CWPPRA Project Reports

Filter by:
Year:   Report Type:

ReportTypePublished
BA-276 General Project Fact Sheet (PDF)General Project Fact Sheet3/18/2024
BA-276 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/18/2024
BS-47 General Project Fact Sheet (PDF)General Project Fact Sheet3/18/2024
BS-47 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/18/2024
TE-0072 Monitoring Plan for Lost Lake Marsh Creation and Hydrologic Restoration Project (PDF)OMM Plan2/14/2024
2024 Operations, Maintenance, and Monitoring Report for Grand-White Lakes Land Bridge Protection (PDF)OM&M Report2/1/2024
2023 Operations, Maintenance, and Monitoring Report for Black Bayou Culverts Hydrologic Restoration (CS-29) (PDF)OM&M Report12/1/2023
No Name Bayou Marsh Creation and Nourishment Project (CS-0078) Bid Documents (PDF)BID DOCUMENTS10/31/2023
Notes on Adjustment of CRMS Water Level Data for the 2021 Coastwide Survey Update (PDF)SURVEY REPORT10/2/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
OM Plan for TE-0072 Lost Lake Hydraulic Restoration Marsh Creation (PDF)OMM Plan10/1/2023
DESIGN REPORT South Grand Chenier Baker Tract Marsh Creation (ME-32) (PDF)DESIGN REPORT9/26/2023
Project Completion Report on Bayou Decade Ridge Marsh (TE-0138) Vegetative Planting (PDF)Project Completion Report9/1/2023
Project Completion Report on Bayou Decade Ridge Marsh (TE-0138) Vegetative Planting (PDF)Project Completion Report9/1/2023
Project Completion Report on Bayou Decade Ridge Marsh (TE-0138) Vegetative Planting (PDF)Project Completion Report9/1/2023
2022 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF)OM&M Report9/1/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171) (PDF)Project Completion Report8/28/2023
2023 Monitoring Close-Out Report for Timbalier Island Dune and Marsh Restoration (TE-40) (PDF)OM&M Report8/25/2023
Rock Dike Profile and Settlement Plates Survey for West Lake Boudreaux Shoreline Protection and Marsh Creation Project (TE-0046) (PDF)SURVEY REPORT8/17/2023
A Standard Operating Procedures Manual for the Coastwide Reference Monitoring System-Wetlands and the System-Wide Assessment and Monitoring Program: Methods for Site Establishment, Data Collection, and Quality Assurance/Quality Control (PDF)General Programmatic Document8/12/2023
BS-46 General Project Fact Sheet (PDF)General Project Fact Sheet8/10/2023
BS-46 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet8/10/2023
Caminada Headland Back Barrier Marsh Creation (BA-171) Final Fact Sheet (PDF)FACT SHEET8/1/2023
Monitoring Plan for Bayou De Cade Ridge Restoration and Marsh Creation (TE-0138) (PDF)OMM Plan7/7/2023
BS-46 General Project Fact Sheet (PDF)General Project Fact Sheet5/24/2023
BS-46 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/24/2023
BA-268 General Project Fact Sheet (PDF)General Project Fact Sheet5/23/2023
BA-268 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/23/2023
2022 Operations, Maintenance, and Monitoring Report for South Lake Lery Shoreline and Marsh Restoration (BS-0016) (PDF)OM&M Report5/1/2023
Permits for TE-0134 West Fourchon Marsh Creation Nourishment Project (PDF)PERMITS4/5/2023
Permits for TE-0134 West Fourchon Marsh Creation Nourishment Project (PDF)PERMITS4/5/2023
Operation, Maintenance, Repair, and Rehabilitation Plan for Lost Lake Marsh Creation and Hydrologic Restoration Project (TE-0072) (PDF)OMM Plan3/15/2023
Operation Maintenance, and Rehabilitation Plan for Bayou Decade Ridge and Marsh Creation;;;PROJECT (TE-0138) (PDF)OMM Plan3/8/2023
2023 Operations, Maintenance, and Monitoring Report for Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing (BA-0164) (PDF)OM&M Report1/1/2023
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
East Delacroix Marsh Creation and Terracing Project (BS-0037) 95% Design Report (PDF)DESIGN REPORT12/28/2022
2022 Operations, Maintenance, and Monitoring Report for Bayou Dupont Marsh and Ridge Creation (BA-0048) (PDF)OM&M Report12/1/2022
2022 Operations, Maintenance and Monitoring Report for South White Lake Shoreline Protection (PDF)OM&M Report12/1/2022
2022 Operations, Maintenance, and Monitoring Report for Sediment Trapping at the Jaws (TV-15) (PDF)OM&M Report12/1/2022
2022 Operations, Maintenance, and Monitoring Report for West Bay Sediment Diversion (MR-0003) (PDF)OM&M Report11/1/2022
2022 Elevation Survey Methodology Report for Northwest Turtle Bay (BA-0125) (PDF)SURVEY REPORT10/27/2022
Bid Package for Mid Breton Land Bridge Marsh Creation and Terracing Project (BS-0032) (PDF)BID DOCUMENTS10/17/2022
Bid Package for Mid Breton Land Bridge Marsh Creation and Terracing Project (BS-0032) (PDF)BID DOCUMENTS10/17/2022
Bid Package for Mid Breton Land Bridge Marsh Creation and Terracing Project (BS-0032) (PDF)BID DOCUMENTS10/17/2022
2022 Annual Inspection Report for the Lake Borgne Shoreline Protection Project (PDF)Inspection Report10/1/2022
Project Completion Report for Bayou De Cade Ridge and Marsh Creation Project (TE-0138) (PDF)Project Completion Report10/1/2022
2022 Operations, Maintenance, and Monitoring Report for Grand-White Lake Land Bridge Protection (PDF)OM&M Report9/1/2022
Bayou Cane Marsh Creation Project PO-0181 95% Design Report (PDF)DESIGN REPORT8/16/2022
Monitoring Plan for Cameron Creole Freshwater Introduction (CS-0049) (PDF)OMM Plan8/1/2022
2022 Annual Inspection Report for Goose Point / Point Platte Marsh Creation Project (PDF)Inspection Report7/1/2022
2022 Monitoring Plan for Cameron Meadows Marsh Creation and Terracing (CS-0066) (PDF)OMM Plan7/1/2022
2022 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protections and Freshwater Bayou Bank Stabilization (PDF)OM&M Report6/1/2022
2022 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protection and Freshwater Bayou Bank Stabilization (PDF)OM&M Report6/1/2022
2022 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (PDF)OM&M Report6/1/2022
Monitoring of the Lac des Allemands Swamp (BA-34-2) Hydrologic Restoration Project Annual Report - Fall 2021 (PDF)CONTRACTED STUDY5/31/2022
2021 Monitoring Close-out Report for Isles Dernieres Restoration Whiskey Island (TE-27) and Whiskey Island Back Barrier Marsh Creation (TE-50) Projects (PDF)OM&M Report5/3/2022
2021 Monitoring Close-out Report for Isles Dernieres Restoration Whiskey Island (TE-27) and Whiskey Island Back Barrier Marsh Creation (TE-50) Projects (PDF)OM&M Report5/3/2022
Operation, Maintenance, and Rehabilitation Plan for the Barataria Land Bridge Shoreline Protection Project (BA-27c), Construction Units No. 7 and No. 8 (PDF)OMM Plan5/2/2022
2021 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles – 3, 4 5 (PDF)OM&M Report5/1/2022
2021 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles – 3, 4 5 (PDF)OM&M Report5/1/2022
2022 Operations, Maintenance, and Monitoring Report for Grand Liard Marsh and Ridge Restoration (BA-0068) (PDF)OM&M Report4/21/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Topographic Survey for Lost Lake Marsh Creation and Hydrologic Restoration (TE-0072) (PDF)SURVEY REPORT3/29/2022
Monitoring Plan for Northwest Turtle Bay Marsh Creation (BA-0125) (PDF)OMM Plan3/17/2022
CS-88 General Project Fact Sheet (PDF)General Project Fact Sheet3/2/2022
CS-88 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/2/2022
TE-171 General Project Fact Sheet (PDF)General Project Fact Sheet3/2/2022
TE-171 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/2/2022
BA-257 General Project Fact Sheet (PDF)General Project Fact Sheet3/2/2022
BA-257 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/2/2022
BA-258 General Project Fact Sheet (PDF)General Project Fact Sheet3/2/2022
BA-258 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/2/2022
2022 Operations, Maintenance, and Monitoring Closeout Report for Sweet Lake/Willow Lake Hydrologic Restoration (PDF)OM&M Report3/1/2022
2021 Operations, Maintenance, and Monitoring Report for Pecan Island Terracing (ME-14) (PDF)OM&M Report3/1/2022
Project Completion Report for Lake Borgne Shoreline Protection Project (PO-0030) Sheet Pile Wall Maintenance (2021) (PDF)Project Completion Report3/1/2022
Hydraulic and Water Quality Modeling of Proposed River Reintroduction into Maurepas Swamp (PO-0029) (PDF)CONTRACTED STUDY2/18/2022
Delta Wide Crevasses (MR-0009) Maintenance Event 4 Project Completion Report (PDF)Project Completion Report2/1/2022
Geotechnical Investigation Data Report Phoenix Marsh Creation Borrow Material Study (BS-0042 and BS-0044) (PDF)GEOTECHNICAL REPORT1/25/2022
Geotechnical Investigation Data Report Phoenix Marsh Creation Borrow Material Study (BS-0042 and BS-0044) (PDF)GEOTECHNICAL REPORT1/25/2022
2020 Annual Inspection Report for Goose Point / Point Platte Marsh Creation Project (PO-33) (PDF)Inspection Report12/1/2021
2020 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF)Inspection Report12/1/2021
2021 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF)Inspection Report12/1/2021
CS-85 Draft Environmental Assessment (PDF)Environmental Assessment11/18/2021
2021/2022 Annual Inspection Report for East Marsh Island Marsh Creation Project (TV-21) (PDF)Inspection Report11/17/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design Report (PDF)DESIGN REPORT11/12/2021
Post Hurricane Monitoring Report Rockefeller Refuge Gulf Shoreline Stabilization Project (PDF)CONTRACTED STUDY10/15/2021
2021/2022 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-2);Permanent Pipeline (PDF)Inspection Report10/5/2021
Final Survey Report for North Delacroix Marsh Creation and Terracing Project (BS-0041): Topographic, Bathymetric,;Magnetometer and other Professional Land Survey Services (PDF)SURVEY REPORT10/4/2021
2021 Monitoring Plan for Rockefeller Gulf Shoreline Stabilization (ME-0018) (PDF)OMM Plan9/28/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
TE-0117 Island Road Marsh Creation and Nourishment Project 95% Design Report (PDF)DESIGN REPORT9/8/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
Design Report for Long Point Bayou (CS-0085) (PDF)DESIGN REPORT9/1/2021
2021 Operations, Maintenance, and Monitoring Report for Coastwide Vegetative Planting Project (LA-0039) (PDF)OM&M Report9/1/2021
2021 Operations, Maintenance, and Monitoring Report for Cameron Creole Maintenance Project (PDF)OM&M Report9/1/2021
Post Hurricane Monitoring Report Rockefeller Refuge Gulf Shoreline Stabilization Project (PDF)CONTRACTED STUDY8/18/2021
Geotechnical Engineering Services Report. Breton Landbridge West Marsh Creation Project (BS-0038). Plaquemines Parish, Louisiana (PDF)GEOTECHNICAL REPORT8/16/2021
Permits for North Delacroix Marsh Creation and Terracing Project (BS-0041) (PDF)PERMITS8/13/2021
Permits for North Delacroix Marsh Creation and Terracing Project (BS-0041) (PDF)PERMITS8/13/2021
Monitoring Plan for Mid Breton Landbridge Marsh Creation and Terracing (BS-0032) (PDF)OMM Plan8/1/2021
2021/2022 Annual Inspection Report for Black Bayou Culverts Hydrologic Restoration Project (CS-29) (PDF)Inspection Report7/22/2021
Operation and Maintenance Plan for Bayou Bonfouca Marsh Creation Project (PO-0104) (PDF)OMM Plan6/28/2021
2021 Monitoring Plan for Cameron Creole Maintenance (CS-0004a) (PDF)OMM Plan6/1/2021
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF)BID DOCUMENTS6/1/2021
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF)BID DOCUMENTS6/1/2021
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF)BID DOCUMENTS6/1/2021
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF)BID DOCUMENTS6/1/2021
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF)BID DOCUMENTS6/1/2021
New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project (PO 0169) Bid Documents (PDF)BID DOCUMENTS6/1/2021
Monitoring of the Lac des Allemands Swamp (BA-34-2) Hydrologic Restoration - Fall 2020 (PDF)CONTRACTED STUDY5/31/2021
Geotechnical Engineering Report (Revised) East Delacroix Marsh Creation Project, Phase II (BS-37) (PDF)GEOTECHNICAL REPORT5/26/2021
Mid-Breton Land Bridge Marsh Creation and Terracing (BS-32) 95% Design Report (PDF)DESIGN REPORT5/7/2021
Phase I Environmental Site Assessment Report North Delacroix Marsh Creation Project (PDF)CONTRACTED STUDY5/1/2021
Project Completion Report for Goose Point/Point Platte Marsh Creation (PO-0033) and Bayou Bonfouca Marsh Creation (PO-0104) Tidal Features Maintenance Project (PDF)Project Completion Report4/1/2021
Project Completion Report for Goose Point/Point Platte Marsh Creation (PO-0033) and Bayou Bonfouca Marsh Creation (PO-0104) Tidal Features Maintenance Project (PDF)Project Completion Report4/1/2021
BS-44 General Project Fact Sheet (PDF)General Project Fact Sheet3/29/2021
BS-44 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/29/2021
TE-166 General Project Fact Sheet (PDF)General Project Fact Sheet3/9/2021
TE-166 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/9/2021
BS-43 General Project Fact Sheet (PDF)General Project Fact Sheet3/9/2021
BS-43 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/9/2021
Breton Landbridge Marsh Creation (West) (BS-38) Numerical Modeling and Wave Impact Analysis (PDF)CONTRACTED STUDY2/26/2021
2020 Short Summary Report for East Marsh Island Marsh Creation (TV-21) (PDF)OM&M Report2/1/2021
Breton Landbridge Marsh Creation (West) (BS-38) Geotechnical Data Report (PDF)GEOTECHNICAL REPORT1/4/2021
East Delacroix Marsh Creation and Terracing (BS-37) Geotechnical Data Report (PDF)GEOTECHNICAL REPORT12/11/2020
2020 Operations, Maintenance, and Monitoring Report for Black Bayou Culverts Hydrologic Restoration (CS-29) (PDF)OM&M Report12/1/2020
2020 Operations, Maintenance, and Monitoring Report for Sabine Structure Replacement (CS-23) (PDF)OM&M Report12/1/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030 (PDF)DATA COLLECTION10/30/2020
No Name Bayou Marsh Creation and Nourishment 95% Design Report (PDF)DESIGN REPORT10/1/2020
Post Hurricane Laura Review: Impact on Existing Coastal Protection and Restoration Projects (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
Post Hurricane Laura Review: Impact on Existing CPRA Projects (PDF)MEETING PRESENTATIONS AND MINUTES9/30/2020
TE-0138 Conformed Stamped Plans and Specs (PDF)BID DOCUMENTS9/23/2020
Geotechnical Report for Long Point Bayou (CS-0085) (PDF)GEOTECHNICAL REPORT9/17/2020
Geotechnical Report for Long Point Bayou (CS-0085) (PDF)GEOTECHNICAL REPORT9/17/2020
Survey Report for Long Point Bayou (CS-0085) (PDF)SURVEY REPORT9/14/2020
Survey Report for Long Point Bayou (CS-0085) (PDF)SURVEY REPORT9/14/2020
2020 Monitoring Close-out Report for Isles Dernieres Restoration East Island (TE-20), Isles Dernieres Restoration Trinity Island (TE-24) and New Cut Dune and Marsh Restoration (TE-37) Projects (PDF)OM&M Report9/1/2020
2020 Monitoring Close-out Report for Isles Dernieres Restoration East Island (TE-20), Isles Dernieres Restoration Trinity Island (TE-24) and New Cut Dune and Marsh Restoration (TE-37) Projects (PDF)OM&M Report9/1/2020
2020 Monitoring Close-out Report for Isles Dernieres Restoration East Island (TE-20), Isles Dernieres Restoration Trinity Island (TE-24) and New Cut Dune and Marsh Restoration (TE-37) Projects (PDF)OM&M Report9/1/2020
2020 Operations, Maintenance, and Monitoring Report for Jonathan Davis Wetland Restoration (BA-20) (PDF)OM&M Report9/1/2020
East Delacroix Marsh Creation and Terracing (BS-37) Topographic, Bathymetric, Magnetometer Surveys, and Marsh Elevation Survey (PDF)SURVEY REPORT8/12/2020
East Delacroix Marsh Creation and Terracing (BS-37) Topographic, Bathymetric, Magnetometer Surveys, and Marsh Elevation Survey (PDF)SURVEY REPORT8/12/2020
Addendum No. 1 to Bid Documents for the Raccoon Island Restoration 2020 Vegetative Plantings Project (TE-48) (PDF)BID DOCUMENTS8/6/2020
2020 Operations, Maintenance and Monitoring Report for Oaks/Avery Canals Hydrologic Restoration (TV-13a) (PDF)OM&M Report8/1/2020
2020 Operations, Maintenance, and Monitoring Report for Raccoon Island Shoreline Protection/Marsh Creation (TE-48) (PDF)OM&M Report8/1/2020
Labranche Central Marsh Creation (PO-133) 95% Design Report (PDF)DESIGN REPORT8/1/2020
Bid Documents for Raccoon Island Vegetative Plantings (TE-48) (PDF)BID DOCUMENTS7/29/2020
Breton Landbridge Marsh Creation (West) (BS-38) Phase I Environmental Site Assessment and Hazardous, Toxic, and Radioactive Waste Assessment (HTRW) Report (PDF)CONTRACTED STUDY7/28/2020
East Leeville Marsh Creation and Nourishment (BA-194) 95% Design Report (PDF)DESIGN REPORT7/28/2020
Raccoon Island Restoration Project 2020 Vegetative Plantings Project (TE-48) (PDF)BID DOCUMENTS7/20/2020
East Delacroix Marsh Creation and Terracing (BS-37) Phase I Hazardous, Toxic, and Radioactive Waste (HTRW) Assessment Report (PDF)CONTRACTED STUDY7/15/2020
Topographic and Bathymetric Analysis: Cheniere Ronquille (BA-0076) Shell Island West (BA-0111) (PDF)SURVEY REPORT7/12/2020
East Leeville Marsh Creation and Nourishment (BA-194) 95% Design Drawings (PDF)DESIGN REPORT7/1/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
Goose Point/Point Platte and Bayou Bonfouca Marsh Creation Maintenance Project Bid Documents (PDF)BID DOCUMENTS6/24/2020
2019 Operations, Maintenance,and Monitoring Closeout Report for Fritchie Marsh Restoration (PO-06) (PDF)OM&M Report6/18/2020
Lost Lake MCA 3 Vegetative Plantings Project (PDF)BID DOCUMENTS6/17/2020
Lost Lake MCA 3 Vegetative Plantings Project (PDF)BID DOCUMENTS6/17/2020
Lost Lake MCA 3 Vegetative Plantings Project (PDF)BID DOCUMENTS6/17/2020
Lost Lake MCA 3 Vegetative Plantings Project (PDF)BID DOCUMENTS6/17/2020
Cameron Meadows Marsh Creation and Terracing (CS-66) Coastal Zone Consistency Permit (PDF)PERMITS6/12/2020
2020 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration (TV-14) (PDF)OM&M Report6/1/2020
