDF) | Inspection Report | 10/20/2009 |
TE-52 Monitoring Plan (PDF) | OMM Plan | 10/15/2009 |
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 4 As Built (BA-27) (PDF) | AS-BUILT | 10/6/2009 |
North Lake Mechant Landbridge Restoration Coast Zone Consistency Use Permit C20040642 (PDF) | PERMITS | 10/6/2009 |
South Lake Decade Freshwater Introduction Bid Documents (PDF) | BID DOCUMENTS | 10/1/2009 |
South Lake Decade Freshwater Introduction Bid Documents (PDF) | BID DOCUMENTS | 10/1/2009 |
South Lake Decade Freshwater Introduction Bid Documents (PDF) | BID DOCUMENTS | 10/1/2009 |
South Lake Decade Freshwater Introduction Bid Documents (PDF) | BID DOCUMENTS | 10/1/2009 |
South Lake Decade Freshwater Introduction Bid Documents (PDF) | BID DOCUMENTS | 10/1/2009 |
South Lake Decade Freshwater Introduction Bid Documents (PDF) | BID DOCUMENTS | 10/1/2009 |
South Grand Chenier Marsh Creation Final Design Report (PDF) | DESIGN REPORT | 10/1/2009 |
CS-23 Project Completion Report (As Built) (PDF) | Project Completion Report | 9/25/2009 |
CS-23 2009 Project Completion Report (PDF) | Project Completion Report | 9/23/2009 |
BA-37 Summer 2009 Post Construction Monitoring Report (PDF) | OM&M Report | 9/20/2009 |
TV-13a 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2009 |
BS-03a 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 9/1/2009 |
BS-03a 2009 Annual Inspection Report (PDF) | Inspection Report | 8/5/2009 |
MR-09 2009 Operations, Maintenance & Monitoring Report (PDF) | Monitoring Report | 8/1/2009 |
PO-34 General Project Fact Sheet (PDF) | General Project Fact Sheet | 8/1/2009 |
PO-34 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 8/1/2009 |
2009 Operations, Maintenance and Monitoring Report for Delta Wide Crevasses (MR-09) (PDF) | OM&M Report | 8/1/2009 |
Goose Point/Point Platte Marsh Creation AS Built Survey (PDF) | AS-BUILT | 8/1/2009 |
PO-33 Project Completion Report (As Constructed) (PDF) | Project Completion Report | 8/1/2009 |
Bayou Penchant Basin (TE-34) Construction Specifications (PDF) | DESIGN REPORT | 8/1/2009 |
BA-38 2009 Operations, Maintenance & Monitoring Report (PDF) | Monitoring Report | 7/20/2009 |
BA-03c 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
PO-06 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
PO-24 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
BA-26 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
BA-38 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
BA-23 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
PO-16 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
PO-18 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
BA-20 2008 Annual Inspection Report (PDF) | Inspection Report | 7/13/2009 |
MR-03 USACE West Bay Fact Sheet 07 July 2009 (PDF) | Project Report | 7/7/2009 |
MR-03 7 Jul 09 Peer Review Meeting Presentation (PDF) | Project Report | 7/7/2009 |
PO-22 2008 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
PO-06 2009 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
PO-24 2009 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
BA-26 2009 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
BA-23 2009 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
BA-38 2009 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
BA-37 2009 Annual Inspection Report (PDF) | Inspection Report | 7/1/2009 |
South Grand Chenier Marsh Creation 30% Design Report (PDF) | DESIGN REPORT | 7/1/2009 |
LA-03b Nutria Harvest and Distribution 2008-2009 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2009 (PDF) | OM&M Report | 6/30/2009 |
TE-28 2009 Annual Inspection Report (PDF) | Inspection Report | 6/30/2009 |
BA-02 2009 Annual Inspection Report (PDF) | Inspection Report | 6/30/2009 |
CS-28-2 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/23/2009 |
CS-28-2 General Project Fact Sheet High quality (PDF) | General Project Fact Sheet | 6/23/2009 |
ME-24 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/18/2009 |
ME-24 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/18/2009 |
TV-17 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 6/17/2009 |
PO-33 Project Completion Report (PDF) | Project Completion Report | 6/10/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Pelican Island Issued Permits (PDF) | PERMITS | 6/5/2009 |
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Bid Documents (PDF) | BID DOCUMENTS | 6/3/2009 |
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Bid Documents (PDF) | BID DOCUMENTS | 6/3/2009 |
TE-26 2009 Annual Inspection Report (PDF) | Inspection Report | 6/1/2009 |
TE-22 2009 Annual Inspection Report (PDF) | Inspection Report | 6/1/2009 |
CS-23 As-Built Bid Package (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 6/1/2009 |
CS-24 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2009 |
TV-09 2009 Operations, Maintenance, and Mointoring Report (PDF) | OM&M Report | 6/1/2009 |
ME-14 2009 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2009 |
LA-08 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/27/2009 |
LA-08 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/27/2009 |
TV-14 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 5/5/2009 |
TE-40 Habitat Mapping and Change Analysis: 2005 to 2006 Final Report (PDF) | Contract Studies/Data Collection Report | 4/8/2009 |
ME-16 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 4/1/2009 |
CS-30 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 4/1/2009 |
CS-27 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 4/1/2009 |
CS-04a As-Built Bid Package (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 4/1/2009 |
TE-43 Breach Closures along the GIWW As-Built Drawings (PDF) | AS-BUILT | 3/31/2009 |
BA-20 2009 Annual Inspection Report (PDF) | Inspection Report | 3/23/2009 |
BA-03c 2009 Annual Inspection Report (PDF) | Inspection Report | 3/20/2009 |
Lake Borgne Shoreline Protection As Built (PDF) | AS-BUILT | 3/1/2009 |
Bayou Chevee Shoreline Protection Project As-Built Drawings (PO-0022) (PDF) | AS-BUILT | 3/1/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations CHRONOLOGY OF THE HISTORY OF THE DEVELOPMENT - Broussard (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations CWPPRA Tech Com Meet Feb 09--Henville (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations Kj0_West Bay (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WESTBAY 27 Feb 09 Price (2) (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WESTBAY 27 Feb 09 Price (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WestBay_Padgett_27FEB09 (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations West-Bay-CWPPRA-meeting_multi-D-modeling-022709 - Brown (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WestBayrGeomorphicAssessment1DModeling (PDF) | Project Report | 2/27/2009 |
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations (All files zipped) (Zipped file) | Project Report | 2/27/2009 |
CS-20 As-Built Drawings (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 2/9/2009 |
CS-20 As-Built Bid Package (PDF) | AS-BUILT DRAWINGS - CONSTRUCTION | 2/1/2009 |
AT-02 Louisiana BICM Volume 2, Parts 1-4 (PDF) | Contract Studies/Data Collection Report | 2/1/2009 |
AT-02 Louisiana BICM Volume 2, Appendices A-C (PDF) | Contract Studies/Data Collection Report | 2/1/2009 |
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 1 (PDF) | Contract Studies/Data Collection Report | 2/1/2009 |
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 3 (PDF) | Contract Studies/Data Collection Report | 2/1/2009 |
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 4 (PDF) | Contract Studies/Data Collection Report | 2/1/2009 |