2020 Operations, Maintenance, and Monitoring Report for Freshwater Introduction South of Highway 82 (ME-0016) (PDF)OM&M Report6/1/2020
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF)General Programmatic Document5/20/2020
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF)General Programmatic Document5/20/2020
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF)General Programmatic Document5/20/2020
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020 (PDF)General Programmatic Document5/20/2020
Biological Oyster Assessment for Breton Landbridge Marsh Creation (West) (BS-38) (PDF)CONTRACTED STUDY5/15/2020
Bayou Bonfouca Marsh Creation Project (PO-104) Project Completion Report (PDF)Project Completion Report5/11/2020
East Leeville Marsh Creation and Nourishment (BA-194) Geotechnical Engineering Report Revision 1 (PDF)GEOTECHNICAL REPORT5/8/2020
Survey Report TE-0026 Lake Chapeau Structure # 3 Demolition at Point Au Fer (PDF)SURVEY REPORT5/7/2020
Bayou Decade Ridge Restoration and Marsh Creation As-Built Drawings (TE-0138) (PDF)AS-BUILT5/1/2020
BS-42 General Project Fact Sheet (PDF)General Project Fact Sheet4/30/2020
BS-42 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/30/2020
TE-157 General Project Fact Sheet (PDF)General Project Fact Sheet4/30/2020
TE-157 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/30/2020
Breton Landbridge Marsh Creation (West) (BS-38) Nationwide Permit Summary (PDF)PERMITS4/22/2020
BS-41 General Project Fact Sheet (PDF)General Project Fact Sheet4/6/2020
BS-41 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/6/2020
TE-156 General Project Fact Sheet (PDF)General Project Fact Sheet4/6/2020
TE-156 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/6/2020
Breton Landbridge Marsh Creation (West) (BS-38) Geotech Permit (PDF)PERMITS4/1/2020
Monitoring Plan for Grand Liard Marsh and Ridge Restoration (BA-0068) (PDF)OMM Plan3/31/2020
East Leeville Marsh Creation and Nourishment Geotechnical Data Report Addendum 1 Revision 1 (PDF)GEOTECHNICAL REPORT3/17/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Grand Liard Marsh and Ridge Restoration Vegetative Plantings (PDF)BID DOCUMENTS3/10/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
Cameron Meadows Marsh Creation and Terracing Bid Documents (PDF)BID DOCUMENTS2/20/2020
East Delacroix Marsh Creation and Terracing (BS-37) Coastal Use Permit (PDF)PERMITS1/27/2020
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) 95% Design Drawings (PDF)DESIGN REPORT1/2/2020
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) 95% Design Report (PDF)DESIGN REPORT1/1/2020
2019 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF)Inspection Report1/1/2020
2019 Annual Inspection Report for Bayou Bonfouca Marsh Creation Project (PO-0104) (PDF)Inspection Report1/1/2020
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and Results (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Maps (PDF)DATA COLLECTION12/15/2019
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF)BID DOCUMENTS12/11/2019
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF)BID DOCUMENTS12/11/2019
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF)BID DOCUMENTS12/11/2019
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF)BID DOCUMENTS12/11/2019
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF)BID DOCUMENTS12/11/2019
Terrebonne Bay Shore Protection Demonstration Features Removal Bid Package (PDF)BID DOCUMENTS12/11/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
BA-171 Landrights Documents (PDF)LANDRIGHTS12/10/2019
East Leeville Marsh Creation and Nourishment (BA-194) Coastal Use Permit (PDF)PERMITS12/4/2019
East Leeville Marsh Creation and Nourishment (BA-194) Programmatic General Permit (PDF)PERMITS12/3/2019
Survey Methodology Report for Raccoon Island Shoreline Protection/Marsh Creation (TE-48) Project (PDF)SURVEY REPORT11/21/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid Package (PDF)BID DOCUMENTS11/12/2019
2019 Operations, Maintenance, and Monitoring Report for Highway 384 Hydrologic Restoration (CS-21) (PDF)OM&M Report11/1/2019
2019 Operations, Maintenance, and Monitoring Report for Lake Portage Land Bridge Project (TV-0017) (PDF)OM&M Report11/1/2019
2019 Operations, Maintenance, and Monitoring Report for Humble Canal Hydrologic Restoration (ME-11) (PDF)OM&M Report11/1/2019
BA-171 Annex B Monument Data Sheet (PDF)BID DOCUMENTS10/31/2019
Oyster Bayou Marsh Creation and Terracing Project Completion Report (PDF)Project Completion Report10/24/2019
TE-0117 Island Road Marsh Creation and Nourishment Project 30% Design Report (PDF)DESIGN REPORT10/7/2019
TE-0117 Island Road Marsh Creation and Nourishment Project 30% Design Report (PDF)DESIGN REPORT10/7/2019
TE-0117 Island Road Marsh Creation and Nourishment Project 30% Design Report (PDF)DESIGN REPORT10/7/2019
Cameron Creole Grand Bayou Marsh Creation (CS-54) CWPPRA Project FWS Construction Outreach Report (PDF)Project Report10/7/2019
PO-104 Bayou Bonfouca Marsh Creation FWS Cwppra Outreach Report (PDF)Project Report10/7/2019
TE-72 Lost Lake Marsh Creation and Hydrologic Restoration CWPPRA Project FWS Outreach Report (PDF)Project Report10/7/2019
2019 Operations, Maintenance, and Monitoring Report for Delta Management at Fort St. Philip (BS-11) (PDF)OM&M Report10/7/2019
Water Quality Modeling of Proposed River Reintroduction Into Maurepas Swamp (PO-0029) (PDF)CONTRACTED STUDY10/3/2019
Water Quality Modeling of Proposed River Reintroduction Into Maurepas Swamp (PO-0029) (PDF)CONTRACTED STUDY10/3/2019
BA-171 Final Permit Mod 9-26-2019 (PDF)PERMITS9/26/2019
East Leeville Marsh Creation and Nourishment Project (BA-194) Near Leeville Final Survey Report (PDF)SURVEY REPORT9/24/2019
East Delacroix Marsh Creation and Terracing (BS-37) Permits (PDF)PERMITS9/16/2019
East Delacroix Marsh Creation and Terracing (BS-37) Permits (PDF)PERMITS9/16/2019
East Delacroix Marsh Creation and Terracing (BS-37) Geotech Permit (PDF)PERMITS9/16/2019
2019 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF)Inspection Report9/1/2019
BA-171 Finding of No Significant Impact and Final Supplement to the Environmental Assessment (PDF)Environmental Assessment8/26/2019
2019 Annual Inspection Report for Delta Management at Fort St. Philip (BS-11) (PDF)Inspection Report8/23/2019
2019 Monitoring Plan for Cole's Bayou Marsh Restoration (PDF)OMM Plan8/1/2019
Labranche Central Marsh Creation (PO-133) 95% Design Drawings (PDF)DESIGN REPORT8/1/2019
Monitoring Plan for Oyster Bayou Marsh Restoration (CS-0059) (PDF)OMM Plan8/1/2019
BA-171 Appendix A Combined (PDF)Environmental Assessment7/8/2019
BA-171 Appendix B Finding of No Significant Impact and Final Environmental Assessment (PDF)Environmental Assessment7/8/2019
Coastwide Nutria Control Program 2018-2019 Nutria Harvest and Distribution 2018-2019 and A Survey of Nutria Herbivory Damage in Coastal Louisiana 2019 (PDF)OM&M Report7/1/2019
BA-171 Coastal Use Permit (PDF)PERMITS6/25/2019
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF)PERMITS6/21/2019
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF)PERMITS6/21/2019
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF)PERMITS6/21/2019
Mid Breton Land Bridge Marsh Creation and Terracing (BS-32) Geotech Permits (PDF)PERMITS6/21/2019
BA-171 Final Permit 6-18-19 (PDF)PERMITS6/18/2019
BA-171 Final Supplement to the Environmental Assessment (PDF)Environmental Assessment6/5/2019
2019 Short Summary Report for East Sabine Lake Hydrologic Restoration (CS-32) (PDF)OM&M Report6/1/2019
State of Louisiana Coastal Protection and Restoration Authority of Louisiana General: Quality Assurance Project Plan (QAPP) (PDF)General Programmatic Document6/1/2019
Swamp Community Wetland Value Assessment. PO-0029 River Reintroduction into Maurepas Swamp. (PDF)Wetland Value Assessment6/1/2019
2018 Operations, Maintenance, and Monitoring Report for Delta Wide Crevasses (MR-09) (PDF)OM&M Report6/1/2019
2019 Short Summary Report for Sabine Refuge Marsh Creation Cycles - 3-4-5 (PDF)OM&M Report6/1/2019
2019 Short Summary Report for Sabine Refuge Marsh Creation Cycles - 3-4-5 (PDF)OM&M Report6/1/2019
BS-38 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
BS-38 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
BS-37 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
BS-37 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
BA-217 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
BA-217 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
CS-85 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
CS-85 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
2019 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF)Inspection Report5/7/2019
2019 Annual Inspection Report for Naomi Outfall Management (PDF)Inspection Report5/7/2019
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) Geotechnical Report Addendum #2 (PDF)GEOTECHNICAL REPORT5/3/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
2019 Operations, Maintenance, and Monitoring Final Report for Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island (PDF)OM&M Report4/1/2019
2018 Operations, Maintenance and Monitoring Report for Barataria Barrier Island Comples: Pelican Island and Pass La Mer to Chaland Pass Restoration (BA-0038) (PDF)OM&M Report4/1/2019
2019 Annual Inspection Report for Jonathan Davis Wetland Restoration Project (PDF)Inspection Report3/26/2019
Borrow Area Geotechnical Services. West Fourchon Marsh Creation and Nourishment Project (TE-134). Lafourche Parish, Louisiana. (PDF)GEOTECHNICAL REPORT3/13/2019
2018 Operations, Maintenance, and Monitoring Close-out Report for Brady Canal Hydrologic Restoration (TE-28) (PDF)OM&M Report3/1/2019
Cameron Meadows Marsh Creation and Terracing (CS-66) Programmatic General Permit (PDF)PERMITS2/27/2019
Lost Lake Marsh Creation and Hydrologic Restoration Project Completion Report (PDF)Project Completion Report2/26/2019
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) Geotechnical Addendum #1 (PDF)GEOTECHNICAL REPORT1/18/2019
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation)MEETING PRESENTATIONS AND MINUTES1/16/2019
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation)MEETING PRESENTATIONS AND MINUTES1/16/2019
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation)MEETING PRESENTATIONS AND MINUTES1/16/2019
BA-171 Water Quality Certification (PDF)PERMITS1/16/2019
Operation, Maintenance and Rehabilitation Plan for the Penchant Basin Natural Resource Plan, Increment 1 Project (TE-34) (PDF)OMM Plan1/8/2019
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
2018 Annual Inspection Report for Delta Wide Crevasses (MR-09) (PDF)Inspection Report12/5/2018
2018 Operations, Maintenance, and Monitoring Report for Bayou Chevee Shoreline Protection (PO-22) (PDF)OM&M Report12/1/2018
2018 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report11/19/2018
2018 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF)OM&M Report11/1/2018
East Mud Lake Hydrologic Restoration Project (CS-0020) Final Maintenance Bid Tabulation Sheet (PDF)BID DOCUMENTS10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF)DESIGN REPORT10/11/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF)DESIGN REPORT10/11/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF)DESIGN REPORT10/11/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF)DESIGN REPORT10/11/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 95% Design Report (PDF)DESIGN REPORT10/11/2018
TE-134 West Fourchon Marsh Creation Nourishment Project 95% Design Report (PDF)DESIGN REPORT10/10/2018
East Leeville Marsh Creation and Nourishment (BA-194) Geotechnical Data Report (PDF)GEOTECHNICAL REPORT10/8/2018
Bayou DeCade Marsh and Ridge Creation Geotechnical Data Report and Geotechnical Engineering Report (PDF)GEOTECHNICAL REPORT10/5/2018
Bayou DeCade Marsh and Ridge Creation Geotechnical Data Report and Geotechnical Engineering Report (PDF)GEOTECHNICAL REPORT10/5/2018
Project Completion Report: Lake Chapeau Sediment Input and Hydrologic Restoration (TE-26) (PDF)Project Completion Report10/1/2018
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF)RESEARCH PROJECT SUMMARY9/28/2018
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF)RESEARCH PROJECT SUMMARY9/28/2018
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF)RESEARCH PROJECT SUMMARY9/28/2018
Research Project Summary: Experimental and Computational Studies on the Reinforcement Effect of Smooth Cord Grass (Spartina alterniflora) on Erosion in Louisiana Coastal Marsh Creation Project (PDF)RESEARCH PROJECT SUMMARY9/28/2018
2018 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF)Inspection Report9/25/2018
East Mud Lake Hydrologic Restoration Project (CS-0020) Final Maintenance Bid Package (PDF)BID DOCUMENTS9/20/2018
Draft Design Report Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) (PDF)DESIGN REPORT9/20/2018
Draft Design Report Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) (PDF)DESIGN REPORT9/20/2018
Labranche East Marsh Creation (PO-75) 95% Design Drawings (PDF)DESIGN REPORT9/14/2018
Labranche East Marsh Creation (PO-75) 95% Design Report (PDF)DESIGN REPORT9/13/2018
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF)Project Completion Report9/10/2018
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF)Project Completion Report9/10/2018
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF)Project Completion Report9/10/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
TE-117 Borrow Area and Access Corridor Deliverable (Borrow Area Geophysical Survey) (PDF)SURVEY REPORT9/1/2018
Lake Chapeau (TE-26) 2018 Maintenance Project As-Built Drawings (PDF)AS-BUILT8/21/2018
Island Road Marsh Creation and Nourishment (TE-117) Phase II Final Geotechnical Engineering Report (Supplementary Marsh Creation Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT8/17/2018
2018 Annual Inspection Report North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report8/8/2018
2018 Operations, Maintenance, and Monitoring Close-Out Report for GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration (BA-02) (PDF)OM&M Report8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Topographic Survey in the Outfall Management Area of the Mississippi River Reintroduction into the Maurepas Swamp (PO-29) St. John the Baptist and St. James Parish, Louisiana (PDF)SURVEY REPORT7/18/2018
Project Completion Report for Hydrologic Restoration and Vegetative Plantings in the Des Allemands Swamp (BA-34-2) (PDF)Project Completion Report7/12/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
PO-0169 New Orleans Landbridge Shoreline Stabilization and Marsh Creation Project 30% Design Report (PDF)DESIGN REPORT7/10/2018
Little Lake BA-37 As-Built Drawings (Revised Perpendicular Rock Dike Alignment) (PDF)AS-BUILT7/2/2018
Project Completion Report for Little Lake Shoreline Protection and Marsh Creation Segment 1 & 2 Demolition and Perpendicular Rock Dike Construction (PDF)Project Completion Report7/1/2018
Project Completion Report: Raccoon Island Breakwater Rehabilitation Project (TE-48) (PDF)Project Completion Report7/1/2018
BA-171 Bid Package Environmental Documents (PDF)BID DOCUMENTS6/29/2018
2018 Operations, Maintenance, and Monitoring Report: Final Closeout Report for Non-rock Alternatives to Shoreline Protection Demonstration Project (PDF)OM&M Report6/27/2018
Coastwide Nutria Control Program 2017-2018 Nutria Harvest and Distribution 2017-2018 and A Survey of Nutria Herbivory Damage in Coastal Louisiana 2018 (PDF)OM&M Report6/22/2018
East Mud Lake Hydrologic Restoration Project (CS-0020) - Final Maintenance - Bid Tabulation Sheet (PDF)BID DOCUMENTS6/21/2018
Lake Chapeau Sediment Input and Hydrologic Restoration (TE-0026) 2018 Maintenance Event Bid Tabulation Sheet (PDF)BID DOCUMENTS6/7/2018
State of the Coast 2018: Assessing the Western Caminada-Moreau Headland's Shoreline, Elevational, Vegetative, and Avian response to Beach, Dune and Marsh Creation (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
2018 Operations, Maintenance, and Monitoring Report for Holly Beach Sand Management (CS-0031) (PDF)OM&M Report6/1/2018
2018 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration (PDF)OM&M Report6/1/2018
2018 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (TV-21) (PDF)OM&M Report6/1/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: NFWF Projects and Path Forward (PDF)MEETING PRESENTATION5/30/2018
Wave Monitoring Data Processing and Calculation of Wave Transmission Coefficients (PDF)DATA COLLECTION5/22/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) Bid Tabulation (PDF)BID DOCUMENTS5/17/2018
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF)BID DOCUMENTS5/10/2018
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF)BID DOCUMENTS5/10/2018
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF)BID DOCUMENTS5/10/2018
Geotechnical Engineering Report Caminada Headlands Back Barrier Marsh Creation Increment I (BA-171) Marsh Fill Settlement Re-Evaluation (PDF)GEOTECHNICAL REPORT5/10/2018
TE-48 Raccoon Island Breakwater Rehabilitation As-Built Drawings (PDF)AS-BUILT5/8/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Tabulation (PDF)BID DOCUMENTS5/3/2018
BA-206 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
CS-81 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
BS-32 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
PO-181 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
BA-206 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
CS-81 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
BS-32 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
PO-181 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
Raccoon Island Maintenance/Construction Feature Removal Project (TE-48) Project Completion Report (PDF)Project Completion Report5/1/2018
Island Road (TE-117) Geotechnical Investigation Data Report Addendum 1 (Borrow Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT4/24/2018
Final Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-0193) (PDF)DATA COLLECTION4/18/2018
Final Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-0193) (PDF)DATA COLLECTION4/18/2018
TE-48 Raccoon Island Feature Removal As-Built Drawings (PDF)AS-BUILT4/17/2018
Mandatory Pre -Bid Conference for the Cole’s Bayou Marsh Restoration Project (TV-0063) (PDF)MEETING PRESENTATION4/12/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF)BID DOCUMENTS4/11/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF)BID DOCUMENTS4/11/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF)BID DOCUMENTS4/11/2018
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF)SURVEY REPORT4/10/2018
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF)SURVEY REPORT4/10/2018
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF)SURVEY REPORT4/10/2018
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF)SURVEY REPORT4/10/2018
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF)SURVEY REPORT4/10/2018
Bayou DeCade Ridge Restoration and Marsh Creation Design Survey Report (PDF)SURVEY REPORT4/10/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
2018 Operations, Maintenance, and Monitoring Closeout Report for Atchafalaya Sediment Delivery (AT-02) (PDF)OM&M Report4/1/2018
2018 Operations, Maintenance, and Monitoring Closeout Report for Big Island Mining (AT-03) (PDF)OM&M Report4/1/2018
River Reintroduction into Maurepas Swamp Public Meeting March 26, 2018 (PDF)MEETING PRESENTATION3/26/2018
River Reintroduction into Maurepas Swamp Frequently Asked Questions (PDF)General Programmatic Document3/26/2018
River Reintroduction into Maurepas Swamp (PO-0029) Project Overview (PDF)General Programmatic Document3/26/2018
2017 Annual Inspection Report for Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF)Inspection Report3/23/2018
2017 Annual Inspection Report for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF)Inspection Report3/23/2018
2017 Annual Inspection Report for Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)Inspection Report3/22/2018
2017 Annual Inspection Report for Bayou Sauvage Refuge Restoration Phase I (PDF)Inspection Report3/21/2018
2017 Annual Inspection Report for Grand Liard Marsh and Ridge Restoration (BA-68) (PDF)Inspection Report3/21/2018
2017 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF)Inspection Report3/21/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
2017 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF)Inspection Report3/14/2018
2017 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF)Inspection Report3/12/2018
Labranche East Marsh Creation (PO-75) 30% Design Report (PDF)DESIGN REPORT3/12/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Bid Tabulation Sheet (PDF)BID DOCUMENTS3/6/2018
Labranche East Marsh Creation (PO-75) 30% Design Drawings (PDF)DESIGN REPORT3/2/2018
Survey Report BA-0038-1 Pelican Island (PDF)SURVEY REPORT2/28/2018
Survey Report BA-0076 NRDA Chenier Ronquille (PDF)SURVEY REPORT2/28/2018
Survey Report BA-0040 Scofield Island (PDF)REFERENCE LITERATURE2/28/2018
A Standard Operating Procedures Manual for The Coastwide Reference Monitoring System-Wetlands: Methods for Site Establishment, Data Collection, and Quality Assurance/Quality Control. (PDF)General Programmatic Document2/21/2018
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp As Built (PDF)AS-BUILT2/18/2018
Final Geotechnical Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) Offshore Borrow Investigation (PDF)GEOTECHNICAL REPORT2/15/2018
Final Geotechnical Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) Offshore Borrow Investigation (PDF)GEOTECHNICAL REPORT2/15/2018
Barataria Bay Rim Marsh Creation and Nourishment (BA-195) Geotechnical Services Report (PDF)GEOTECHNICAL REPORT2/14/2018
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp Project (BA-34-2) As-Built Survey Report (PDF)AS-BUILT2/5/2018
Monitoring Plan for Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing (BA-0164) (PDF)OMM Plan2/1/2018
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Tabulation Sheet (PDF)BID DOCUMENTS1/10/2018
Project Completion Report for the GIWW to Clovelly Restoration (BA-02) 2015 Maintenance Project (PDF)Project Completion Report1/5/2018
2017 Operations, Maintenance, and Monitoring Report for Channel Armor Gap Crevasse (MR-06) (PDF)OM&M Report1/1/2018
Final Report Senate Resolution No. 154 of the 2017 Regular Session (PDF)CONTRACTED STUDY1/1/2018
Final Report Senate Resolution No. 154 of the 2017 Regular Session (PDF)CONTRACTED STUDY1/1/2018
2017 Annal Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report12/4/2017
Coastal Protection and Restoration Authority of Louisiana (CPRA) 2017 Operations, Maintenance, and Monitoring Report: Final Closeout Report for Bio-engineered Oyster Reef Demonstration Project (LA-0008) (PDF)OM&M Report12/1/2017
2017 Operations, Maintenance, and Monitoring Report for Dedicated Dredging on the Barataria Basin Landbridge (BA-36) (PDF)OM&M Report12/1/2017
2017 Operations, Maintenance, and Monitoring Report for Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2 (PO-18) (PDF)OM&M Report12/1/2017
2017 Annual Inspection Report for South Shore of the Pen Shoreline Protection and Marsh Creation (PDF)Inspection Report11/15/2017
Operation, Maintenance and Rehabilitation Plan for the New Cut Dune and Marsh Restoration Project (TE-37) (PDF)OMM Plan11/14/2017
Operation, Maintenance and Rehabilitation Plan for the Whiskey Island Back Barrier Island Marsh Creation Project (TE-50) (PDF)OMM Plan11/13/2017
2017 Annual Inspection Report for Fritchie Marsh Restoration (PDF)Inspection Report11/9/2017
2017 Annual Inspection Report for Naomi Outfall Management (PDF)Inspection Report11/9/2017
2017 Annual Inspection Report for Barataria Bay Waterway East Shoreline Protection (PDF)Inspection Report11/7/2017
2017 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF)Inspection Report11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
2017 Annual Inspection Report for Caernarvon Outfall Management (BS-03a) (PDF)Inspection Report11/1/2017
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report10/31/2017
2017 Annual Inspection Report for Little Lake Shoreline Protection/Dedicated Dredging near Round Lake (BA-37) (PDF)Inspection Report10/31/2017
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report10/31/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Governor's Advisory Commission Diversion Sub-Committee October 3, 2017 River Reintroduction Into Maurepas Swamp (PDF)MEETING PRESENTATION10/3/2017
2017 Operations, Maintenance, and Monitoring Report for Perry Ridge Shore Protection (PDF)OM&M Report10/1/2017
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS10/1/2017
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS10/1/2017
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS10/1/2017
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF)Inspection Report9/7/2017
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF)Inspection Report9/7/2017
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF)Inspection Report9/7/2017
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake (BA-37) (PDF)OM&M Report9/1/2017
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for Coastwide Vegetative Planting Project (LA-0039) (PDF)OM&M Report9/1/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
2017 Annual Inspection Report for Mississippi Sediment Delivery System - Bayou Dupont (PDF)Inspection Report8/8/2017
East Leeville Marsh Creation and Nourishment (BA-194) Feasibility Study Technical Report (PDF)FEASIBILITY REPORTS8/7/2017
2016 Annual Inspection Report for Mississippi Sediment Delivery System – Bayou Dupont (PDF)Inspection Report8/2/2017
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-0052) (PDF)OM&M Report8/1/2017
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Bayou Dupont Marsh and Ridge Creation (BA-0048) (PDF)OMM Plan8/1/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
2017 Annual Inspection Report for GIWW Bank Restoration Project - Segment 4 (TE-43) (PDF)Inspection Report7/13/2017
2017 Annual Inspection Report for Penchant Basin Natural Resource Plan, Increment No. 1 (TE-34) (PDF)Inspection Report7/12/2017
2017 Annual Inspection Report for South Lake Decade Freshwater Introduction Project (TE-39) (PDF)Inspection Report7/12/2017
Oyster Bayou Handout (PDF)FACT SHEET7/12/2017
2017 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report7/11/2017
Decommission of Data Collection Platforms for LA-0016 Non-Rock Alternatives Shoreline Protection Demonstration Project (PDF)General Programmatic Document7/1/2017
2016 Operations, Maintenance, and Monitoring Report for West Bay Sediment Diversion (MR-03) (PDF)OM&M Report7/1/2017
Coastwide Nutria Control Program 2016-2017 Nutria Harvest and Distribution 2016-2017 and A Survey of Nutria Herbivory Damage in Coastal Louisiana 2017 (PDF)OM&M Report6/16/2017
2016/2017 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-2) Permanent Pipeline (PDF)Inspection Report6/15/2017
2016-2017 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-4&5) (PDF)Inspection Report6/15/2017
CS-66 Environmental Assessment 2017 (PDF)Environmental Assessment6/7/2017
Performance measures for a Mississippi River reintroduction into the forested wetlands of Maurepas Swamp (PDF)CONTRACTED STUDY6/1/2017
Survey Methodology Report Topographic and Magnetometer Surveys of the Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) (PDF)SURVEY REPORT6/1/2017
Survey Methodology Report Topographic and Magnetometer Surveys of the Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) (PDF)SURVEY REPORT6/1/2017
2017 Operations, Maintenance, and Monitoring Report for Cote Blanche Hydrologic Restoration (TV-04) (PDF)OM&M Report6/1/2017
Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) Topographic, Bathymetric, and Magnetometer Surveys February - April 2017 (PDF)SURVEY REPORT5/31/2017
Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) Topographic, Bathymetric, and Magnetometer Surveys February - April 2017 (PDF)SURVEY REPORT5/31/2017
Labranche East Marsh Creation (PO-75) Geotechnical Report (PDF)GEOTECHNICAL REPORT5/26/2017
2016/2017 Annual Inspection Report for East Marsh Island Marsh Creation Project (TV-21) (PDF)Inspection Report5/16/2017
Monitoring Plan for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) (PDF)OMM Plan5/8/2017
Coastal Protection and Restoration Authority 2017 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (BA-0002) (PDF)Inspection Report5/1/2017
(TE-43) Bank Restoration of Critical Areas - Segment No. 4, (EB-10) GIWW Breach Closure Project - Segment No. 6, and (TE-34) Penchant Basin Natural Resource Plan - Increment 1 Data Collection Report (PDF)DATA COLLECTION4/4/2017
(TE-43) Bank Restoration of Critical Areas - Segment No. 4, (EB-10) GIWW Breach Closure Project - Segment No. 6, and (TE-34) Penchant Basin Natural Resource Plan - Increment 1 Data Collection Report (PDF)DATA COLLECTION4/4/2017
2016/2017 Annual Inspection Report for Hwy 384 Hydrologic Restoration Project (CS-21) (PDF)Inspection Report3/23/2017
2015 Annual Inspection Report for Delta Wide Crevasses (MR-0009) (PDF)Inspection Report3/21/2017
State of Louisiana Coastal Protection and Restoration Authority Topographic and Bathymetric Survey of the West Belle Pass Barrier Headland Restoration (TE-0052) Project Lafourche Parish, Louisiana (PDF)SURVEY REPORT3/9/2017
2016/2017 Annual Inspection Report for Black Bayou Culverts Hydrologic Restoration Project (CS-29) (PDF)Inspection Report3/7/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
LA-284 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
LA-284 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
PO-179 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
PO-179 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
PO-178 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
PO-178 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
TE-138 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
TE-138 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
LA Outer Coast Monitoring Plan_Original_2017 (PDF)OMM Plan2/6/2017
Island Road Marsh Creation/Nourishment (TE-117) Geotechnical Investigation Data Report (Supplementary Marsh Creation Area Phase II Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT2/1/2017
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (BA-35) (PDF)OM&M Report2/1/2017
West Belle Pass Barrier Headland Restoration Vegetative Planting (PDF)BID DOCUMENTS1/19/2017
BA-37 Survey Data - Bathymetric Data (PDF)SURVEY REPORT1/19/2017
Marsh Creation Area Grid Survey & Rock Dike Jetty Creation Survey Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake Project BA-37 Lafourche Parish, Louisiana (PDF)SURVEY REPORT1/19/2017
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration (BA-68) Project Completion Report - Final (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Little Lake Shoreline Protection/Dedicataed Dredging Near Round Lake Project BA-37 Lafourche Parish, Louisiana Marsh Creation Area Grid Survey & Rock Dike Jetty Creation Survey (PDF)SURVEY REPORT12/14/2016
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System-Bayou Dupont (BA-0039) (PDF)OM&M Report12/1/2016
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1 (PO-16) (PDF)OM&M Report11/1/2016
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Notice of Award (PDF)BID DOCUMENTS11/1/2016
PO-104 Bayou Bounfouca Aerial Photos (PDF)DESIGN REPORT10/19/2016
Caminada Headland Back Barrier Marsh Creation Project 95% Design Report (PDF)DESIGN REPORT10/14/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Tabulation Sheet (PDF)BID DOCUMENTS10/13/2016
Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing Bid Tabulation Sheet (PDF)BID DOCUMENTS10/6/2016
Northwest Turtle Bay Marsh Creation 95% Design Report (PDF)DESIGN REPORT10/1/2016
Section 4 Survey Drawings (PDF)SURVEY REPORT9/30/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Oyster Bayou Marsh Creation and Terracing Bid Tabulation Sheet (PDF)BID DOCUMENTS9/9/2016
2016 Annual Inspection Report for Delta Management at Fort St. Philip (BS-0011) (PDF)Inspection Report9/9/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
2016 Operations, Maintenance and Monitoring Report for Oaks/Avery Canals Hydrologic Restoration (PDF)OM&M Report8/1/2016
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Caernarvon Diversion Outfall Management (BS-03a) (PDF)OM&M Report7/28/2016
2016 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF)Inspection Report7/28/2016
2016 Annual Inspection Report for Lake Chapeau Sediment Input and Hydrologic Restoration Project (PDF)Inspection Report7/25/2016
2016 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF)Inspection Report7/20/2016
2016 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF)Inspection Report7/15/2016
PO-0104 Notice to Proceed (PDF)BID DOCUMENTS7/15/2016
2016/2017 Annual Inspection Report for East Sabine Lake Hydrologic Restoration Project (CS-32) (PDF)Inspection Report7/14/2016
2016 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF)Inspection Report7/11/2016
2016 Annual Inspection Report for South Shore of the Pen Shoreline Protection and Marsh Creation (PDF)Inspection Report7/11/2016
Monitoring Plan for Hydrologic Restoration and Vegetative Planting in the Lac des Allemands Swamp (BA-34-2) (PDF)OMM Plan7/1/2016
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Lake Hermitage Marsh Creation (BA-42) (PDF)OMM Plan7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Cameron - Creole Watershed Grand Bayou Marsh Creation (CS-0054) (PDF)OMM Plan7/1/2016
2016 Annual Inspection Report for CAERNARVON OUTFALL MANAGEMENT (BS-03a) (PDF)Inspection Report7/1/2016
PO-104 Bayou Bonfouca Notice of Award (PDF)BID DOCUMENTS6/27/2016
Coastwide Vegetative Planting - East Grand Terre Project -Addendum 1 (PDF)BID DOCUMENTS6/27/2016
2015/2016 Annual Inspection Report for Sabine Refuge Marsh Creation Project (PDF)Inspection Report6/22/2016
2015/2016 Annual Inspection Report for Lake Portage Land Bridge Project (PDF)Inspection Report6/16/2016
2016 Annual Inspection Report for Barataria Bay Waterway East Shoreline Protection (PDF)Inspection Report6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF)Inspection Report6/14/2016
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF)Inspection Report6/14/2016
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF)Inspection Report6/14/2016
2016 Annual Inspection Report for Naomi Outfall Management (PDF)Inspection Report6/9/2016
Coastwide Nutria Control Program 2015-2016 Nutria Harvest and Distribution 2015-2016 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2016 (PDF)OM&M Report6/7/2016
Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)SURVEY REPORT6/3/2016
Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)SURVEY REPORT6/3/2016
State of Louisiana Coastal Protection and Restoration Authority Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)CONTRACTED STUDY6/3/2016
State of Louisiana Coastal Protection and Restoration Authority Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)CONTRACTED STUDY6/3/2016