BA-28 Louisiana BICM Volume 3: Bathymetry and Historical Seafloor Change 1869-2007 Part 3 (PDF) | Contract Studies/Data Collection Report | 2/1/2009 |
BA-39 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 1/2/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
AT-02 Louisiana BICM Volume 1, Part 2: 2006/2007 Aerial Survey Photography (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
AT-02 Louisiana BICM Volume 1, Part 4: Historic Photo-Pairs/Time Series (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
AT-02 Louisiana BICM Volume 1, Part 5: 2006/2007 Aerial Video Survey (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
BA-28 Louisiana BICM Volume 3: Bathymetry and Historical Seafloor Change 1869-2007 Part 1 (PDF) | Contract Studies/Data Collection Report | 1/1/2009 |
TE-24 2008 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 12/1/2008 |
TV-21 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 11/18/2008 |
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Addendum 04 (PDF) | BID DOCUMENTS | 11/6/2008 |
TV-21 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/3/2008 |
BA-42 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/3/2008 |
PO-17 2008 Operations, Maintenance and Monitoring Report (PDF) | OM&M Report | 11/1/2008 |
TV-13a 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/30/2008 |
ME-22 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/29/2008 |
CS-31 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/20/2008 |
CS-20 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/20/2008 |
BA-37 Final Spring 2008 Post Construction Monitoring Report (PDF) | OM&M Report | 10/20/2008 |
BA-33 Alternative Modeling (PDF) | Contract Studies/Data Collection Report | 10/16/2008 |
BA-33 Alternative Modeling - Appendices A-H (PDF) | Contract Studies/Data Collection Report | 10/16/2008 |
BA-33 Alternative Modeling - Appendices I-R (PDF) | Contract Studies/Data Collection Report | 10/16/2008 |
BA-33 Alternative Modeling - Appendices S-W (PDF) | Contract Studies/Data Collection Report | 10/16/2008 |
CS-21 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/14/2008 |
TV-18 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/9/2008 |
ME-13 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/9/2008 |
ME-04 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/9/2008 |
TV-12 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/9/2008 |
TV-03 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/9/2008 |
CS-24 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/2/2008 |
CS-30 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/2/2008 |
CS-27 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/2/2008 |
CS-22 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/2/2008 |
ME-11 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/1/2008 |
CS-11b 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 10/1/2008 |
BA-42 Final Design Report (PDF) | FINAL DESIGN REPORT | 10/1/2008 |
TV-15 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 9/30/2008 |
TV-04 2008/2009 Annual Inspection Report (PDF) | Inspection Report | 9/30/2008 |
SOP Manual for CRMS-Wetlands 2008 (PDF) | Project Report | 9/18/2008 |
TE-50 Whiskey Island Back Barrier Marsh Creation As-Built Drawings (PDF) | AS-BUILT | 9/1/2008 |
West Belle Pass Headland Restoration (TE-52): Phase I Investigations (PDF) | GEOTECHNICAL REPORT | 9/1/2008 |
Whiskey Island Back Barrier Marsh Creation Bid Package (PDF) | BID DOCUMENTS | 8/29/2008 |
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans (PDF) | BID DOCUMENTS | 8/11/2008 |
TE-22 2008 Annual Inspection Report (PDF) | Inspection Report | 8/1/2008 |
TE-44 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2008 |
TE-20 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2008 |
BA-03c 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2008 |
AT-02 Louisiana BICM Volume 1, Part 3: 2005-2007 Photo-Pairs (PDF) | Contract Studies/Data Collection Report | 8/1/2008 |
AT-03 2008 Biennial Inspection Report (PDF) | Inspection Report | 7/31/2008 |
CS-04a Project Completion Report - Repair of Breaches (PDF) | Project Completion Report | 7/24/2008 |
CS-04A Project Completion Report - As Built Drawings 2006 (PDF) | Project Completion Report | 7/24/2008 |
AT-02 2008 Biennial Inspection Report (PDF) | Inspection Report | 7/21/2008 |
TE-45 Transect Survey Report (PDF) | Project Completion Report | 7/16/2008 |
TE-45 Terrebonne Bay Shore Protection Demonstration Project TE-45 Survey Report (PDF) | Project Completion Report | 7/16/2008 |
PO-22 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2008 |
CS-23 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2008 |
TV-18 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/1/2008 |
LA-03b Nutria Harvest Distribution 2007-2008 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2008 (PDF) | OM&M Report | 6/30/2008 |
Raccoon Island Shoreline Protection Marsh Creation Permits MVN-2008-0143 CQ (PDF) | PERMITS | 6/18/2008 |
TV-12 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 6/6/2008 |
Whiskey Island Back Barrier Marsh Creation U S Army Corps of Engineers Permit MVN 2008-226-CY (PDF) | PERMITS | 6/2/2008 |
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 1 (PDF) | Contract Studies/Data Collection Report | 6/1/2008 |
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 2 (PDF) | Contract Studies/Data Collection Report | 6/1/2008 |
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 3 (PDF) | Contract Studies/Data Collection Report | 6/1/2008 |
MR-06 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2008 |
Shoreline Position and Transect Elevation Survey Report, TE-0040, June 2008 (PDF) | CONTRACTED STUDY | 6/1/2008 |
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) Final Report (PDF) | SURVEY REPORT | 5/30/2008 |
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) Final Report (PDF) | SURVEY REPORT | 5/30/2008 |
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) (PDF) | SURVEY REPORT | 5/30/2008 |
ME-22 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 5/28/2008 |
CS-04a Project Completion Report - Levee Breaches (PDF) | Project Completion Report | 5/21/2008 |
TE-26 2008 Annual Inspection Report (PDF) | Inspection Report | 5/16/2008 |
CS-11b 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 5/1/2008 |
ME-11 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 5/1/2008 |
TE-28 2008 Annual Inspection Report (PDF) | Inspection Report | 5/1/2008 |
ME-09 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 5/1/2008 |
TE-27 2008 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 5/1/2008 |
2007 Annual Inspection Report Jonathan Davis Wetland Protection (PDF) | Inspection Report | 4/29/2008 |
2007 Annual Inspection Report Barataria Bay Waterway East Bank Protection (PDF) | Inspection Report | 4/28/2008 |
2007 Annual Inspection Report Barataria Bay Waterway West Bank Protection (PDF) | Inspection Report | 4/28/2008 |
TV-09 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/24/2008 |
ME-13 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/24/2008 |
ME-04 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/24/2008 |
TV-03 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/24/2008 |
TE-45 Project Completion Report (PDF) | Project Completion Report | 4/16/2008 |
BS-11 2008 Annual Inspection Report (PDF) | Inspection Report | 4/15/2008 |
TV-17 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/15/2008 |
BA-02 2008 Annual Inspection Report (PDF) | Inspection Report | 4/9/2008 |
ME-19 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/4/2008 |