2016 Operations, Maintenance, and Monitoring Report for Humble Canal Hydrologic Restoration (PDF)OM&M Report6/1/2016
2016 Operations, Maintenance, and Monitoring Report for GIWW - Perry Ridge West Bank Stabilization (PDF)OM&M Report6/1/2016
2016 Operations, Maintenance, and Monitoring Report for Little Vermilion Bay Sediment Trapping (PDF)OM&M Report6/1/2016
2016 Operations, Maintenance, and Monitoring Report for West Belle Pass Headland Restoration (TE-23) (PDF)OM&M Report6/1/2016
2016 Annual Inspection Report for Fritchie Marsh Restoration (PDF)Inspection Report5/31/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Bayou Bonfouca Marsh Creation Addendum 4 (PDF)BID DOCUMENTS5/23/2016
2016 Annual Inspection Report for Little Lake Shoreline Protection/ Dedicated Dredging Near Round Lake (BA-37) (PDF)Inspection Report5/19/2016
Bayou Bonfouca Marsh Creation Addendum 2 (PDF)BID DOCUMENTS5/17/2016
Bayou Bonfouca Marsh Creation Addendum 3 (PDF)BID DOCUMENTS5/16/2016
PO-0104 Pre-bid Attendance Record (PDF)BID DOCUMENTS5/16/2016
Bayou Bonfouca Marsh Creation Addendum 1 (PDF)BID DOCUMENTS5/13/2016
Black Bayou Culverts Bid Instructions (PDF)BID DOCUMENTS5/12/2016
Black Bayou Culverts Bid Terms and Conditions - Attachment A (PDF)BID DOCUMENTS5/12/2016
Black Bayou Culverts Hydrologic Restoration Bid Specifications - Attachment B (PDF)BID DOCUMENTS5/8/2016
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF)BID DOCUMENTS5/8/2016
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF)BID DOCUMENTS5/8/2016
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF)BID DOCUMENTS5/8/2016
2015/2016 Annual Inspection Report for Sediment Trapping At The Jaws Project (PDF)Inspection Report5/5/2016
2016 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (PDF)Inspection Report5/3/2016
2016 Annual Inspection Report for Goose Point/Point Platte Marsh Creation Project (PDF)Inspection Report4/28/2016
2016 Annual Inspection Report for South Lake Decade Freshwater Introduction Project (TE-39) (PDF)Inspection Report4/27/2016
Island Road Marsh Creation and Nourishment Project No. (TE-117) Data Collection Report (PDF)DATA COLLECTION4/27/2016
2016 Annual Inspection Report for Raccoon Island Shoreline Protection/ Marsh Creation Project and Raccoon Island Breakwater Demonstration Project (PDF)Inspection Report4/26/2016
2016 Annual Inspection Report for Raccoon Island Shoreline Protection/ Marsh Creation Project and Raccoon Island Breakwater Demonstration Project (PDF)Inspection Report4/26/2016
2015/2016 Annual Inspection Report for Four Mile Canal Terracing and Sediment Trapping Project (PDF)Inspection Report4/21/2016
2016 Annual Inspection Report for West Lake Boudreaux Shoreline Protection and Marsh Creation Project (TE-46) (PDF)Inspection Report4/15/2016
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF)BID DOCUMENTS4/5/2016
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF)BID DOCUMENTS4/5/2016
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF)BID DOCUMENTS4/5/2016
Coastwide Vegetative Planting - East Grand Terre Project Plans (PDF)BID DOCUMENTS4/1/2016
Coastwide Vegetative Planting East Grant Terre Project Specifications (PDF)BID DOCUMENTS4/1/2016
2015/2016 Annual Inspection Report for Freshwater Bayou Wetlands Project (PDF)Inspection Report3/4/2016
2015 Annual Inspection Report Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF)Inspection Report3/2/2016
Appendix C: Geotechnical Investigation Data Report Caminada Headlands Back Barrier Marsh Creation Project (PDF)GEOTECHNICAL REPORT3/1/2016
Bayou Bonfouca Louisiana Uniform Public Work Bid Forms (PDF)BID DOCUMENTS2/29/2016
Island Road Marsh Creation and Nourishment Project (TE-117) Final Plan Set (PDF)DESIGN REPORT2/29/2016
Bayou Bonfouca Marsh Creation Plan Set with Seal (PDF)BID DOCUMENTS2/29/2016
Bayou Bonfouca Marsh Creation Bid Specifications with Seal (PDF)BID DOCUMENTS2/29/2016
Lost Lake Marsh Creation and Hydrologic Restoration Louisiana Department of Wildlife and Fisheries Fill Material License WLF201626 (PDF)PERMITS2/15/2016
South Grand Chenier Marsh Creation Design Report February 2016 (PDF)DESIGN REPORT2/1/2016
2016 Operations, Maintenance and Monitoring Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island GUlly (PDF)OM&M Report2/1/2016
Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Clear Marais Shoreline Protection (CS-0022) (PDF)OM&M Report2/1/2016
BA-37 Survey Report Segment 2 (PDF)SURVEY REPORT2/1/2016
BA-37 Survey Report Segment 1 (PDF)SURVEY REPORT2/1/2016
No Name Bayou Marsh Creation U S Army Corps of Engineers Permit MVN 2015-2171 WB (PDF)PERMITS1/21/2016
West Bay 2015 Depth Analysis Process Report (PDF)SURVEY REPORT1/1/2016
CONTROLS ON THE SUCCESSFUL USE OF DREDGED SEDIMENTS FOR THE RESTORATION AND REHABILITATION OF BRACKISH MARSHES ON THE BARATARIA BASIN LANDBRIDGE (PDF)CONTRACTED STUDY12/31/2015
2015/2016 Annual Inspection Report for Freshwater Introduction South of Highway 82 Project (PDF)Inspection Report11/5/2015
South Shore of the Pen Shoreline Protection and Marsh Creation Operation, Maintenance, and Rehabilitation Plan (PDF)OMM Plan11/4/2015
TE-28 2015 Annual Inspection Report (PDF)Inspection Report11/4/2015
Coastal Zone Consistency Soil Borings No Name Bayou Marsh Creation (PDF)PERMITS11/3/2015
2015 Operations, Maintenance, and Monitoring Report for Terrebonne Bay Shore Protection Demonstration (TE-0045) (PDF)OM&M Report11/1/2015
Operation, Maintenance and Rehabilitation Plan for the GIWW Bank Restoration of Critical Areas - Segment No. 4 (TE-43) (PDF)OMM Plan11/1/2015
2015/2016 Annual Inspection Report for Cote Blanche Hydrologic Restoration Project (PDF)Inspection Report10/19/2015
Coastal Protection and Restoration Authority 2015 Short Summary Report for Highway 384 Hydrologic Restoration (CS-0021) (PDF)DATA COLLECTION10/15/2015
Bayou Bonfouca Marsh Creation 95% Design Report (PDF)DESIGN REPORT10/15/2015
2015 Operations, Maintenance, and Monitoring Report for East Mud Lake Marsh Management CS-20 (PDF)OM&M Report10/1/2015
TE-48 and TE-29 2015 Annual Inspection Report (PDF)Inspection Report10/1/2015
TE-48 and TE-29 2015 Annual Inspection Report (PDF)Inspection Report10/1/2015
BA-37 2015 Annual Inspection Report (PDF)Inspection Report10/1/2015
CS-20 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2015
2015 Annual Inspection Report for Lake Chapeau Sediment Input and Hydrologic Restoration Project (PDF)Inspection Report9/28/2015
TE-43 2015 Annual Inspection Report (PDF)Inspection Report9/21/2015
2015 Annual Inspection Report for Barataria Landbridge (PDF)Inspection Report9/10/2015
2015 Annual Inspection Report for Barataria Landbridge (PDF)Inspection Report9/10/2015
2015 Annual Inspection Report for Barataria Landbridge (PDF)Inspection Report9/10/2015
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for South Lake Lery Shoreline and Marsh Restoration BS-0016 (PDF)OMM Plan9/1/2015
TE-22 2015 Annual Inspection Report (PDF)Inspection Report8/28/2015
TE-34 2015 Annual Inspection Report (PDF)Inspection Report8/28/2015
BA-23 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
BA-26 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
BA-02 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
AT-02 2015 Inspection Report (PDF)Inspection Report8/24/2015
BA-03c 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
TV-17 2014/2015 Annual Inspection Report (PDF)Inspection Report8/20/2015
2014/2015 Annual Inspection Report for Lake Portage Land Bridge Project (TV-0017) (PDF)Inspection Report8/20/2015
2015 Operations, Maintenance, and Monitoring Report for Bayou Chevee Shoreline Protection (PO-22) (PDF)OM&M Report8/10/2015
2015 Annual Inspection Report for HOPEDALE HYDROLOGIC RESTORATION (PO-24) (PDF)Inspection Report8/10/2015
2015 Annual Inspection Report for BAYOU CHEVEE SHORELINE PROTECTION (PO-22) (PDF)Inspection Report8/7/2015
Section 2 Survey Field Notes (PDF)SURVEY REPORT8/7/2015
Section 3 Survey Point Data (PDF)SURVEY REPORT8/7/2015
Annex C Nomogram (PDF)SURVEY REPORT8/7/2015
TE-52 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2015
2015 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-52) (PDF)OM&M Report8/1/2015
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Royal Engineers (PDF)Project Completion Report7/27/2015
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Jansen, Inc. (PDF)Project Completion Report7/27/2015
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Living Shoreline Solutions, Inc. (PDF)Project Completion Report7/27/2015
Cameron Meadows Marsh Creation and Terracing (CS-66) Geotechnical Data Report (PDF)GEOTECHNICAL REPORT7/27/2015
Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Engineering Services (Exploratory Marsh Creation Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT7/17/2015
Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Data Report (Exploratory Marsh Creation Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT7/15/2015
2015 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF)Inspection Report7/7/2015
Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report (PDF)SURVEY REPORT7/6/2015
2015 Annual Inspection Report for South Shore of The Pen Shoreline Protection and Marsh Creation (PDF)Inspection Report7/1/2015
Coastwide Nutria Control Program 2014-2015 Nutria Harvest and Distribution 2014-2015 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2015 (PDF)OM&M Report6/30/2015
2014/2015 Annual Inspection Report for Pecan Island Terracing Project (ME-0014) (PDF)Inspection Report6/30/2015
ME-14 2014/2015 Annual Inspection Report (PDF)Inspection Report6/30/2015
PO-06 2015 Annual Inspection Report (PDF)Inspection Report6/29/2015
TV-14 2014/2015 Annual Inspection Report Report (PDF)Inspection Report6/25/2015
2014/2015 Annual Inspection Report for Marsh Island Hydrologic Restoration Project (TV-0014) (PDF)Inspection Report6/25/2015
2014/2015 Annual Inspection Report for Four Mile Canal Terracing and Sediment Trapping Project TV-0018 (PDF)Inspection Report6/24/2015
TV-18 2014/2015 Annual Inspection Report (PDF)Inspection Report6/24/2015
Coastal Use Permit/Consistency Determination Oyster Bayou Marsh Creation and Terracing (PDF)PERMITS6/10/2015
CS-28-2 2014/2015 Annual Inspection Report (PDF)Inspection Report6/8/2015
2014/2015 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-0028-2) (PDF)Inspection Report6/8/2015
BS-11 2015 Annual Inspection Report (PDF)Inspection Report6/2/2015
PO-33 2015 Annual Inspection Report (PDF)Inspection Report6/2/2015
CS-59 Environmental Assessment (PDF)Environmental Assessment6/1/2015
2015 Operations, Maintenance, and Monitoring Report for Vermilion River Cutoff Bank Protection (PDF)OM&M Report6/1/2015
2015 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF)OM&M Report6/1/2015
2015 Operations, Maintenance, and Monitoring Report for East Sabine Lake Hydrologic Restoration (PDF)OM&M Report6/1/2015
2015 Operations, Maintenance, and Monitoring Report for Freshwater Introduction South of Highway 82 (PDF)OM&M Report6/1/2015
2015 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 4 and 5. (PDF)OMM Plan6/1/2015
2015 Annual Inspection Report for CAERNARVON OUTFALL MANAGEMENT (BS-03a) (PDF)Inspection Report6/1/2015
GIWW to Clovelly Hydrologic Restoration 2015 Maintenance Project (PDF)AS-BUILT6/1/2015
Cameron Meadows Marsh Creation and Terracing (CS-66) Geotechnical Engineering Services (PDF)GEOTECHNICAL REPORT5/22/2015
2014/2015 Annual Inspection Report for Hwy 384 Hydrologic Restoration Project CS-0021 (PDF)Inspection Report5/11/2015
CS-21 2014/2015 Annual Inspection Report (PDF)Inspection Report5/11/2015
Raccoon Island Shoreline Protection/Marsh Creation (TE-48) Project, Terrebonne Parish, Louisiana Survey Report (PDF)SURVEY REPORT5/5/2015
ME-19 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2015
TV-03 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2015
TV-03 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2015
Bayou Bonfouca Marsh Creation Biological Evaluation (PDF)CONTRACTED STUDY5/1/2015
2014/2015 Annual Inspection Report for Sediment Trapping At The Jaws Project (TV-0015) (PDF)Inspection Report4/30/2015
TV-15 2014/2015 Annual Inspection Report (PDF)Inspection Report4/30/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
2016 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report4/20/2015
TE-44 2015 Annual Inspection Report (PDF)Inspection Report4/8/2015
2015 Monitoring Plan for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (BE-0035) (PDF)OMM Plan4/1/2015
2015 Monitoring Plan for Pelican Island and Pass La Mer to Chaland Pass Restoration (BA-0038) (PDF)OMM Plan4/1/2015
Cameron Meadows Marsh Creation and Terracing (CS-66) Geophysical Investigations Data Report (PDF)GEOTECHNICAL REPORT4/1/2015
2014/2015 Annual Inspection Report for East Marsh Island Marsh Creation Project TV-0021 (PDF)Inspection Report3/30/2015
TV-21 2014/2015 Annual Inspection Report (PDF)Inspection Report3/30/2015
LA-09 Project Completion Report (PDF)Project Completion Report3/26/2015
West Belle Pass Barrier Headland Restoration (TE-52) Project - Bathymetric and Topographic Survey (PDF)SURVEY REPORT2/25/2015
Geotechnical Investigation Data Report PO-104 Bayou Bonfouca Marsh Creation Project Expanded Borrow Area Investigation (PDF)GEOTECHNICAL REPORT2/24/2015
Island Road Marsh Creation and Nourishment Permit MVN 2014-2677 WB (PDF)PERMITS1/23/2015
Survey Plan Methodology Report January 22, 2015 State of Louisiana, Coastal Protection and Restoration Authority (CPRA) Cole's Bayou Marsh Restoration (TV-0063) Amendment 2 Vermilion Parish, La (PDF)SURVEY REPORT1/22/2015
2014/2015 Annual Inspection Report for Holly Beach Sand Management CS-0031 (PDF)Inspection Report12/12/2014
Island Road Marsh Creation and Nourishment Coastal Use Permit P20141474 (PDF)PERMITS12/5/2014
State of Louisiana Coastal Protection and Restoration Authority Cole's Bayou Marsh Creation and Hydrological Restoration (TV-0063) Magnetometer Survey Equipment Access, Pipeline Corridor, and Borrow Area, Vermilion Parish, Louisiana (PDF)SURVEY REPORT12/3/2014
Cole's Bayou Marsh Hydrodynamic Modeling Report (PDF)CONTRACTED STUDY12/2/2014
Cole's Bayou Marsh Hydrodynamic Modeling Report (PDF)CONTRACTED STUDY12/2/2014
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2014
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2014
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2014
2014 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028) (CS-0028-1) (CS-0028-3) (PDF)OM&M Report12/1/2014
2014 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028) (CS-0028-1) (CS-0028-3) (PDF)OM&M Report12/1/2014
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP Modification #2 (PDF)PERMITS11/24/2014
Grand Lake Shoreline Protection Tebo Point Water Quality Certification WQC 140602-01 (PDF)PERMITS11/21/2014
CS-31 2014/2015 Annual Inspection Report (PDF)Inspection Report11/12/2014
CS-23 2014/2015 Annual Inspection Report (PDF)Inspection Report11/12/2014
2014/2015 Annual Inspection Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-0023) (PDF)Inspection Report11/12/2014
Joint Permit Application for Island Road Marsh Creation and Nourishment Exploratory Geotech at Fill Site (PDF)PERMITS11/6/2014
Island Road Marsh Creation and Nourishment CAD Package for Exploratory Geotech at Fill Site (PDF)PERMITS11/1/2014
Highway 384 Hydrologic Restoration Project Maintenance Event Bid Package (PDF)BID DOCUMENTS11/1/2014
Annex A CPRA Maps and Scope of Services for Topographic, Bathymetric, Magnetometer, and Geophysical Surveys for Caminada Headlands Back Barrier Marsh Creation Project (BA-171) (PDF)SURVEY REPORT11/1/2014
GIWW Bank Restoration of Critical Areas in Terrebonne Project Completion Report (PDF)Project Completion Report10/17/2014
LA-08 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2014
2014 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028-1), (CS-0028-3) (PDF)OMM Plan10/1/2014
2014 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028-1), (CS-0028-3) (PDF)OMM Plan10/1/2014
2014 Operations, Maintenance, and Monitoring Report for Bioengineered Oyster Reef Demonstration Project (LA-08) (PDF)OM&M Report10/1/2014
2014 Annual Inspection Report Hopedale Hydrologic Restoration (PDF)Inspection Report9/16/2014
Operations, Maintenance, and Rehabilitation Plan for Oyster Bayou Marsh Restoration Project (CS-59) (PDF)OMM Plan9/1/2014
2014 Operations, Maintenance, and Monitoring Report for Jonathan Davis Wetland Restoration (BA-20) (PDF)OM&M Report9/1/2014
2014 Operations, Maintenance, and Monitoring Report for Bayou LaBranche Wetland Creation (PO-17) (PDF)OM&M Report9/1/2014
BA-20 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2014
PO-24 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2014
PO-17 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2014
Bayou Bonfouca Borrow Area Survey (PDF)SURVEY REPORT8/8/2014
Final Design Report Cole's Bayou Marsh Restoration Project (TV-63) (PDF)GEOTECHNICAL REPORT8/4/2014
TE-26 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2014
PO-33 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/23/2014
Grand Liard Marsh and Ridge Restoration Permit Modifications #5 (07/21/2014) (PDF)PERMITS7/21/2014
PO-33 2014 Annual Inspection Report (PDF)Inspection Report7/16/2014
2014 Annal Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report7/11/2014
2014 Annual Inspection Report for Fritchie Marsh Restoration (PDF)Inspection Report7/8/2014
2014 Annual Inspection Report Barataria Bay Waterway East Shoreline Protection (PDF)Inspection Report7/7/2014
2014 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF)Inspection Report7/7/2014