TV-15 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 4/1/2008 |
ME-17 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/1/2008 |
ME-17 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/1/2008 |
MR-09 2008 Annual Inspection Report (PDF) | Inspection Report | 3/12/2008 |
CS-20 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 3/11/2008 |
ME-14 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 3/6/2008 |
BS-03a 2008 Annual Inspection Report (PDF) | Inspection Report | 3/4/2008 |
TV-14 2007-2008 Annual Inspection Report (PDF) | Inspection Report | 2/28/2008 |
Whiskey Island Back Barrier Marsh Creation Coastal Zone Consistency C20070623 (PDF) | PERMITS | 2/18/2008 |
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF) | Monitoring Report | 2/13/2008 |
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF) | Monitoring Report | 2/13/2008 |
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF) | Monitoring Report | 2/13/2008 |
CS-21 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 2/13/2008 |
CS-21 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 2/12/2008 |
TE-51 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/4/2008 |
TE-52 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/4/2008 |
TE-51 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/4/2008 |
TE-52 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/4/2008 |
TE-53 General Project Fact Sheet (PDF) | General Project Fact Sheet | 1/1/2008 |
TE-53 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 1/1/2008 |
TV-04 2008 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 1/1/2008 |
North Lake Mechant Landbridge Restoration Bid Package (PDF) | BID DOCUMENTS | 1/1/2008 |
North Lake Mechant Landbridge Restoration Bid Package (PDF) | BID DOCUMENTS | 1/1/2008 |
North Lake Mechant Landbridge Restoration Bid Package (PDF) | BID DOCUMENTS | 1/1/2008 |
North Lake Mechant Landbridge Restoration Bid Package (PDF) | BID DOCUMENTS | 1/1/2008 |
TE-44 North Lake Mechant Landbridge Restoration As-Builts (PDF) | AS-BUILT | 1/1/2008 |
TE-48 Phase B Ecological Review (PDF) | EA or EIS and Ecological Review | 12/19/2007 |
PO-06 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 12/13/2007 |
CS-17 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 12/12/2007 |
BA-41 Ecological Review (PDF) | EA or EIS and Ecological Review | 12/12/2007 |
TV-04 2001 Project Completion Report - As Built Drawings (PDF) | Project Completion Report | 12/11/2007 |
CS-18 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 12/6/2007 |
TV-04 2007 Project Completion Report (PDF) | Project Completion Report | 12/1/2007 |
BA-33 Modeling Relationships between the Abundance of Fishery Species, Coastal Wetland Landscapes, and Salinity in the Barataria Basin, Louisiana (PDF) | General Programmatic Document | 12/1/2007 |
CS-22 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 11/27/2007 |
BA-39 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/7/2007 |
TE-50 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/7/2007 |
BA-23 2007 Project Completion Report (PDF) | Project Completion Report | 11/6/2007 |
TE-50 Monitoring Plan (PDF) | OMM Plan | 11/5/2007 |
ME-09 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 11/2/2007 |
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF) | Project Completion Report | 11/1/2007 |
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF) | Project Completion Report | 11/1/2007 |
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF) | Project Completion Report | 11/1/2007 |
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF) | Project Completion Report | 11/1/2007 |
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report (PDF) | DESIGN REPORT | 11/1/2007 |
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report Appendices (PDF) | DESIGN REPORT | 11/1/2007 |
CS-31 2007/2008 Annual Inspection Report (PDF) | Inspection Report | 10/30/2007 |
CS-28-3 Project Completion Report (PDF) | Project Completion Report | 10/19/2007 |
CS-28-3 2007 Project Completion Report (PDF) | Project Completion Report | 10/19/2007 |
BA-39 Review (Contracted Study Report) (PDF) | Contract Studies/Data Collection Report | 10/17/2007 |
TE-37 Project Completion Report 1 of 7 (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report 2 of 7 Apdx A (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report 3 of 7 Apdx B (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report 4 of 7 Apdx C (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report 5 of 7 Apdx D (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report 6 of 7 Apdx E (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report 7 of 7 Apdx F (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report Appendix A (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report Appendix B (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report Appendix C (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report Appendix D (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report Appendix E (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report Appendix F (PDF) | Project Completion Report | 10/5/2007 |
TE-37 Project Completion Report (PDF) | Project Completion Report | 10/5/2007 |
Lake Hermitage Marsh Creation Geotechnical Investigation Report (PDF) | GEOTECHNICAL REPORT | 10/1/2007 |
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix A (PDF) | GEOTECHNICAL REPORT | 10/1/2007 |
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix B (PDF) | GEOTECHNICAL REPORT | 10/1/2007 |
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix C (PDF) | GEOTECHNICAL REPORT | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF) | BID DOCUMENTS | 10/1/2007 |
TE-23 Project Completion Report As-Built Drawings (PDF) | Project Completion Report | 9/27/2007 |
BA-37 Post Construction Survey Report (PDF) | OM&M Report | 8/20/2007 |
PO-24 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/14/2007 |
BA-02 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/6/2007 |
ME-19 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
CS-31 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
ME-11 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
CS-21 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
TE-41 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
TV-14 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
TV-03 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
CS-20 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
ME-04 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
TE-28 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
CS-17 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
CS-28 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 8/1/2007 |
BA-37 Project Completion Report (PDF) | Project Completion Report | 8/1/2007 |
Raccoon Island Shoreline Protection and Marsh Creation 30% Design Report (PDF) | DESIGN REPORT | 8/1/2007 |
BA-20 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/30/2007 |
TE-37 Vegetative Plantings (As-built) (PDF) | Project Completion Report | 7/24/2007 |
PO-27 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 7/19/2007 |
PO-18 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/19/2007 |
BA-03c 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/18/2007 |
BS-03a 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/18/2007 |
PO-22 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/18/2007 |
BA-26 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/18/2007 |
PO-16 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/18/2007 |
TE-22 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 7/1/2007 |