2014 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF)Inspection Report7/7/2014
2014 Annual Inspection Report for NAOMI OUTFALL MANAGEMENT (PDF)Inspection Report7/7/2014
GIWW To Clovelly Hydrologic Restoration (BA-0002) (PDF)SURVEY REPORT7/1/2014
2014 Annual Inspection Report for CAERNARVON OUTFALL MANAGEMENT (BS-03a) (PDF)Inspection Report7/1/2014
BA-48 Coastal Protection & Restoration Authority Quarterly Progress Report July 2014 (PDF)General Programmatic Document7/1/2014
Coastwide Nutria Control Program 2013-2014 Nutria Harvest and Distribution 2013-2014 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2014 (PDF)OM&M Report6/30/2014
Coastal Protection and Restoration Authority Whiskey Island Back Barrier Marsh Creation Project Final Report TE-50 (PDF)SURVEY REPORT6/20/2014
BS-11 Delta Management at Fort St. Philip (BS-11) 2014 Annual Inspection Report (PDF)Inspection Report6/17/2014
2014 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report6/4/2014
Grand Liard Marsh and Ridge Restoration Permit Modifications #4 (06/03/2014) (PDF)PERMITS6/3/2014
CS-18 2014 Operations, Maintenance, and Monitoring and Final Close Out Report (PDF)OM&M Report6/1/2014
CS-24 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
ME-04 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
TV-04 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
TV-09 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protection (ME-0004) (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Boston Canal/Vermilion Bay Shoreline Stabilization Project (TV-0009) (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Perry Ridge Shore Protection (CS-0024) (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration TV-0014 (PDF)OM&M Report6/1/2014
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2014 Post-Construction Survey;Monitoring Report (PDF)SURVEY REPORT6/1/2014
October 23, 2014 Task Force Meeting Funding Transfer Presentation ME-21 Grand Lake Shoreline Protection Project (PDF)MEETING PRESENTATION5/22/2014
Lost Lake Marsh Creation and Hydrologic Restoration Finding of No Significant Impact (PDF)Environmental Assessment5/6/2014
Lost Lake Marsh Creation and Hydrologic Restoration Environmental Assessment (PDF)Environmental Assessment5/1/2014
Lost Lake Marsh Creation and Hydrologic Restoration Environmental Assessment (PDF)Environmental Assessment5/1/2014
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report (PDF)DESIGN REPORT5/1/2014
2014 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report4/28/2014
Grand Liard Marsh and Ridge Restoration Permit Modifications #3 (04/14/2014) (PDF)PERMITS4/14/2014
Labranche Central Marsh Creation (PO-133) Geotechnical Report (PDF)GEOTECHNICAL REPORT4/11/2014
TV-21 Addendum 1 (PDF)BID DOCUMENTS4/4/2014
Shell Beach South Marsh Creation Plan View and Surveys (PDF)GEOTECHNICAL REPORT4/1/2014
TE-48 Phase B Project Completion Report (PDF)Project Completion Report3/31/2014
GIWW Bank Restoration of Critical Areas in Terrebonne As Built Plans (PDF)AS-BUILT3/26/2014
TV-21 Bid Documents (PDF)BID DOCUMENTS3/10/2014
2014 Annual Inspection Report for Terrebonne Bay Shore Protection Demonstration (PDF)Inspection Report3/1/2014
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP Modification #1 (PDF)PERMITS2/24/2014
BA-36 Monitoring Plan (PDF)OMM Plan2/1/2014
BA-68 Addendum 4 (PDF)BID DOCUMENTS1/27/2014
BA-68 Addendum 3 (PDF)BID DOCUMENTS1/15/2014
TV-03 Monitoring Plan (PDF)OMM Plan1/15/2014
TV-13a Monitoring Plan (PDF)OMM Plan1/15/2014
TE-43 Construction Update 1-25-2014 Photos (PDF)AS-BUILT1/15/2014
ME-19 Monitoring Plan (2014 Update) (PDF)OMM Plan1/14/2014
BA-68 Addendum 2 (PDF)BID DOCUMENTS1/8/2014
BA-40 Addendum 2 (PDF)BID DOCUMENTS1/7/2014
BA-40 Addendum 3 (PDF)BID DOCUMENTS1/7/2014
TV-12 Monitoring Plan (PDF)OMM Plan1/2/2014
ME-11 Monitoring Plan (PDF)OMM Plan1/2/2014
ME-14 Monitoring Plan (Update 2014) (PDF)OMM Plan1/2/2014
CS-27 Monitoring Plan (PDF)OMM Plan1/2/2014
ME-04 Monitoring Plan (PDF)OMM Plan1/2/2014
Operation, Maintenance and Rehabilitation Plan for the West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)OMM Plan1/1/2014
Draft Data Report Field and Laboratory Data Collection Phase Cole's Bayou Marsh Restoration Project (TV-63) (PDF)DATA COLLECTION12/20/2013
Draft Data Report Field and Laboratory Data Collection Phase Cole's Bayou Marsh Restoration Project (TV-63) (PDF)DATA COLLECTION12/20/2013
BA-68 Addendum 1 (PDF)BID DOCUMENTS12/20/2013
TV-09 Monitoring Plan (PDF)OMM Plan12/19/2013
MR-09 Addendum 4 (PDF)BID DOCUMENTS12/16/2013
ME-16 Monitoring Plan (PDF)OMM Plan12/12/2013
TV-14 Monitoring Plan (PDF)OMM Plan12/12/2013
TV-21 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan (PDF)OMM Plan12/12/2013
ME-09 Monitoring Plan (PDF)OMM Plan12/12/2013
CS-30 Monitoring Plan (PDF)OMM Plan12/12/2013
CS-24 Monitoring Plan (PDF)OMM Plan12/12/2013
Perry Ridge Shore Protection (CS-24) Monitoring Plan (PDF)OMM Plan12/12/2013
LA-16 Information Packet (PDF)Project Report12/11/2013
MR-09 Addendum 3 (PDF)BID DOCUMENTS12/5/2013
BA-40 Addendum 1 (PDF)BID DOCUMENTS12/3/2013
BA-02 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2013
2013 Operations, Maintenance, and Monitoring Report for GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration (BA-02) (PDF)OM&M Report12/1/2013
2013 Operations, Maintenance, and Monitoring Report for West Lake Boudreaux Shoreline Protection and Marsh Creation (TE-46) (PDF)OM&M Report12/1/2013
BA-40 Bid Plans (PDF)BID DOCUMENTS11/26/2013
BA-40 Bid Specifications (PDF)BID DOCUMENTS11/26/2013
MR-09 Addendum 2 (PDF)BID DOCUMENTS11/26/2013
BA-76 Finding of No Significant Impact (PDF)Project Report11/26/2013
BA-76 Environmental Assessment (PDF)Environmental Assessment11/25/2013
BA-76 Environmental Assessment Appendix A (PDF)Environmental Assessment11/25/2013
Notice to Proceed for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation Project (BA-48) (PDF)BID DOCUMENTS11/25/2013
Signed Contract with Weeks Marine (PDF)BID DOCUMENTS11/22/2013
BA-68 Appendix B (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix E (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix F (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix G (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix H (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix I (PDF)BID DOCUMENTS11/19/2013
BA-68 Bid Plans (PDF)BID DOCUMENTS11/19/2013
BA-68 Bid Specifications (PDF)BID DOCUMENTS11/19/2013
MR-09 Addendum 1 (PDF)BID DOCUMENTS11/12/2013
MR-09 Bid Plans (PDF)BID DOCUMENTS11/5/2013
MR-09 Bid Specifications (PDF)BID DOCUMENTS11/5/2013
Original Bid - Recommendation of Award to Weeks Marine, Inc. (PDF)BID DOCUMENTS10/29/2013
Moffatt & Nichol Re-Bid Recommendation Letter (PDF)BID DOCUMENTS10/28/2013
Original Bid - Bid Tabulation Sheet for Mississippi River Long Distance Sediment Pipeline and Bayou Dupont Marsh and Ridge Creation (PDF)BID DOCUMENTS10/22/2013
Re-Bid Addendum No. 1 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS10/16/2013
Coastal Protection and Restoration Authority Project Completion Report for Brady Canal Hydrologic Restoration (TE-01) 2012 Maintenance Report (PDF)Project Completion Report10/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Labranche Central Marsh Creation U S Army Corps of Engineers Permit MVN2013-1950 EBB (PDF)PERMITS9/20/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP (PDF)PERMITS9/3/2013
CS-20 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix F 95 Percent Cost Estimate Back Up (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix G Mech. Sluice Gate Calculations (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As Builts (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As Builts (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix B Percent Specifications (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
TE-52 Project Completion Report (PDF)Project Completion Report8/21/2013
Survey Plan Methodology Report August 21, 2013 State of Louisiana, Coastal Protection and Restoration Authority (CPRA) Cole's Bayou Marsh Restoration (TV-0063) Vermilion Parish, La (PDF)SURVEY REPORT8/21/2013
2013 Annual Inspection Report Hopedale Hydrologic Restoration (PDF)Inspection Report8/12/2013
Final Data Report Field and Laboratory Data Collection Phase Oyster Bayou Marsh Restoration Project (PDF)GEOTECHNICAL REPORT8/9/2013
TE-45 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2013
2013 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) (PDF)OM&M Report8/1/2013
2013 Operations, Maintenance, and Monitoring Report for Terrebonne Bay Shore Protection Demonstration (TE-45) (PDF)OM&M Report8/1/2013
Orginal Bid - Addendum No. 3 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS7/30/2013
Original Bid - Addendum No. 2 Plans and Constract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS7/19/2013
PO-104 Meeting Presentation (PDF)MEETING PRESENTATION7/17/2013
Geotechnical Data Report Bayou Bonfouca Borrow Area Sediment Sampling (PDF)GEOTECHNICAL REPORT7/16/2013
Original Bild - Addendum 01 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS7/12/2013
Borrow Area Geotechnical Services Data Report (PDF)GEOTECHNICAL REPORT7/11/2013
2013 Annual Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report7/10/2013
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF)OM&M Report7/2/2013
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF)OM&M Report7/2/2013
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF)OM&M Report7/2/2013
BA-39 Monitoring Plan (PDF)OMM Plan7/1/2013
TE-48 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2013
2013 Annual Inspection Report for Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake (BA-37) (PDF)Inspection Report7/1/2013
2012 Annual Inspection Report Mississippi Sediment Delivery System – Bayou Dupont (PDF)REFERENCE LITERATURE7/1/2013
2013 Annual Inspection Report Mississippi Sediment Delivery System – Bayou Dupont (PDF)Inspection Report7/1/2013
Coastwide Nutria Control Program 2012-2013 Nutria Harvest and Distribution 2012-2013 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2013 (PDF)OM&M Report6/30/2013
State of Louisiana Coastal Protection and Restoration Authority Cole's Bayou Marsh Creation and Hydrological Restoration (TV-0063) Magnetometer Survey Marsh Creation and Borrow Areas, Vermilion Parish, Louisiana (PDF)SURVEY REPORT6/26/2013
BA-68 Appendix C (PDF)BID DOCUMENTS6/26/2013
TV-15 2012/2013 Annual Inspection Report (PDF)Inspection Report6/14/2013
CS-22 2012/2013 Annual Inspection Report (PDF)Inspection Report6/13/2013
CS-24 2012/2013 Annual Inspection Report (PDF)Inspection Report6/13/2013
CS-30 2012/2013 Annual Inspection Report (PDF)Inspection Report6/13/2013
CS-11b 2012/2013 Annual Inspection (PDF)Inspection Report6/12/2013
ME-09 2012/2013 Annual Inspection Report (PDF)Inspection Report6/12/2013
CS-31 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2013
2013 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (TV-21) (PDF)OM&M Report6/1/2013
Non-Rock Alternatives To Shoreline Protection Demonstration Permit U S Army Corps of Engineers (PDF)PERMITS5/23/2013
2013 Annual Inspection Report Fritchie Marsh Restoration (PDF)Inspection Report5/15/2013
TV-14 2012/2013 Annual Inspection Report (PDF)Inspection Report5/12/2013
2013 Annual Inspection Report Bayou Chevee Shoreline Protection (PDF)Inspection Report5/9/2013
2014 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (PDF)Inspection Report5/6/2013
2013 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report5/6/2013
Non-Rock Alternatives to Shoreline Protection Demonstration As Builts (PDF)AS-BUILT5/1/2013
TV-18 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
TV-03 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
TV-12 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
ME-14 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
Lost Lake Marsh Creation and Hydrologic Restoration Department of Environmental Quality Water Quality Certification WQC 13031-01/AI 186530/CER 20130001 (PDF)PERMITS4/17/2013
Joint Public Notice (PDF)PERMITS4/15/2013
TV-14 2012/2013 Annual Inspection Report (PDF)Inspection Report3/26/2013
CS-27 2012/2013 Annual Inspection Report (PDF)Inspection Report3/20/2013
Grand Liard Marsh and Ridge Restoration Permit Modifications #2 (03/19/2013) (PDF)PERMITS3/19/2013
CS-21 2012/2013 Annual Inspection Report (PDF)Inspection Report3/7/2013
PO-33 Monitoring Plan (PDF)OMM Plan3/1/2013
2013 Operations, Maintenance and Monitoring Report for Humble Canal Hydrologic Restoration (ME-11) (PDF)OM&M Report3/1/2013
Re-Bid - Bid Package Plans and Specifications for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS3/1/2013
Re-Bid - Bid Package Plans and Specifications for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS3/1/2013
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management Water Quality Certification WQC 121129-02?AI 185272/CER 20130001 (PDF)PERMITS2/28/2013
BA-164 General Project Fact Sheet (PDF)General Project Fact Sheet2/25/2013
BA-164 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/25/2013
2012 Annual Inspection Report Hopedale Hydrologic Restoration (PDF)Inspection Report2/1/2013
CS-28-1 Meeting Presentation (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Non-Rock Alternatives To Shoreline Protection Demonstration Coastal Use Permit, Coastal Zone Consistency (PDF)PERMITS1/17/2013
BA-68 Appendix A (PDF)BID DOCUMENTS1/4/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
TE-53 Final Report (PDF)EA or EIS and Ecological Review12/19/2012
TE-53 - Final Report (PDF)Project Report12/19/2012
AT-02 2012 Biennial Inspection Report (PDF)Inspection Report12/15/2012
AT-03 2012 Biennial Inspection Report (PDF)Inspection Report12/15/2012
ME-16 2012/2013 Annual Inspection Report (PDF)Inspection Report12/13/2012
CS-17 2012/2013 Annual Inspection Report (PDF)Inspection Report12/12/2012
TV-13A 2012/2013 Annual Inspection Report (PDF)Inspection Report12/11/2012
TE-46 2012 Monitoring Plan (PDF)OMM Plan12/1/2012
Private Aids to Navigation Application (PDF)PERMITS11/29/2012
Private Aids to Navigation Application (PDF)PERMITS11/29/2012
Private Aids to Navigation Application (PDF)PERMITS11/29/2012
BS-11 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/12/2012
CS-32 2012/2013 Annual Inspection Report (PDF)Inspection Report10/11/2012
BA-27d 2012 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report10/10/2012
Operation, Maintenance, and Rehabilitation Plan for the BA-27d - Barataria Land Bridge Shoreline Protection Phase 4 (Construction Unit No. 6) (PDF)OMM Plan10/10/2012
GIWW To Clovelly Hydrologic Restoration 2010 Maintenance Report Project Completion Report (PDF)Project Completion Report10/5/2012
2012 Annual Inspection Report for Delta Wide Crevasses (MR-09) (PDF)Inspection Report10/3/2012
Lost Lake Marsh Creation and Hydrologic Restoration 95% Design Report (PDF)DESIGN REPORT10/1/2012
Notice to Proceed Racoon Island - Phase B (PDF)BID DOCUMENTS9/27/2012
TE-46 Operation, Maintenance, and Rehabilitation Plan (PDF)OMM Plan9/25/2012
BA-37 2012 Annual Inspection Report (PDF)Inspection Report9/5/2012
2012 Annual Inspection Report for Goose Point/ Point Platte Marsh Creation Project (PO-33) (PDF)Inspection Report9/1/2012
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF)GEOTECHNICAL REPORT8/24/2012
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF)GEOTECHNICAL REPORT8/24/2012
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF)GEOTECHNICAL REPORT8/24/2012
Acceptance of Offer and Notice of Award (PDF)BID DOCUMENTS8/20/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B As-Builts (PDF)AS-BUILT8/12/2012
2012 Annual Inspection Report for Delta Management at Fort St. Philip (BS-11) (PDF)Inspection Report8/7/2012
MR-06 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2012
West Lake Boudreaux Shoreline Protection and Marsh Creation As-Built (PDF)AS-BUILT7/27/2012
BA-39 Investigation of Potential Mississippi River Borrow Areas (PDF)Contract Studies/Data Collection Report7/24/2012
TE-48 Bids (PDF)BID DOCUMENTS7/23/2012
Penchant Basin Natural Resources Plan, Increment 1 Project Completion Report (PDF)Project Completion Report7/19/2012
TE-28 2012 Annual Inspection Report (PDF)Inspection Report7/15/2012
TE-44 2012 Annual Inspection Report (PDF)Inspection Report7/10/2012
CS-32 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2012
TE-25 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2012
TE-25 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2012
TE-26 2012 Annual Inspection Report (PDF)Inspection Report7/1/2012
Great Lak Dredge & Dock Plaquemines Parish Government Construction Permit (PDF)PERMITS7/1/2012
Coastwide Nutria Control Program 2011-2012 Nutria Harvest and Distribution 2011-2012 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2012 (PDF)OM&M Report6/30/2012
CS-20 2011/2012 Annual Inspection Report (PDF)Inspection Report6/29/2012
ME-22 2011/2012 Annual Inspection Report (PDF)Inspection Report6/19/2012
TE-22 2012 Annual Inspection Report (PDF)Inspection Report6/15/2012
ME-14 2011/2012 Annual Inspection Report (PDF)Inspection Report6/13/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
South Lake Decade Freshwater Introduction Project Completion Report (PDF)Project Completion Report6/5/2012
Lost Lake Marsh Creation and Hydrologic Restoration 30% Design Report (PDF)DESIGN REPORT6/1/2012
BA-68 Environmental Assessment (PDF)Environmental Assessment6/1/2012
TV-15 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
CS-27 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
PO-06 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