Geotechnical Investigation Data Report Mississippi River Sediment Delivery System - Bayou Dupont (PDF) | GEOTECHNICAL REPORT | 7/1/2007 |
Mississippi River Sediment Delivery System - Bayou Soil Borings (PDF) | GEOTECHNICAL REPORT | 7/1/2007 |
LA-03b Nutria Harvest Distribution 2006-2007 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2007 (PDF) | OM&M Report | 6/30/2007 |
TE-40 Monitoring Plan (PDF) | OMM Plan | 6/25/2007 |
TE-0040 Monitoring Plan, Timbalier Island Marsh / Dune Restoration, June 25, 2007 (PDF) | OMM Plan | 6/25/2007 |
TV-15 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/22/2007 |
TV-04 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/22/2007 |
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/21/2007 |
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/21/2007 |
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/21/2007 |
CS-24 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/20/2007 |
CS-30 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/20/2007 |
TV-17 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/19/2007 |
ME-14 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 6/19/2007 |
ME-16 2007 Project Completion Report (PDF) | Project Completion Report | 6/18/2007 |
TE-26 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/15/2007 |
Chaland Headland Restoration (BA-38-2) CWPPRA Project Completion Report Short Version (PDF) | Project Completion Report | 6/4/2007 |
BA-23 2007 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2007 |
BS-13 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2007 |
MR-15 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2007 |
BS-13 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2007 |
MR-15 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2007 |
TV-21 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2007 |
TV-21 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2007 |
BS-03a 2004 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 5/30/2007 |
MR-09 2004 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 5/30/2007 |
BA-03c and BA-26 2004 Operations, Maintenance and Monitoring Report (PDF) | Monitoring Report | 5/1/2007 |
BA-03c and BA-26 2004 Operations, Maintenance and Monitoring Report (PDF) | Monitoring Report | 5/1/2007 |
TV-13a 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 5/1/2007 |
TV-09 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 5/1/2007 |
ME-13 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 5/1/2007 |
TV-14 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2007 |
BA-37 Project Completion Report (As-Built Plans) (PDF) | Project Completion Report | 5/1/2007 |
BA-38 Project Completion Report As-Built Drawings (PDF) | Project Completion Report | 4/13/2007 |
BA-03c 2006 Annual Inspection Report (PDF) | Inspection Report | 4/5/2007 |
CS-28-3 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/1/2007 |
ME-16 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/1/2007 |
CS-28-3 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/1/2007 |
ME-16 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/1/2007 |
TE-37 Project Completion Report As-Built Drawings (PDF) | Project Completion Report | 3/28/2007 |
CS-20 Comprehensive Monitoring Report 2 (PDF) | Comprehensive Monitoring Report | 3/26/2007 |
CS-18 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 3/22/2007 |
CS-23 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 3/22/2007 |
TE-39 Environmental Assessment (PDF) | Environmental Assessment | 3/19/2007 |
TV-18 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 3/6/2007 |
TV-12 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 3/6/2007 |
PO-29 Hydraulic Feasibility Study 1 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
PO-29 Hydraulic Feasibility Study 2 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
PO-29 Hydraulic Feasibility Study 3 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
PO-29 Hydraulic Feasibility Study 4 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
PO-29 Hydraulic Feasibility Study 5 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
PO-29 Hydraulic Feasibility Study 6 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
PO-29 Hydraulic Feasibility Study 7 of 7 (PDF) | Contract Studies/Data Collection Report | 3/1/2007 |
BA-35 Environmental Assessment (PDF) | Environmental Assessment | 3/1/2007 |
BA-35 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 3/1/2007 |
LA-05 Monitoring Report 1 of 2 (PDF) | OM&M Report | 2/5/2007 |
LA-05 Monitoring Report 2 of 2 (PDF) | OM&M Report | 2/5/2007 |
Lake Borgne Shoreline Protection Bid Documents (PDF) | BID DOCUMENTS | 2/1/2007 |
Lake Borgne Shoreline Protection Bid Documents (PDF) | BID DOCUMENTS | 2/1/2007 |
TE-45 Terrebonne Bay Shoreline Protection Demonstration As-Built Drawings (PDF) | Inspection Report | 2/1/2007 |
CS-31 As-Built Sand Fence Repairs (PDF) | Project Completion Report | 1/18/2007 |
BS-11 Project Completion Report (PDF) | Project Completion Report | 1/4/2007 |
GIWW To Clovelly Hydrologic Restoration Timber Pile Cluster and Navigational Aid Replacement (PDF) | Project Completion Report | 1/4/2007 |
CS-31 2006 Project Completion Report (PDF) | Project Completion Report | 12/4/2006 |
CS-11b 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 11/13/2006 |
LA-05 Annual Report 2005-2006 (PDF) | OM&M Report | 11/12/2006 |
PO-32 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/8/2006 |
CS-22 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 11/8/2006 |
CS-11b 2006/2007 Annual Inspection Report (PDF) | Inspection Report | 11/2/2006 |
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF) | Inspection Report | 10/18/2006 |
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF) | Inspection Report | 10/18/2006 |
TE-26 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 9/30/2006 |
ME-22 Project Completion Report (PDF) | Project Completion Report | 9/25/2006 |
ME-23 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 9/1/2006 |
ME-23 General Project Fact Sheet (PDF) | General Project Fact Sheet | 9/1/2006 |
BA-27d Project Completion Report (As-Built) (PDF) | Project Completion Report | 8/31/2006 |
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 6 As Built Drawings (BA-27) (PDF) | AS-BUILT | 8/31/2006 |
TE-28 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 8/17/2006 |
BA-27 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 8/17/2006 |
TE-22 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 8/17/2006 |
BA-02 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 8/17/2006 |
PO-16 2006 Annual Inspection Report (PDF) | Inspection Report | 8/15/2006 |
PO-18 2006 Annual Inspection Report (PDF) | Inspection Report | 8/15/2006 |
PO-22 2006 Annual Inspection Report (PDF) | Inspection Report | 8/15/2006 |
BA-20 2006 Annual Inspection Report (PDF) | Inspection Report | 8/15/2006 |
TE-0040 As-Builts, 2002 to 2006 (PDF) | AS-BUILT | 8/15/2006 |
TE-0040 As-Builts, 2002 to 2006 (PDF) | AS-BUILT | 8/15/2006 |
TE-0040 As-Builts, 2002 to 2006 (PDF) | AS-BUILT | 8/15/2006 |
PO-24 2006 Annual Inspection Report (PDF) | Inspection Report | 8/14/2006 |
PO-06 2006 Annual Inspection Report (PDF) | Inspection Report | 8/14/2006 |
BA-23 2006 Annual Inspection Report (PDF) | Inspection Report | 8/10/2006 |
BA-26 2006 Annual Inspection Report (PDF) | Inspection Report | 8/10/2006 |
TE-18 Comprehensive Monitoring Report No. 1 (PDF) | OM&M Report | 8/1/2006 |
TE-46 Environmental Assemment (PDF) | EA or EIS and Ecological Review | 7/1/2006 |
TE-0040 Habitat Analysis Report, 2005 to 2006 (PDF) | CONTRACTED STUDY | 7/1/2006 |
BA-27 Environmental Assessment (PDF) | Environmental Assessment | 6/16/2006 |
TE-40 Timbalier Island Vegetative Plantings - Phase II (As-built) (PDF) | Project Completion Report | 6/13/2006 |
TE-40 2006 Project Completion Report (PDF) | Project Completion Report | 6/1/2006 |
Installation of Sand Fence on Timbalier Island (TE-0040), June 2006 (PDF) | Project Completion Report | 6/1/2006 |
Pass Chaland to Grand Gayou Pass Barrier Shoreline Restoration Permit MVN 2005-4406-EBB (PDF) | OM&M Report | 5/28/2006 |
BA-02 Hydrodynamic and Salinity Modeling (PDF) | Contract Studies/Data Collection Report | 5/10/2006 |
ME-18 Environmental Assessment with Memos (PDF) | Environmental Assessment | 5/1/2006 |
ME-18 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 5/1/2006 |
Louisiana Department of Natural Resources Report of Geotechnical Investigation Goose Point/Point Platte (PO-0033), St. Tammany Parish, Louisiana (PDF) | GEOTECHNICAL REPORT | 4/20/2006 |
ME-17 Hydrodynamic Modeling 1 of 2 (PDF) | Contract Studies/Data Collection Report | 4/19/2006 |
ME-17 Hydrodynamic Modeling 2 of 2 (PDF) | Contract Studies/Data Collection Report | 4/19/2006 |
BA-42 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/1/2006 |
BA-41 General Project Fact Sheet (PDF) | General Project Fact Sheet | 4/1/2006 |
BA-41 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/1/2006 |
BA-42 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 4/1/2006 |
BA-26 2006 Project Completion Report (PDF) | Project Completion Report | 3/30/2006 |
BA-23 2006 Project Completion Report (PDF) | Project Completion Report | 3/30/2006 |
Lake Borgne Shoreline Protection Coastal Use Permit (PDF) | PERMITS | 3/28/2006 |
BA-27 Ecological Review (PDF) | EA or EIS and Ecological Review | 3/15/2006 |
BA-27c Ecological Review (PDF) | EA or EIS and Ecological Review | 3/15/2006 |
BA-27d Ecological Review (PDF) | EA or EIS and Ecological Review | 3/15/2006 |
ME-22 2006 Environmental Assessment (PDF) | Environmental Assessment | 3/7/2006 |
AT-04 Environmental Assessment (PDF) | Environmental Assessment | 3/1/2006 |
BA-25b Final Phase 2 Design Report part 1 of 6 (PDF) | Contract Studies/Data Collection Report | 3/1/2006 |
BA-25 Phase 2 Design Report (PDF) | Contract Studies/Data Collection Report | 3/1/2006 |
ME-04 2006 Completion Report Maintenance/Repair (PDF) | Project Completion Report | 3/1/2006 |
Rockefeller Refuge Gulf Shoreline Stabilization Final Design Report (PDF) | DESIGN REPORT | 2/15/2006 |
TV-04 and TV-17 Repair and Maintenance - As Built Drawings (PDF) | Project Completion Report | 2/1/2006 |
ME-20 Hydrodynamic Modeling 1 of 4 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
ME-20 Hydrodynamic Modeling 2 of 4 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
ME-20 Hydrodynamic Modeling 3 of 4 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
ME-20 Hydrodynamic Modeling 4 of 4 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
BA-04c Hydrodynamic Modeling 1 of 3 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
BA-04c Hydrodynamic Modeling 2 of 3 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
BA-04c Hydrodynamic Modeling 3 of 3 (PDF) | Contract Studies/Data Collection Report | 1/24/2006 |
GIWW Bank Restoration of Critical Areas in Terrebonne UASCE Permit MVN 2004-4534 CY (PDF) | PERMITS | 1/18/2006 |
AT-02 2005 Bi-Annual Inspection Report (PDF) | Inspection Report | 12/30/2005 |
2005 Bi-Annual Inspection Report for Big Island Mining (PDF) | Inspection Report | 12/30/2005 |
AT-02 Monitoring Plan (PDF) | Monitoring Plan | 12/27/2005 |
BA-27 Monitoring Plan (PDF) | Monitoring Plan | 12/27/2005 |
BA-25b Phase 1 Design Report Cover Pages (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Executive Summary (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Table of Contents (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 1 - Introduction (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 2 - Overview of Alternatives Development (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 3 - Conveyance Evaluation (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 4 - Diversion Structures (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 5 - Infrastructure, Utility, and Site Modifications (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 6 - Dredging, Disposal, and Beneficial Reuse Analysis (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 7 - Comparison of Alternatives (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 8 - Recommended Alternatives for the 30 Percent Design Evaluation (PDF) | Project Report | 12/15/2005 |
BA-25b Phase 1 Design Report Section 9 - LDNR and U.S. EPA Review (PDF) | Project Report | 12/15/2005 |
GIWW Bank Restoration of Critical Areas in Terrebonne Coastal Zone Consistency Permit (PDF) | PERMITS | 12/7/2005 |
TE-47 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 12/1/2005 |
LA-05 Project Plan and Environmental Assessment (PDF) | EA or EIS and Ecological Review | 12/1/2005 |
PO-30 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 12/1/2005 |
TE-23 Comprehensive Monitoring Report 1 (PDF) | OM&M Report | 12/1/2005 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration 95% Design Report (PDF) | DESIGN REPORT | 12/1/2005 |
BA-30 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/30/2005 |
BA-30 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/30/2005 |
PO-30 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/22/2005 |
TE-46 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/22/2005 |
BS-03a 2006 Annual Inspection Report (PDF) | Inspection Report | 11/17/2005 |
TE-23 2005 Operation, Maintenance, Repair, Replacement, and Rehabilitation Plan (PDF) | Project Report | 11/14/2005 |
Operation, Maintenance, and Rehabilitation Plan for the West Belle Pass Headland Restoration Project (TE - 23 / PTE - 27) (PDF) | OMM Plan | 11/14/2005 |
BA-35 Ecological Review (PDF) | EA or EIS and Ecological Review | 11/7/2005 |
CS-20 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 11/3/2005 |
CRMS - Wetlands, Status Report for the CWPPRA Task Force (PDF) | Project Report | 11/3/2005 |
BA-25b Phase 1 Design Report part 1 of 5 (PDF) | Contract Studies/Data Collection Report | 11/1/2005 |
BA-25 Phase 1 Design Report (PDF) | Contract Studies/Data Collection Report | 11/1/2005 |
BA-36 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 11/1/2005 |
Lake Borgne Shoreline Protection 95% Design Report (PDF) | DESIGN REPORT | 11/1/2005 |
AT-04 Ecological Review (PDF) | EA or EIS and Ecological Review | 10/27/2005 |
CS-18 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/27/2005 |
West Lake Boudreaux Shoreline Protection and Marsh Creation 95% Design Report (PDF) | DESIGN REPORT | 10/26/2005 |
CS-17 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/24/2005 |
CS-21 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/24/2005 |
CS-31 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/24/2005 |
ME-09 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/21/2005 |
ME-14 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/20/2005 |
TV-17 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/20/2005 |
ME-11 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/19/2005 |
CS-23 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/13/2005 |
ME-19 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/12/2005 |
TE-47 Ecological Review (PDF) | EA or EIS and Ecological Review | 10/12/2005 |
TV-15 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/11/2005 |
TV-04 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/11/2005 |