ME-16 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
BA-37 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
CS-22 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
CS-30 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
TV-04 2011/2012 Annual Inspection Report (PDF)Inspection Report5/30/2012
TV-17 2011/2012 Annual Inspection Report (PDF)Inspection Report5/29/2012
CS-24 2011/2012 Annual Inspection Report (PDF)Inspection Report5/24/2012
ME-19 2011/2012 Annual Inspection Report (PDF)Inspection Report5/17/2012
TV-09 2011/2012 Annual Inspection Report (PDF)Inspection Report5/16/2012
ME-04 2011/2012 Annual Inspection Report (PDF)Inspection Report5/16/2012
ME-13 2011/2012 Annual Inspection Report (PDF)Inspection Report5/16/2012
BA-02 2012 Annual Inspection Report (PDF)Inspection Report5/14/2012
Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island (TE-26), Structure 3 Demolition Project Completion Report (PDF)Project Completion Report5/9/2012
LA-08 2012 Operations, Maintenance, and Monitoring Plan (PDF)OMM Plan5/7/2012
CS-32 Monitoring Plan 2012 (PDF)OMM Plan5/4/2012
TE-46 CU#2 Project Completion Report (PDF)Project Completion Report5/4/2012
TE-46 Project Completion Report (PDF)Project Completion Report5/3/2012
West Lake Boudreaux Shoreline Protection and Marsh Creation Project Completion Report (PDF)Project Completion Report5/3/2012
Brady Canal Hydrologic Restoration 2012 Maintenance Project (TE-28) Terrebonne Parish, Louisiana (PDF)AS-BUILT4/16/2012
TV-03 2011/2012 Annual Inspection Report (PDF)Inspection Report4/12/2012
TV-18 2011/2012 Annual Inspection Report (PDF)Inspection Report4/12/2012
TV-12 2011/2012 Annual Inspection Report (PDF)Inspection Report4/12/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase A Project Completion Report (PDF)Project Completion Report4/9/2012
LA-08 Project Completion Report (PDF)Project Completion Report4/2/2012
Bayou Bonfouca Marsh Creation 30% Design Report (PDF)DESIGN REPORT4/1/2012
CS-11b 2011/2012 Annual Inspection Report (PDF)Inspection Report3/28/2012
ME-09 2011/2012 Annual Inspection Report (PDF)Inspection Report3/28/2012
TV-04 2012 Project Completion Report (PDF)Project Completion Report3/20/2012
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 6 Project Completion Report (BA-27) (PDF)Project Completion Report3/16/2012
TV-14 2011/2012 Annual Inspection Report (PDF)Inspection Report3/14/2012
TV-21 2011/2012 Annual Inspection Report (PDF)Inspection Report3/13/2012
DOTD Highway 23 Permit Extension (PDF)PERMITS3/13/2012
CS-59 General Project Fact Sheet (PDF)General Project Fact Sheet3/5/2012
CS-59 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/5/2012
TV-04 As-Built Drawings - Contruction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION3/2/2012
CS-23 2012 Monitoring Plan (PDF)OMM Plan3/1/2012
Raccoon Island Shoreline Protection and Marsh Creation Plans and Specs Phase B (PDF)BID DOCUMENTS2/29/2012
Raccoon Island Shoreline Protection and Marsh Creation Plans and Specs Phase B (PDF)BID DOCUMENTS2/29/2012
CS-21 2011/2012 Annual Inspection Report (PDF)Inspection Report2/23/2012
BA-30 Projects Under Construction Update February 15, 2012 (PDF)MEETING PRESENTATION2/15/2012
PO-133 General Project Fact Sheet (PDF)General Project Fact Sheet2/10/2012
PO-133 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/10/2012
BA-125 General Project Fact Sheet (PDF)General Project Fact Sheet2/1/2012
BA-125 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/1/2012
TV-63 General Project Fact Sheet (PDF)General Project Fact Sheet2/1/2012
TV-63 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/1/2012
2011 Annual Inspection Report Hopedale Hydrologic Restoration (PDF)Inspection Report2/1/2012
2011 Annual Inspection Report Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF)Inspection Report2/1/2012
SOP Manual for CRMS-Wetlands 2012 (PDF)Project Report1/27/2012
2011 Annual Inspection Report Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF)Inspection Report1/26/2012
BS-11 2011 Annual Inspection Report (PDF)Inspection Report1/12/2012
MR-09 2011 Annual Inspection Report (PDF)Inspection Report1/12/2012
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2011 Post-Construction Survey;Monitoring Report (PDF)SURVEY REPORT1/1/2012
BA-68 Appendix D (PDF)BID DOCUMENTS12/28/2011
CS-31 As-Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/28/2011
CS-31 Segment Lengths for As-Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/28/2011
ME-16 As-Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/22/2011
CS-31 2011/2012 Annual Inspection Report (PDF)Inspection Report12/21/2011
CS-23 As-Built Drawings (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/20/2011
BA-33 Myrtle Grove Delta Building Diversion Modeling Effort in Support of the LCA Medium Diversion at Myrtle Grove with Dedicated Dredging Project (PDF)Contract Studies/Data Collection Report12/12/2011
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF)OM&M Report12/6/2011
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF)OM&M Report12/6/2011
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF)OM&M Report12/6/2011
Coastal Protection and Restoration Authority of Louisiana. Operations, Maintenance, and Monitoring (O M and M) Workshop. December 2011. (PDF)OM&M Report12/6/2011
CS-23 2011/2012 Annual Inspection Report (PDF)Inspection Report12/1/2011
ME-16 2011 Project Completion Report (PDF)Project Completion Report12/1/2011
CS-21 2010 Operations, Maintenance, and Monitoring Plan (PDF)OMM Plan12/1/2011
TE-40 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
ME-13 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
BA-03C 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
PO-17 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
TE-28 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
Lake Hermitage Marsh Creation Bid Package (PDF)BID DOCUMENTS11/15/2011
BA-68 Ecological Review (PDF)EA or EIS and Ecological Review11/14/2011
BA-20 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/1/2011
TV-13a 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/1/2011
2011 Annual Inspection Report Fritchie Marsh Restoration (PDF)Inspection Report11/1/2011
Bayou Bonfouca Marsh Creation Survey Report (PDF)SURVEY REPORT10/27/2011
Bayou Bonfouca Marsh Creation Survey Report (PDF)SURVEY REPORT10/27/2011
Bayou Bonfouca Marsh Creation Survey Report (PDF)SURVEY REPORT10/27/2011
CS-17 2011/2012 Annual Inspection Report (PDF)Inspection Report10/20/2011
Rockefeller Refuge Gulf Shoreline Stabilization Demonstration Project (ME-18) Post Construction Monitoring (PDF)OM&M Report10/4/2011
TV-21 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan (PDF)OMM Plan10/1/2011
BA-68 Final Design Report (PDF)FINAL DESIGN REPORT10/1/2011
BA-23 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2011
TV-18 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2011
South Lake Decade Freshwater Introduction As-Built Plans (PDF)AS-BUILT9/22/2011
CS-04a Meeting Presentation (PDF)MEETING PRESENTATION9/21/2011
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 4 Project Completion Report (PDF)Project Completion Report9/1/2011
BS-03A 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2011
2010 Annual Inspection Report Hopedale Hydrologic Restoration (PDF)Inspection Report8/31/2011
2010 Annual Inspection Report Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF)Inspection Report8/31/2011
TE-44 2011 Annual Inspection Report (PDF)Inspection Report8/30/2011
Penchant Basin Natural Resources Plan, Increment 1 As Builts (PDF)AS-BUILT8/29/2011
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF)GEOTECHNICAL REPORT8/8/2011
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF)GEOTECHNICAL REPORT8/8/2011
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF)GEOTECHNICAL REPORT8/8/2011
Department of the Army Consent to Cross U.S. Government Easement at Empire to Gulf Waterway Project (PDF)PERMITS8/6/2011
Geotech Permits (PDF)PERMITS8/5/2011
Geotech Permits (PDF)PERMITS8/5/2011
Geotech Permits (PDF)PERMITS8/5/2011
River Reintroduction Into Maurepas Swamp (PO-0029). Draft Environmental Information Document. (PDF)Environmental Assessment8/1/2011
BA-02 2011 Annual Inspection Report (PDF)Inspection Report8/1/2011
TE-41 2011 Closeout Report For Mandalay Bank Protection Demonstration (TE-41) Project (PDF)Project Completion Report8/1/2011
TE-26 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2011
TV-14 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2011
BA-37 2011 Annual Inspection Report (PDF)Inspection Report7/30/2011
2011 Annual Inspection Report Naomi Outfall Management (PDF)Inspection Report7/26/2011
2011 Annual Inspection Report Barataria Bay Waterway East Bank Protection (PDF)Inspection Report7/26/2011
Non-Rock Alternatives to Shoreline Protection Demonstration Geotechnical Engineering Services (PDF)GEOTECHNICAL REPORT7/7/2011
BA-39 2011 Annual Inspection Report (PDF)Inspection Report7/1/2011
CS-24 2011 Operations, Maintenance, and Monitoriing Report (PDF)OM&M Report7/1/2011
TE-22 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2011
TV-04 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2011
CS-28-1 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2011
Geotechnical Design Report Chenier Ronquille Restoration Plaquemines Parish, Louisiana (PDF)GEOTECHNICAL REPORT6/30/2011
Coastwide Nutria Control Program 2010-2011 Nutria Harvest and Distribution 2010-2011 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2011 (PDF)OM&M Report6/30/2011
2011 Annual Inspection Report Jonathan Davis Wetland Protection (PDF)Inspection Report6/29/2011
TV-17 2010/2011 Annual Inspection Report (PDF)Inspection Report6/26/2011
2011 Annual Inspection Report Barataria Bay Waterway West Bank Protection (PDF)REFERENCE LITERATURE6/23/2011
2011 Annual Inspection Report Bayou Chevee Shoreline Protection (PDF)Inspection Report6/23/2011
ME-14 2010/2011 Annual Inspection Report (PDF)Inspection Report6/10/2011
ME-04 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2011
CS-11b 2011 Operations, Maintenance, and Monitoring (PDF)OM&M Report6/1/2011
PO-22 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2011
BA-39 Project Completion Report (PDF)Project Completion Report5/24/2011
CS-27 2010/2011 Annual Inspection Report (PDF)Inspection Report5/4/2011
BS-03a Analysis of Fisheries-Independent Data (PDF)Contract Studies/Data Collection Report5/1/2011
ME-19 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
CS-30 2010/2011 Annual Inspection Report (PDF)Inspection Report4/14/2011
TV-09 2010/2011 Annual Inspection Report (PDF)Inspection Report4/12/2011
ME-13 2010/2011 Annual Inspection Report (PDF)Inspection Report4/12/2011
Water Quality Certification (PDF)PERMITS4/11/2011
TV-15 2010/2011 Annual Inspection Report (PDF)Inspection Report4/5/2011
Operation, Maintenance, and Rehabilitation Plan for North Lake Mechant Landbridge Restoration Project TE-0044 (PDF)OMM Plan4/5/2011
TE-44 2011 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report4/5/2011
ME-11 2011/2012 Annual Inspection Report (PDF)Inspection Report3/24/2011
ME-22 2010/2011 Annual Inspection Report (PDF)Inspection Report3/24/2011
ME-11 2010/2011 Annual Inspection Report (PDF)Inspection Report3/24/2011
ME-09 2010/2011 Annual Inspection Report (PDF)Inspection Report3/24/2011
Mississippi River Sediment Delivery System - Bayou Dupont Final Construction Fact Sheet (PDF)FACT SHEET3/21/2011
CS-20 Project Completion Report (PDF)Project Completion Report3/16/2011
LA-05 Monitoring and Comprehensive Project FINAL REPORT (PDF)Comprehensive Monitoring Report3/9/2011
Analysis of Sediment Cores from the West Bay Diversion Receiving Area (PDF)DATA COLLECTION3/3/2011
LDWF Permit Application for Dredging (PDF)PERMITS3/1/2011
LDWF Permit Application for Dredging (PDF)PERMITS3/1/2011
TV-21 Completion Report (PDF)Project Completion Report3/1/2011
TV-21 As Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION3/1/2011
GIWW To Clovelly Hydrologic Restoration 2010 Maintenance Project As Built (PDF)AS-BUILT3/1/2011
TV-12 2010/2011 Annual Inspection Report (PDF)Inspection Report2/22/2011
TV-03 2010/2011 Annual Inspection Report (PDF)Inspection Report2/22/2011
CS-21 2010/2011 Annual Inspection Report (PDF)Inspection Report2/9/2011
CS-54 General Project Fact Sheet (PDF)General Project Fact Sheet2/8/2011
CS-54 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/8/2011
TE-83 General Project Fact Sheet (PDF)General Project Fact Sheet2/8/2011
TE-83 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/8/2011
PO-104 General Project Fact Sheet (PDF)General Project Fact Sheet2/8/2011
PO-104 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/8/2011
CS-20 2010/2011 Annual Inspection Report (PDF)Inspection Report2/7/2011
BA-40 Permit Plat (PDF)PERMITS2/3/2011
Riverine Sand Mining/Scofield Island Restoration Project (BA-40) Project Narrative (PDF)PERMITS2/1/2011
TE-45 2011 Annual Inspection Report (PDF)Inspection Report2/1/2011
BA-48 Environmental Assessment (PDF)Environmental Assessment2/1/2011
East Grand Terre Survey Report January 21, 2011 (PDF)SURVEY REPORT1/21/2011
CS-23 2010/2011 Annual Inspection Report (PDF)Inspection Report1/20/2011
BA-30 Project Completion Report (PDF)Project Completion Report1/20/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
CS-53 General Project Fact Sheet (PDF)General Project Fact Sheet1/1/2011
CS-53 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/1/2011
LA-39 General Project Fact Sheet (PDF)General Project Fact Sheet1/1/2011
LA-39 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/1/2011
Bio-Engineered Oyster Reef Demonstration Bid Package (PDF)BID DOCUMENTS1/1/2011
TE-28 2010 Annual Inspection Report (PDF)Inspection Report12/28/2010
Raccoon Island Shoreline Protection Marsh Creation Coastal Zone Consistency Permit C20070631 (PDF)PERMITS12/24/2010
2010 Annual Inspection Report Jonathan Davis Wetland Protection (PDF)Inspection Report12/15/2010
2010 Annual Inspection Report for Fritchie Marsh Restoration (PDF)Inspection Report12/15/2010
2010 Annual Inspection Report Barataria Bay Waterway East Bank Protection (PDF)Inspection Report12/13/2010
2010 Annual Inspection Report Barataria Bay Waterway West Bank Protection (PDF)Inspection Report12/13/2010
2010 Annual Inspection Report Naomi Outfall Management (PDF)Inspection Report12/13/2010
CS-17 2010/2011 Annual Inspection Report (PDF)Inspection Report12/9/2010
BA-02 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2010
CS-31 2010 Operations, Maintenance, and Monitoring Plan (PDF)OM&M Report12/1/2010
CS-20 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2010
ME-11 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2010
PO-24 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/29/2010
CS-31 2010/2011 Annual Inspection Report (PDF)Inspection Report10/27/2010
TE-22 2010 Annual Inspection Report (PDF)Inspection Report10/27/2010
BA-48 Ecological Review (PDF)EA or EIS and Ecological Review10/27/2010
PO-29 Assessment of an Alternative Siphon System Intake (PDF)Contract Studies/Data Collection Report10/20/2010
PO-29 Assessment of an Alternative Siphon System Intake - Figures (PDF)Contract Studies/Data Collection Report10/20/2010
MR-09 2010 Annual Inspection Report (PDF)Inspection Report10/7/2010
CS-32 2010/2011 Annual Inspection Report (PDF)Inspection Report10/6/2010
Ba-48 95% Design Report (PDF)95% DESIGN REPORT10/1/2010
TE-52 Water Quality Certification (PDF)PERMITS9/29/2010
2010 Annual Inspection Report for Delta Management at Fort St. Phillip (BS-11) (PDF)Inspection Report9/8/2010
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Project Completion Report (PDF)Project Completion Report9/1/2010
BA-37 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2010
Bio-Engineered Oyster Reef Demonstration Coastal Use Permit/Consistency Determination (PDF)PERMITS8/25/2010
Survey Cost Estimate BA-0002 GIWW To Clovelly Maintenance Project (PDF)SURVEY REPORT8/6/2010
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2010 Post-Construction Survey Monitoring Report (PDF)SURVEY REPORT8/1/2010
TE-44 Lake Mechant Project Completion Report (PDF)Project Completion Report8/1/2010
TE-52 Environmental Assessment (PDF)Environmental Assessment8/1/2010
CRMS Fact Sheet (PDF)General Project Fact Sheet8/1/2010
GIWW Bank Restoration of Critical Areas in Terrebonne USACE Permit Extension MVN-2004-04534-WY (PDF)PERMITS7/22/2010
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 5 As Build Drawings (PDF)AS-BUILT7/20/2010
TE-48 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report7/1/2010
LA-03b Nutria Harvest and Distribution 2009-2010 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2010 (PDF)OM&M Report6/30/2010
PO-75 General Project Fact Sheet (PDF)General Project Fact Sheet6/16/2010
PO-75 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/16/2010
TE-72 General Project Fact Sheet (PDF)General Project Fact Sheet6/16/2010
TE-72 General Project Fact Sheet (PDF)General Project Fact Sheet6/16/2010
BA-76 General Project Fact Sheet (PDF)General Project Fact Sheet6/14/2010
BA-76 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/14/2010
ME-31 General Project Fact Sheet (PDF)General Project Fact Sheet6/9/2010
ME-31 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/9/2010
Bio-Engineered Oyster Reef Demonstration Category II Programmatic General Permit (PDF)PERMITS6/7/2010
Operation, Maintenance, and Rehabilitation Plan for the Terrebonne Bay Shore Protection and Demonstration Project State Project No. TE-45 (PDF)OMM Plan6/1/2010
TE-45 2010 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report6/1/2010