TV-14 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/10/2005 |
ME-13 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/7/2005 |
ME-04 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/7/2005 |
CS-24 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/6/2005 |
CS-27 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/6/2005 |
CS-30 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/6/2005 |
TV-18 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/4/2005 |
TV-09 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/4/2005 |
TV-13a 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/4/2005 |
TV-12 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/4/2005 |
TV-03 2005/2006 Annual Inspection Report (PDF) | Inspection Report | 10/4/2005 |
TE-22 Breach Repairs (As-Built) (PDF) | Project Completion Report | 10/4/2005 |
ME-18 Ecological Review (PDF) | EA or EIS and Ecological Review | 9/20/2005 |
GIWW Bank Restoration of Critical Areas in Terrebonne Water Quality Certification (PDF) | PERMITS | 9/20/2005 |
ME-18 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 9/20/2005 |
TE-45 Monitoring Plan (PDF) | OMM Plan | 9/12/2005 |
Rockefeller Refuge Gulf Shoreline Stabilization (ME-0018) Ecological Review (PDF) | ECOLOGICAL REVIEW | 9/5/2005 |
TE-22 Project Completion Report (PDF) | Project Completion Report | 9/1/2005 |
TE-48 Monitoring Plan (PDF) | OMM Plan | 8/24/2005 |
BA-37 Monitoring Plan (PDF) | OMM Plan | 8/16/2005 |
MR-09 Final Report (PDF) | Project Completion Report | 8/8/2005 |
TE-22 2005 Operations, Maintenance, and Monitoring Report (PDF) | Monitoring Report | 8/1/2005 |
Raccoon Island Shoreline Protection and Marsh Creation Offshore Geophysical and Preliminary Geotechnical Survey Report (PDF) | GEOTECHNICAL REPORT | 7/15/2005 |
PO-32 Ecological Review (PDF) | EA or EIS and Ecological Review | 7/12/2005 |
TE-48 Ecological Review (PDF) | EA or EIS and Ecological Review | 7/6/2005 |
Lake Borgne Shoreline Protection Preliminary Design Report (PDF) | DESIGN REPORT | 7/1/2005 |
LA-03b Nutria Harvest Distribution 2004-2005 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2005 (PDF) | OM&M Report | 6/30/2005 |
MR-09 Project Completion Report (PDF) | Project Completion Report | 6/28/2005 |
MR-09 Project Completion Report - Hydro Consultants, Inc. (PDF) | Project Completion Report | 6/28/2005 |
TE-36 Close Out Report (PDF) | Close Out Report | 6/27/2005 |
TE-40 Timbalier Island Vegetative Plantings - Phase I (As-built) (PDF) | Project Completion Report | 6/23/2005 |
LA-05 Monitoring Plan (PDF) | OMM Plan | 6/13/2005 |
TV-15 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TV-16 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TV-17 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TE-25 and TE-30 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TE-25 and TE-30 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TE-28 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TV-09 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
PO-22 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
ME-11 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
ME-13 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
ME-09 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-28-1 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-30 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-17 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-18 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-23 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-24 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-22 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-11b 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TV-03 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TV-14 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
TV-18 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
BA-03c 2005 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/1/2005 |
CS-20 2005 Comprehensive Monitoring Report (PDF) | OM&M Report | 5/20/2005 |
ME-22 Monitoring Plan (PDF) | OMM Plan | 5/16/2005 |
BS-12 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 5/12/2005 |
BS-12 General Project Fact Sheet (PDF) | General Project Fact Sheet | 5/12/2005 |
ME-21 Monitoring Plan (PDF) | OMM Plan | 5/10/2005 |
ME-16 Monitoring Plan (PDF) | OMM Plan | 5/10/2005 |
Rockefeller Refuge Gulf Shoreline Stabilization 95% Design Report (PDF) | DESIGN REPORT | 5/2/2005 |
TE-48 Raccoon Island Shoreline Protection and Marsh Creation (Phase A) As-Built Drawings (PDF) | AS-BUILT | 5/1/2005 |
BA-03c Project Completion Report (PDF) | Project Completion Report | 4/13/2005 |
PO-24 2005 Project Completion Report (PDF) | Project Completion Report | 4/4/2005 |
TE-40 Project Completion Report As-Built Drawings (PDF) | Project Completion Report | 3/29/2005 |
Coastwide Reference Monitoring System - Wetlands, Status Report for the CWPPRA Technical Committee, March 15, 2005 (PowerPoint Presentation) | Project Report | 3/15/2005 |
TE-40 2005 Project Completion Report (PDF) | Project Completion Report | 3/1/2005 |
TE-36 Final Report (PDF) | OM&M Report | 3/1/2005 |
TE-48 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 3/1/2005 |
ME-16 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 3/1/2005 |
TE-0040 Project Completion Report, Timbalier Island Marsh/Dune Restoration Project (PDF) | Project Completion Report | 3/1/2005 |
TV-11b Monitoring Plan (PDF) | OMM Plan | 2/3/2005 |
BA-40 General Project Fact Sheet (PDF) | General Project Fact Sheet | 2/1/2005 |
BA-40 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 2/1/2005 |
CS-23 2005 Project Completion Report (PDF) | Project Completion Report | 1/27/2005 |
TV-17 Project Completion Report (PDF) | Project Completion Report | 1/25/2005 |
CS-17 Draft 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 1/24/2005 |
TV-15 Project Completion Report As-Built Drawings (PDF) | Project Completion Report | 1/14/2005 |
PO-24 Project Completion Report (PDF) | Project Completion Report | 1/12/2005 |
TV-15 Monitoring Plan (PDF) | OMM Plan | 1/5/2005 |
ME-19 Project Completion Report (PDF) | Project Completion Report | 1/3/2005 |
TV-15 Project Completion Report (PDF) | Project Completion Report | 1/1/2005 |
TE-17 Project Completion Report As-Built Drawings (PDF) | Project Completion Report | 12/16/2004 |
PO-30 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 12/16/2004 |
Lake Chapeau Warning Buoy Replacement (TE-26) Terrebonne Parish, LA DNR Contract No. 2503-03-18 Survey and Engineering Services (PDF) | Project Completion Report | 12/1/2004 |
CS-32 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 11/1/2004 |
ME-22 Ecological Review (PDF) | EA or EIS and Ecological Review | 9/17/2004 |
TE-48 Phase A Ecological Review (PDF) | EA or EIS and Ecological Review | 9/16/2004 |
ME-21 Ecological Review (PDF) | EA or EIS and Ecological Review | 9/14/2004 |
ME-22 Finding of No Significant Impact (PDF) | EA or EIS and Ecological Review | 9/13/2004 |
ME-22 2004 Environmental Assessment (PDF) | Environmental Assessment | 9/13/2004 |
TE-43 Ecological Review (PDF) | EA or EIS and Ecological Review | 9/9/2004 |
TE-39 Ecological Review (PDF) | EA or EIS and Ecological Review | 9/2/2004 |
Lake Borgne and MRGO Shoreline Protection Ecological Review (PDF) | ECOLOGICAL REVIEW | 9/1/2004 |
ME-22 Wetland Value Assessment (PDF) | WVA Pre-Design | 8/31/2004 |
TE-44 Construction Unit 2 Ecological Review (PDF) | EA or EIS and Ecological Review | 8/26/2004 |
TE-44 Ecological Review (PDF) | EA or EIS and Ecological Review | 8/26/2004 |
ME-16 Ecological Review (PDF) | EA or EIS and Ecological Review | 8/25/2004 |