TE-26 2010 Annual Inspection Report (PDF)Inspection Report6/1/2010
TE-45 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report6/1/2010
BA-35 Project Completion Report (PDF)Project Completion Report6/1/2010
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management 95% Design Report (PDF)DESIGN REPORT5/7/2010
Lake Borgne Shoreline Protection Project Completion Report (PDF)Project Completion Report4/14/2010
CS-17 2009/2010 Annual Inspection Report (PDF)Inspection Report4/6/2010
AT-02 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report3/20/2010
AT-03 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report3/20/2010
CS-18 2009/2010 Annual Inspection Report (PDF)Inspection Report3/18/2010
BA-40 Ecological Review (PDF)EA or EIS and Ecological Review3/16/2010
MR-03 West Bay Sediment Diversion EIS- Record of Decision (PDF)Project Report3/11/2010
CS-32 2009/2010 Annual Inspection Report (PDF)Inspection Report3/11/2010
BS-15 General Project Fact Sheet (PDF)General Project Fact Sheet3/10/2010
BS-15 General Project Fact Sheet High Qulaity (PDF)General Project Fact Sheet3/10/2010
BS-18 General Project Fact Sheet (PDF)General Project Fact Sheet3/10/2010
BS-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/10/2010
TE-50 Project Completion Report (PDF)Project Completion Report3/1/2010
Shoreline Position and Transect Elevation Preliminary Survey Report, TE-0040, March 2010 (PDF)CONTRACTED STUDY3/1/2010
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Increment 2 (PDF)BID DOCUMENTS2/23/2010
CS-04a Project Completion Report - Levee Erosion Work (PDF)Project Completion Report2/15/2010
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans Increment 2 (PDF)BID DOCUMENTS2/10/2010
CS-04a Project Completion Report - As Built 2010 (PDF)Project Completion Report2/1/2010
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management Subsoil Investigation (PDF)GEOTECHNICAL REPORT1/27/2010
LA-09 General Project Fact Sheet (PDF)General Project Fact Sheet1/22/2010
LA-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/22/2010
BS-16 General Project Fact Sheet (PDF)General Project Fact Sheet1/19/2010
BS-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/19/2010
CS-49 General Project Fact Sheet (PDF)General Project Fact Sheet1/19/2010
CS-49 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/19/2010
TV-09 2009/2010 Annual Inspection Report (PDF)Inspection Report1/14/2010
TV-13a 2009/2010 Annual Inspection Report (PDF)Inspection Report1/14/2010
BA-48 General Project Fact Sheet (PDF)General Project Fact Sheet1/7/2010
BA-48 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/7/2010
BA-68 General Project Fact Sheet (PDF)General Project Fact Sheet1/7/2010
BA-68 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/7/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix A - Mississippi River Borrow Area Geophysical Survey (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix B: Mississippi River Borrow Area Geotechnical Survey (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix C: Mississippi River Borrow Area Sediment Analyses (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix D: Mississippi River One-Dimensional Modeling Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix E: Mississippi River Borrow Area Design Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix F: Conveyance Corridor Survey Report - Upland Segment (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 1-10 (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 11-20 (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 21-32 (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix H: Environmental Mapping of the Conveyance Corridor and Scofield Island (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix I: Conveyance Corridor Design Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix J: Scofield Offshore Borrow Areas Design Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix K: SI Back-Barrier Geotechnical Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix L: Scofield Island Native Beach Sediment Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix M: Scofield Island Restoration Area Design Analysis (PDF)95% DESIGN REPORT1/1/2010
TV-14 2009/2010 Annual Inspection Report (PDF)Inspection Report12/3/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 1 of 6 Overview (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 2 of 6 Uncertainty (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 3 of 6 Data Collection (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 4 of 6 Geomorphic Assessment (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 5 of 6 1-Dimensional Modeling (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 6 of 6 Multi-Dimensional Modeling (PowerPoint Presentation)Project Report12/1/2009
MR-03 ERDC Work Plan Report - DRAFT West Bay Sediment Diversion Effects (PDF)Project Report11/25/2009
MR-03 Appendices A through M (PDF)Project Report11/25/2009
MR-03 Aerial and Bathymetric Spatial Change Analysis of the West Bay Sediment Diversion Receiving Area, Louisiana for U.S. Army Engineer District, New Orleans (MVN) (PDF)Project Report11/24/2009
North Lake Mechant Landbridge Restoration Water Quality Certification WQC 080424-01/AI 117287/CER 20090002 (PDF)PERMITS11/18/2009
LA-16 General Project Fact Sheet (PDF)General Project Fact Sheet11/16/2009
LA-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet11/16/2009
MR-09 2009 Annual Inspection Report (PDF)Inspection Report11/16/2009
BA-47 General Project Fact Sheet (PDF)General Project Fact Sheet11/12/2009
BA-47 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet11/12/2009
CS-21 2009/2010 Annual Inspection Report (PDF)Inspection Report11/12/2009
ME-11 2009/2010 Annual Inspection Report (PDF)Inspection Report11/6/2009
ME-20 Ecological Review (PDF)EA or EIS and Ecological Review11/3/2009
BA-37 2009 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report11/1/2009
Operation, Maintenance, and Rehabilitation Plan for the Little Lake Shoreline Protection / Dedicated Dredging Project BA-37 (PDF)OMM Plan11/1/2009
West Bay Sediment Diversion Effects. (PDF)CONTRACTED STUDY11/1/2009
MR-03 20 Oct 09 Peer Review Meeting Presentations (PDF)Project Report10/27/2009
TE-66 General Project Fact Sheet (PDF)General Project Fact Sheet10/20/2009
TE-66 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/20/2009
CS-31 2009/2010 Annual Inspection Report (PDF)Inspection Report10/20/2009
CS-23 2009/2010 Annual Inspection Report (PDF)Inspection Report10/20/2009
TE-52 Monitoring Plan (PDF)OMM Plan10/15/2009
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 4 As Built (BA-27) (PDF)AS-BUILT10/6/2009
North Lake Mechant Landbridge Restoration Coast Zone Consistency Use Permit C20040642 (PDF)PERMITS10/6/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Grand Chenier Marsh Creation Final Design Report (PDF)DESIGN REPORT10/1/2009
CS-23 Project Completion Report (As Built) (PDF)Project Completion Report9/25/2009
CS-23 2009 Project Completion Report (PDF)Project Completion Report9/23/2009
BA-37 Summer 2009 Post Construction Monitoring Report (PDF)OM&M Report9/20/2009
TV-13a 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2009
BS-03a 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2009
BS-03a 2009 Annual Inspection Report (PDF)Inspection Report8/5/2009
MR-09 2009 Operations, Maintenance & Monitoring Report (PDF)Monitoring Report8/1/2009
PO-34 General Project Fact Sheet (PDF)General Project Fact Sheet8/1/2009
PO-34 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet8/1/2009
2009 Operations, Maintenance and Monitoring Report for Delta Wide Crevasses (MR-09) (PDF)OM&M Report8/1/2009
Goose Point/Point Platte Marsh Creation AS Built Survey (PDF)AS-BUILT8/1/2009
PO-33 Project Completion Report (As Constructed) (PDF)Project Completion Report8/1/2009
Bayou Penchant Basin (TE-34) Construction Specifications (PDF)DESIGN REPORT8/1/2009
BA-38 2009 Operations, Maintenance & Monitoring Report (PDF)Monitoring Report7/20/2009
BA-03c 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-06 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-24 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-26 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-38 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-23 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-16 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-18 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-20 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
MR-03 USACE West Bay Fact Sheet 07 July 2009 (PDF)Project Report7/7/2009
MR-03 7 Jul 09 Peer Review Meeting Presentation (PDF)Project Report7/7/2009
PO-22 2008 Annual Inspection Report (PDF)Inspection Report7/1/2009
PO-06 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
PO-24 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-26 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-23 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-38 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-37 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
South Grand Chenier Marsh Creation 30% Design Report (PDF)DESIGN REPORT7/1/2009
LA-03b Nutria Harvest and Distribution 2008-2009 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2009 (PDF)OM&M Report6/30/2009
TE-28 2009 Annual Inspection Report (PDF)Inspection Report6/30/2009
BA-02 2009 Annual Inspection Report (PDF)Inspection Report6/30/2009
CS-28-2 General Project Fact Sheet (PDF)General Project Fact Sheet6/23/2009
CS-28-2 General Project Fact Sheet High quality (PDF)General Project Fact Sheet6/23/2009
ME-24 General Project Fact Sheet (PDF)General Project Fact Sheet6/18/2009
ME-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/18/2009
TV-17 2008/2009 Annual Inspection Report (PDF)Inspection Report6/17/2009
PO-33 Project Completion Report (PDF)Project Completion Report6/10/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Bid Documents (PDF)BID DOCUMENTS6/3/2009
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Bid Documents (PDF)BID DOCUMENTS6/3/2009
TE-26 2009 Annual Inspection Report (PDF)Inspection Report6/1/2009
TE-22 2009 Annual Inspection Report (PDF)Inspection Report6/1/2009
CS-23 As-Built Bid Package (PDF)AS-BUILT DRAWINGS - CONSTRUCTION6/1/2009
CS-24 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2009
TV-09 2009 Operations, Maintenance, and Mointoring Report (PDF)OM&M Report6/1/2009
ME-14 2009 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2009
LA-08 General Project Fact Sheet (PDF)General Project Fact Sheet5/27/2009
LA-08 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/27/2009
TV-14 2008/2009 Annual Inspection Report (PDF)Inspection Report5/5/2009
TE-40 Habitat Mapping and Change Analysis: 2005 to 2006 Final Report (PDF)Contract Studies/Data Collection Report4/8/2009
ME-16 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report4/1/2009
CS-30 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report4/1/2009
CS-27 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report4/1/2009
CS-04a As-Built Bid Package (PDF)AS-BUILT DRAWINGS - CONSTRUCTION4/1/2009
TE-43 Breach Closures along the GIWW As-Built Drawings (PDF)AS-BUILT3/31/2009
BA-20 2009 Annual Inspection Report (PDF)Inspection Report3/23/2009
BA-03c 2009 Annual Inspection Report (PDF)Inspection Report3/20/2009
Lake Borgne Shoreline Protection As Built (PDF)AS-BUILT3/1/2009
Bayou Chevee Shoreline Protection Project As-Built Drawings (PO-0022) (PDF)AS-BUILT3/1/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations CHRONOLOGY OF THE HISTORY OF THE DEVELOPMENT - Broussard (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations CWPPRA Tech Com Meet Feb 09--Henville (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations Kj0_West Bay (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WESTBAY 27 Feb 09 Price (2) (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WESTBAY 27 Feb 09 Price (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WestBay_Padgett_27FEB09 (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations West-Bay-CWPPRA-meeting_multi-D-modeling-022709 - Brown (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WestBayrGeomorphicAssessment1DModeling (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations (All files zipped) (Zipped file)Project Report2/27/2009
CS-20 As-Built Drawings (PDF)AS-BUILT DRAWINGS - CONSTRUCTION2/9/2009
CS-20 As-Built Bid Package (PDF)AS-BUILT DRAWINGS - CONSTRUCTION2/1/2009
AT-02 Louisiana BICM Volume 2, Parts 1-4 (PDF)Contract Studies/Data Collection Report2/1/2009
AT-02 Louisiana BICM Volume 2, Appendices A-C (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 1 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 3 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 4 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 3: Bathymetry and Historical Seafloor Change 1869-2007 Part 3 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-39 Environmental Assessment (PDF)EA or EIS and Ecological Review1/2/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
AT-02 Louisiana BICM Volume 1, Part 2: 2006/2007 Aerial Survey Photography (PDF)Contract Studies/Data Collection Report1/1/2009
AT-02 Louisiana BICM Volume 1, Part 4: Historic Photo-Pairs/Time Series (PDF)Contract Studies/Data Collection Report1/1/2009
AT-02 Louisiana BICM Volume 1, Part 5: 2006/2007 Aerial Video Survey (PDF)Contract Studies/Data Collection Report1/1/2009
BA-28 Louisiana BICM Volume 3: Bathymetry and Historical Seafloor Change 1869-2007 Part 1 (PDF)Contract Studies/Data Collection Report1/1/2009
TE-24 2008 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report12/1/2008
TV-21 Environmental Assessment (PDF)EA or EIS and Ecological Review11/18/2008
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Addendum 04 (PDF)BID DOCUMENTS11/6/2008
TV-21 Ecological Review (PDF)EA or EIS and Ecological Review11/3/2008
BA-42 Ecological Review (PDF)EA or EIS and Ecological Review11/3/2008
PO-17 2008 Operations, Maintenance and Monitoring Report (PDF)OM&M Report11/1/2008
TV-13a 2008/2009 Annual Inspection Report (PDF)Inspection Report10/30/2008
ME-22 2008/2009 Annual Inspection Report (PDF)Inspection Report10/29/2008
CS-31 2008/2009 Annual Inspection Report (PDF)Inspection Report10/20/2008
CS-20 2008/2009 Annual Inspection Report (PDF)Inspection Report10/20/2008
BA-37 Final Spring 2008 Post Construction Monitoring Report (PDF)OM&M Report10/20/2008
BA-33 Alternative Modeling (PDF)Contract Studies/Data Collection Report10/16/2008
BA-33 Alternative Modeling - Appendices A-H (PDF)Contract Studies/Data Collection Report10/16/2008
BA-33 Alternative Modeling - Appendices I-R (PDF)Contract Studies/Data Collection Report10/16/2008
BA-33 Alternative Modeling - Appendices S-W (PDF)Contract Studies/Data Collection Report10/16/2008
CS-21 2008/2009 Annual Inspection Report (PDF)Inspection Report10/14/2008
TV-18 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
ME-13 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
ME-04 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
TV-12 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
TV-03 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
CS-24 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
CS-30 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
CS-27 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
CS-22 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
ME-11 2008/2009 Annual Inspection Report (PDF)Inspection Report10/1/2008
CS-11b 2008/2009 Annual Inspection Report (PDF)Inspection Report10/1/2008
BA-42 Final Design Report (PDF)FINAL DESIGN REPORT10/1/2008
TV-15 2008/2009 Annual Inspection Report (PDF)Inspection Report9/30/2008
TV-04 2008/2009 Annual Inspection Report (PDF)Inspection Report9/30/2008
SOP Manual for CRMS-Wetlands 2008 (PDF)Project Report9/18/2008
TE-50 Whiskey Island Back Barrier Marsh Creation As-Built Drawings (PDF)AS-BUILT9/1/2008
West Belle Pass Headland Restoration (TE-52): Phase I Investigations (PDF)GEOTECHNICAL REPORT9/1/2008
Whiskey Island Back Barrier Marsh Creation Bid Package (PDF)BID DOCUMENTS8/29/2008
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans (PDF)BID DOCUMENTS8/11/2008
TE-22 2008 Annual Inspection Report (PDF)Inspection Report8/1/2008
TE-44 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2008
TE-20 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2008
BA-03c 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2008
AT-02 Louisiana BICM Volume 1, Part 3: 2005-2007 Photo-Pairs (PDF)Contract Studies/Data Collection Report8/1/2008
AT-03 2008 Biennial Inspection Report (PDF)Inspection Report7/31/2008
CS-04a Project Completion Report - Repair of Breaches (PDF)Project Completion Report7/24/2008
CS-04A Project Completion Report - As Built Drawings 2006 (PDF)Project Completion Report7/24/2008
AT-02 2008 Biennial Inspection Report (PDF)Inspection Report7/21/2008
TE-45 Transect Survey Report (PDF)Project Completion Report7/16/2008
TE-45 Terrebonne Bay Shore Protection Demonstration Project TE-45 Survey Report (PDF)Project Completion Report7/16/2008
PO-22 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2008
CS-23 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2008
TV-18 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2008
LA-03b Nutria Harvest Distribution 2007-2008 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2008 (PDF)OM&M Report6/30/2008
Raccoon Island Shoreline Protection Marsh Creation Permits MVN-2008-0143 CQ (PDF)PERMITS6/18/2008