Freshwater Introduction South of Highway 82 Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 8/12/2004 |
BA-36 Ecological Review (PDF) | EA or EIS and Ecological Review | 8/12/2004 |
GEOTECHNICAL STUDY TEST SECTIONS ROCKEFELLER REFUGE GULF SHORELINE STABILIZATION PROJECT, CAMERON PARISH, LOUISIANA (PDF) | GEOTECHNICAL REPORT | 8/12/2004 |
TE-41 Monitoring Plan (PDF) | OMM Plan | 8/5/2004 |
TE-41 2004 Operation, Maintenance, and Rehabilitation Plan (PDF) | Project Report | 8/1/2004 |
Operation, Maintenance, and Rehabilitation Plan for the Mandalay Bank Protection Demonstration State Project No. TE-0041 (PDF) | OMM Plan | 8/1/2004 |
North Lake Mechant Landbridge Restoration 95% Design Report (PDF) | DESIGN REPORT | 8/1/2004 |
TV-18 Monitoring Plan (PDF) | OMM Plan | 7/19/2004 |
TV-17 Monitoring Plan (PDF) | OMM Plan | 7/15/2004 |
BA-02 2003 Operations, Maintenance and Monitoring Report (PDF) | OM&M Report | 7/8/2004 |
TE-17 Project Completion Report (PDF) | Project Completion Report | 7/1/2004 |
LA-03b Nutria Harvest Distribution 2003-2004 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2004 (PDF) | OM&M Report | 6/30/2004 |
Task 3 from Request For Proposal - Project Specific Station Coordinates (Zipped file) | Raw Data | 6/29/2004 |
TE-28 2003 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 6/14/2004 |
Task 3 from Request For Proposal - Project Specific Station Location Maps (PDF) | Project Report | 6/2/2004 |
ME-22 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
LA-06 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-49 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
TV-20 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
LA-05 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
PO-33 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
PO-32 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
PO-30 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
BA-39 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
BA-25b General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
BA-34-2 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-37 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
MR-14 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-40 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-50 General Project Fact Sheet (PDF) | General Project Fact Sheet | 6/1/2004 |
BA-39 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
LA-05 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
LA-06 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
BA-25b General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
BA-34-2 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
ME-22 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
MR-14 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
PO-30 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
PO-32 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
PO-33 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-49 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-50 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
TV-20 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-37 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
TE-40 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 6/1/2004 |
AT-03 Monitoring Report (PDF) | Monitoring Report | 5/5/2004 |
AT-03 Operation, Maintenance, and Rehabilitation Plan (PDF) | OM&M Report | 5/5/2004 |
AT-02 Operation, Maintenance, and Rehabilitation Plan (PDF) | OM&M Report | 5/5/2004 |
Operation, Maintenance, Repair, Replacement and Rehabilitation Plan for the Bayou Chevee Shoreline Protection Project (PO-22) (PDF) | OMM Plan | 5/5/2004 |
BA-23 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
PO-22 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
PO-17 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-27 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TV-09 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-28 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
BS-03a 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-17 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
ME-09 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
PO-27 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
MR-06 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TV-16 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-22 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
ME-13 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
PO-06 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-21 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-31 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TV-12 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
BA-28 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-11b 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-18 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-23 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-24 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-28-1 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
CS-30 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
ME-11 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
ME-14 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-20 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-24 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-26 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-27 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-41 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TE-44 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TV-03 2004 Operations, Maintenance, and Monitoring Report (PDF) | OM&M Report | 5/1/2004 |
TV-18 Project Completion Report As Built Drawings (PDF) | Project Completion Report | 4/22/2004 |
TE-22 Comprehensive Monitoring Report Part 1 of 2 (PDF) | Comprehensive Monitoring Report | 4/5/2004 |
TE-22 Comprehensive Monitoring Report Part 2 of 2 (PDF) | Comprehensive Monitoring Report | 4/5/2004 |
ME-21 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 4/2/2004 |
TV-18 Project Completion Report (PDF) | Project Completion Report | 4/1/2004 |
Biological Monitoring Section Standard Operating Procedures (PDF) | Project Report | 3/15/2004 |
BA-38 Environmental Assessment 2004 (PDF) | Environmental Assessment | 3/1/2004 |
Barataria Barrier Island Complex: Pelican Island and Pass La Mer to Chaland Pass Restoration Environmental Protection (BA-0038) (PDF) | BID DOCUMENTS | 2/6/2004 |
TE-41 Project Completion Report (As-Built) (PDF) | Project Completion Report | 2/5/2004 |
TE-41 Project Completion Report (PDF) | Project Completion Report | 2/1/2004 |
BA-27d Environmental Assessment (PDF) | EA or EIS and Ecological Review | 2/1/2004 |
TE-28 Brady Canal Maintenance Project Levee Refurbishment along the West Bank of Jug Lake (PDF) | Project Completion Report | 1/28/2004 |
ME-09 Summary Data and Graphics (PDF) | Summary Data and Graphics | 1/27/2004 |
TV-11b Ecological Review (PDF) | EA or EIS and Ecological Review | 1/22/2004 |
BA-27d Wetland Value Assessment (PDF) | WVA Pre-Design | 1/7/2004 |
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Geotechnical Investigation (PDF) | GEOTECHNICAL REPORT | 12/23/2003 |
BA-38 Environmental Assessment 2003 (PDF) | Environmental Assessment | 12/22/2003 |
BA-20 Project Completion Report (Construction Unit 3) (PDF) | Project Completion Report | 12/16/2003 |
BA-38 Wetland Value Assessment (PDF) | WVA Pre-Design | 12/8/2003 |
CS-27 Summary Data and Graphics (PDF) | OM&M Report | 12/8/2003 |
BA-38 Ecological Review (PDF) | EA or EIS and Ecological Review | 12/3/2003 |
BS-03a Annual Report 2003 (PDF) | OM&M Report | 12/1/2003 |
BA-20 Project Completion Report As-Built Plans (PDF) | Project Completion Report | 12/1/2003 |
CS-17 Comprehensive Monitoring Report (PDF) | OM&M Report | 12/1/2003 |
Timbalier Island Dune and Marsh Creation Bid Package (PDF) | BID DOCUMENTS | 12/1/2003 |
Timbalier Island Dune and Marsh Creation Bid Package (PDF) | BID DOCUMENTS | 12/1/2003 |
Timbalier Island Dune and Marsh Creation Bid Package (PDF) | BID DOCUMENTS | 12/1/2003 |
TV-16 Summary Data and Graphics (PDF) | OM&M Report | 11/18/2003 |
CS-22 Summary Data and Graphics (PDF) | OM&M Report | 11/18/2003 |
Pelican Island Bid Documents and Appendices (PDF) | BID DOCUMENTS | 11/18/2003 |
Pelican Island Bid Documents and Appendices (PDF) | BID DOCUMENTS | 11/18/2003 |
Pelican Island Bid Documents and Appendices (PDF) | BID DOCUMENTS | 11/18/2003 |
Pelican Island Bid Documents and Appendices (PDF) | BID DOCUMENTS | 11/18/2003 |
Pelican Island Bid Documents and Appendices (PDF) | BID DOCUMENTS | 11/18/2003 |
TE-28 Summary Data and Graphics part 1 of 3 (PDF) | Summary Data and Graphics | 11/10/2003 |
TE-28 Summary Data and Graphics part 2 of 3 (PDF) | Summary Data and Graphics | 11/10/2003 |
TE-28 Summary Data and Graphics part 3 of 3 (PDF) | Summary Data and Graphics | 11/10/2003 |
Chaland Headland 95% Plans (PDF) | DESIGN REPORT | 11/7/2003 |
Pelican 95% Plans (PDF) | DESIGN REPORT | 11/7/2003 |
CS-11b Summary Data and Graphics (PDF) | OM&M Report | 11/3/2003 |
BA-38 Draft Bid Documents for Vegetative Plantings (PDF) | BID DOCUMENTS | 11/1/2003 |
BA-38 Draft Bid Documents for Vegetative Plantings (PDF) | BID DOCUMENTS | 11/1/2003 |
BA-38 Draft Bid Documents for Vegetative Plantings (PDF) | BID DOCUMENTS | 11/1/2003 |
BA-38 Draft Bid Documents for Vegetative Plantings (PDF) | BID DOCUMENTS | 11/1/2003 |
BA-38 Draft Bid Documents for Vegetative Plantings (PDF) | BID DOCUMENTS | 11/1/2003 |
Report of Geotechnical Investigation Barataria Barrier Island Restoration Complex Project BA-38 Chaland and Pelican Headlands (PDF) | GEOTECHNICAL REPORT | 10/30/2003 |
TE-45 Ecological Review (PDF) | EA or EIS and Ecological Review | 10/28/2003 |
Pecan Island Terracing Geotechnical Report (PDF) | GEOTECHNICAL REPORT | 10/28/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Pelican Island Bid Documents (PDF) | BID DOCUMENTS | 10/18/2003 |
Chaland Headland Issued Permits (PDF) | PERMITS | 10/13/2003 |
Chaland Headland Issued Permits (PDF) | PERMITS | 10/13/2003 |
Chaland Headland Issued Permits (PDF) | PERMITS | 10/13/2003 |
Chaland Headland Issued Permits (PDF) | PERMITS | 10/13/2003 |
Chaland Headland Issued Permits (PDF) | PERMITS | 10/13/2003 |
TV-18 Ecological Review (PDF) | EA or EIS and Ecological Review | 10/9/2003 |
CS-23 Summary Data and Graphics (PDF) | OM&M Report | 10/1/2003 |
BA-37 Environmental Assessment (PDF) | EA or EIS and Ecological Review | 10/1/2003 |
ME-18 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
ME-19 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-03 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-09 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-10 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-11 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-12 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-13 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-24 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-26 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-27 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-10 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-32a General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-34 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-39 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-41 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-43 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-44 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-45 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TV-11b General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TV-15 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TV-19 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-22 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
AT-04 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-03c General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-04c General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-20 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-27 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-27c General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-28 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-30 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-33 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BS-03a General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BS-10 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
BS-11 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
CS-09 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
CS-29 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
CS-32 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
LA-03a General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
ME-11 General Project Fact Sheet (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-41 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-43 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-44 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-45 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-39 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-32a General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-34 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-24 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-26 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-27 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TV-19 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TV-15 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TV-11b General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
TE-10 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-03 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
ME-18 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
ME-19 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-09 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-10 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-11 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-12 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
MR-13 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-27 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-27c General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-28 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-30 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-33 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-20 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-03c General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BA-04c General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
AT-04 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
PO-22 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
ME-11 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
CS-29 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
CS-32 General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
LA-03a General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BS-03a General Project Fact Sheet High Quality (PDF) | General Project Fact Sheet | 10/1/2003 |
BS-10 General Project Fact Sheet High Quality (PDF) | |