TV-12 2007/2008 Annual Inspection Report (PDF)Inspection Report6/6/2008
Whiskey Island Back Barrier Marsh Creation U S Army Corps of Engineers Permit MVN 2008-226-CY (PDF)PERMITS6/2/2008
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 1 (PDF)Contract Studies/Data Collection Report6/1/2008
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 2 (PDF)Contract Studies/Data Collection Report6/1/2008
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 3 (PDF)Contract Studies/Data Collection Report6/1/2008
MR-06 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2008
Shoreline Position and Transect Elevation Survey Report, TE-0040, June 2008 (PDF)CONTRACTED STUDY6/1/2008
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) Final Report (PDF)SURVEY REPORT5/30/2008
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) Final Report (PDF)SURVEY REPORT5/30/2008
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) (PDF)SURVEY REPORT5/30/2008
ME-22 2007/2008 Annual Inspection Report (PDF)Inspection Report5/28/2008
CS-04a Project Completion Report - Levee Breaches (PDF)Project Completion Report5/21/2008
TE-26 2008 Annual Inspection Report (PDF)Inspection Report5/16/2008
CS-11b 2007/2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
ME-11 2007/2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
TE-28 2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
ME-09 2007/2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
TE-27 2008 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report5/1/2008
2007 Annual Inspection Report Jonathan Davis Wetland Protection (PDF)Inspection Report4/29/2008
2007 Annual Inspection Report Barataria Bay Waterway East Bank Protection (PDF)Inspection Report4/28/2008
2007 Annual Inspection Report Barataria Bay Waterway West Bank Protection (PDF)Inspection Report4/28/2008
TV-09 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
ME-13 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
ME-04 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
TV-03 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
TE-45 Project Completion Report (PDF)Project Completion Report4/16/2008
BS-11 2008 Annual Inspection Report (PDF)Inspection Report4/15/2008
TV-17 2007/2008 Annual Inspection Report (PDF)Inspection Report4/15/2008
BA-02 2008 Annual Inspection Report (PDF)Inspection Report4/9/2008
ME-19 2007/2008 Annual Inspection Report (PDF)Inspection Report4/4/2008
TV-15 2007/2008 Annual Inspection Report (PDF)Inspection Report4/1/2008
ME-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2008
ME-17 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2008
MR-09 2008 Annual Inspection Report (PDF)Inspection Report3/12/2008
CS-20 2007/2008 Annual Inspection Report (PDF)Inspection Report3/11/2008
ME-14 2007/2008 Annual Inspection Report (PDF)Inspection Report3/6/2008
BS-03a 2008 Annual Inspection Report (PDF)Inspection Report3/4/2008
TV-14 2007-2008 Annual Inspection Report (PDF)Inspection Report2/28/2008
Whiskey Island Back Barrier Marsh Creation Coastal Zone Consistency C20070623 (PDF)PERMITS2/18/2008
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF)Monitoring Report2/13/2008
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF)Monitoring Report2/13/2008
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF)Monitoring Report2/13/2008
CS-21 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report2/13/2008
CS-21 2007/2008 Annual Inspection Report (PDF)Inspection Report2/12/2008
TE-51 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/4/2008
TE-52 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/4/2008
TE-51 General Project Fact Sheet (PDF)General Project Fact Sheet2/4/2008
TE-52 General Project Fact Sheet (PDF)General Project Fact Sheet2/4/2008
TE-53 General Project Fact Sheet (PDF)General Project Fact Sheet1/1/2008
TE-53 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/1/2008
TV-04 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
TE-44 North Lake Mechant Landbridge Restoration As-Builts (PDF)AS-BUILT1/1/2008
TE-48 Phase B Ecological Review (PDF)EA or EIS and Ecological Review12/19/2007
PO-06 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/13/2007
CS-17 2007/2008 Annual Inspection Report (PDF)Inspection Report12/12/2007
BA-41 Ecological Review (PDF)EA or EIS and Ecological Review12/12/2007
TV-04 2001 Project Completion Report - As Built Drawings (PDF)Project Completion Report12/11/2007
CS-18 2007/2008 Annual Inspection Report (PDF)Inspection Report12/6/2007
TV-04 2007 Project Completion Report (PDF)Project Completion Report12/1/2007
BA-33 Modeling Relationships between the Abundance of Fishery Species, Coastal Wetland Landscapes, and Salinity in the Barataria Basin, Louisiana (PDF)General Programmatic Document12/1/2007
CS-22 2007/2008 Annual Inspection Report (PDF)Inspection Report11/27/2007
BA-39 Ecological Review (PDF)EA or EIS and Ecological Review11/7/2007
TE-50 Ecological Review (PDF)EA or EIS and Ecological Review11/7/2007
BA-23 2007 Project Completion Report (PDF)Project Completion Report11/6/2007
TE-50 Monitoring Plan (PDF)OMM Plan11/5/2007
ME-09 2006/2007 Annual Inspection Report (PDF)Inspection Report11/2/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report (PDF)DESIGN REPORT11/1/2007
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report Appendices (PDF)DESIGN REPORT11/1/2007
CS-31 2007/2008 Annual Inspection Report (PDF)Inspection Report10/30/2007
CS-28-3 Project Completion Report (PDF)Project Completion Report10/19/2007
CS-28-3 2007 Project Completion Report (PDF)Project Completion Report10/19/2007
BA-39 Review (Contracted Study Report) (PDF)Contract Studies/Data Collection Report10/17/2007
TE-37 Project Completion Report 1 of 7 (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 2 of 7 Apdx A (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 3 of 7 Apdx B (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 4 of 7 Apdx C (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 5 of 7 Apdx D (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 6 of 7 Apdx E (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 7 of 7 Apdx F (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix A (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix B (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix C (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix D (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix E (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix F (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report (PDF)Project Completion Report10/5/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report (PDF)GEOTECHNICAL REPORT10/1/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix A (PDF)GEOTECHNICAL REPORT10/1/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix B (PDF)GEOTECHNICAL REPORT10/1/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix C (PDF)GEOTECHNICAL REPORT10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
TE-23 Project Completion Report As-Built Drawings (PDF)Project Completion Report9/27/2007
BA-37 Post Construction Survey Report (PDF)OM&M Report8/20/2007
PO-24 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/14/2007
BA-02 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/6/2007
ME-19 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-31 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
ME-11 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-21 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TE-41 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TV-14 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TV-03 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-20 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
ME-04 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TE-28 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-17 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-28 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
BA-37 Project Completion Report (PDF)Project Completion Report8/1/2007
Raccoon Island Shoreline Protection and Marsh Creation 30% Design Report (PDF)DESIGN REPORT8/1/2007
BA-20 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/30/2007
TE-37 Vegetative Plantings (As-built) (PDF)Project Completion Report7/24/2007
PO-27 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/19/2007
PO-18 2006/2007 Annual Inspection Report (PDF)Inspection Report7/19/2007
BA-03c 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
BS-03a 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
PO-22 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
BA-26 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
PO-16 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
TE-22 2006/2007 Annual Inspection Report (PDF)Inspection Report7/1/2007
Geotechnical Investigation Data Report Mississippi River Sediment Delivery System - Bayou Dupont (PDF)GEOTECHNICAL REPORT7/1/2007
Mississippi River Sediment Delivery System - Bayou Soil Borings (PDF)GEOTECHNICAL REPORT7/1/2007
LA-03b Nutria Harvest Distribution 2006-2007 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2007 (PDF)OM&M Report6/30/2007
TE-40 Monitoring Plan (PDF)OMM Plan6/25/2007
TE-0040 Monitoring Plan, Timbalier Island Marsh / Dune Restoration, June 25, 2007 (PDF)OMM Plan6/25/2007
TV-15 2006/2007 Annual Inspection Report (PDF)Inspection Report6/22/2007
TV-04 2006/2007 Annual Inspection Report (PDF)Inspection Report6/22/2007
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF)Inspection Report6/21/2007
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF)Inspection Report6/21/2007
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF)Inspection Report6/21/2007
CS-24 2006/2007 Annual Inspection Report (PDF)Inspection Report6/20/2007
CS-30 2006/2007 Annual Inspection Report (PDF)Inspection Report6/20/2007
TV-17 2006/2007 Annual Inspection Report (PDF)Inspection Report6/19/2007
ME-14 2006/2007 Annual Inspection Report (PDF)Inspection Report6/19/2007
ME-16 2007 Project Completion Report (PDF)Project Completion Report6/18/2007
TE-26 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/15/2007
Chaland Headland Restoration (BA-38-2) CWPPRA Project Completion Report Short Version (PDF)Project Completion Report6/4/2007
BA-23 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2007
BS-13 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2007
MR-15 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2007
BS-13 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2007
MR-15 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2007
TV-21 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2007
TV-21 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2007
BS-03a 2004 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report5/30/2007
MR-09 2004 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report5/30/2007
BA-03c and BA-26 2004 Operations, Maintenance and Monitoring Report (PDF)Monitoring Report5/1/2007
BA-03c and BA-26 2004 Operations, Maintenance and Monitoring Report (PDF)Monitoring Report5/1/2007
TV-13a 2006/2007 Annual Inspection Report (PDF)Inspection Report5/1/2007
TV-09 2006/2007 Annual Inspection Report (PDF)Inspection Report5/1/2007
ME-13 2006/2007 Annual Inspection Report (PDF)Inspection Report5/1/2007
TV-14 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2007
BA-37 Project Completion Report (As-Built Plans) (PDF)Project Completion Report5/1/2007
BA-38 Project Completion Report As-Built Drawings (PDF)Project Completion Report4/13/2007
BA-03c 2006 Annual Inspection Report (PDF)Inspection Report4/5/2007
CS-28-3 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2007
ME-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2007
CS-28-3 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2007
ME-16 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2007
TE-37 Project Completion Report As-Built Drawings (PDF)Project Completion Report3/28/2007
CS-20 Comprehensive Monitoring Report 2 (PDF)Comprehensive Monitoring Report3/26/2007
CS-18 2006/2007 Annual Inspection Report (PDF)Inspection Report3/22/2007
CS-23 2006/2007 Annual Inspection Report (PDF)Inspection Report3/22/2007
TE-39 Environmental Assessment (PDF)Environmental Assessment3/19/2007
TV-18 2006/2007 Annual Inspection Report (PDF)Inspection Report3/6/2007
TV-12 2006/2007 Annual Inspection Report (PDF)Inspection Report3/6/2007
PO-29 Hydraulic Feasibility Study 1 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 2 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 3 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 4 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 5 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 6 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 7 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
BA-35 Environmental Assessment (PDF)Environmental Assessment3/1/2007
BA-35 Environmental Assessment (PDF)EA or EIS and Ecological Review3/1/2007
LA-05 Monitoring Report 1 of 2 (PDF)OM&M Report2/5/2007
LA-05 Monitoring Report 2 of 2 (PDF)OM&M Report2/5/2007
Lake Borgne Shoreline Protection Bid Documents (PDF)BID DOCUMENTS2/1/2007
Lake Borgne Shoreline Protection Bid Documents (PDF)BID DOCUMENTS2/1/2007
TE-45 Terrebonne Bay Shoreline Protection Demonstration As-Built Drawings (PDF)Inspection Report2/1/2007
CS-31 As-Built Sand Fence Repairs (PDF)Project Completion Report1/18/2007
BS-11 Project Completion Report (PDF)Project Completion Report1/4/2007
GIWW To Clovelly Hydrologic Restoration Timber Pile Cluster and Navigational Aid Replacement (PDF)Project Completion Report1/4/2007
CS-31 2006 Project Completion Report (PDF)Project Completion Report12/4/2006
CS-11b 2005/2006 Annual Inspection Report (PDF)Inspection Report11/13/2006
LA-05 Annual Report 2005-2006 (PDF)OM&M Report11/12/2006
PO-32 Ecological Review (PDF)EA or EIS and Ecological Review11/8/2006
CS-22 2006/2007 Annual Inspection Report (PDF)Inspection Report11/8/2006
CS-11b 2006/2007 Annual Inspection Report (PDF)Inspection Report11/2/2006
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF)Inspection Report10/18/2006
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF)Inspection Report10/18/2006
TE-26 2005/2006 Annual Inspection Report (PDF)Inspection Report9/30/2006
ME-22 Project Completion Report (PDF)Project Completion Report9/25/2006
ME-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet9/1/2006
ME-23 General Project Fact Sheet (PDF)General Project Fact Sheet9/1/2006
BA-27d Project Completion Report (As-Built) (PDF)Project Completion Report8/31/2006
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 6 As Built Drawings (BA-27) (PDF)AS-BUILT8/31/2006
TE-28 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
BA-27 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
TE-22 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
BA-02 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
PO-16 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
PO-18 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
PO-22 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
BA-20 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
TE-0040 As-Builts, 2002 to 2006 (PDF)AS-BUILT8/15/2006
TE-0040 As-Builts, 2002 to 2006 (PDF)AS-BUILT8/15/2006
TE-0040 As-Builts, 2002 to 2006 (PDF)AS-BUILT8/15/2006
PO-24 2006 Annual Inspection Report (PDF)Inspection Report8/14/2006
PO-06 2006 Annual Inspection Report (PDF)Inspection Report8/14/2006
BA-23 2006 Annual Inspection Report (PDF)Inspection Report8/10/2006
BA-26 2006 Annual Inspection Report (PDF)Inspection Report8/10/2006
TE-18 Comprehensive Monitoring Report No. 1 (PDF)OM&M Report8/1/2006
TE-46 Environmental Assemment (PDF)EA or EIS and Ecological Review7/1/2006
TE-0040 Habitat Analysis Report, 2005 to 2006 (PDF)CONTRACTED STUDY7/1/2006
BA-27 Environmental Assessment (PDF)Environmental Assessment6/16/2006
TE-40 Timbalier Island Vegetative Plantings - Phase II (As-built) (PDF)Project Completion Report6/13/2006
TE-40 2006 Project Completion Report (PDF)Project Completion Report6/1/2006
Installation of Sand Fence on Timbalier Island (TE-0040), June 2006 (PDF)Project Completion Report6/1/2006
Pass Chaland to Grand Gayou Pass Barrier Shoreline Restoration Permit MVN 2005-4406-EBB (PDF)OM&M Report5/28/2006
BA-02 Hydrodynamic and Salinity Modeling (PDF)Contract Studies/Data Collection Report5/10/2006
ME-18 Environmental Assessment with Memos (PDF)Environmental Assessment5/1/2006
ME-18 Environmental Assessment (PDF)EA or EIS and Ecological Review5/1/2006
Louisiana Department of Natural Resources Report of Geotechnical Investigation Goose Point/Point Platte (PO-0033), St. Tammany Parish, Louisiana (PDF)GEOTECHNICAL REPORT4/20/2006
ME-17 Hydrodynamic Modeling 1 of 2 (PDF)Contract Studies/Data Collection Report4/19/2006
ME-17 Hydrodynamic Modeling 2 of 2 (PDF)Contract Studies/Data Collection Report4/19/2006
BA-42 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2006
BA-41 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2006
BA-41 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2006
BA-42 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2006
BA-26 2006 Project Completion Report (PDF)Project Completion Report3/30/2006
BA-23 2006 Project Completion Report (PDF)Project Completion Report3/30/2006
Lake Borgne Shoreline Protection Coastal Use Permit (PDF)PERMITS3/28/2006
BA-27 Ecological Review (PDF)EA or EIS and Ecological Review3/15/2006
BA-27c Ecological Review (PDF)EA or EIS and Ecological Review3/15/2006
BA-27d Ecological Review (PDF)EA or EIS and Ecological Review3/15/2006
ME-22 2006 Environmental Assessment (PDF)Environmental Assessment3/7/2006
AT-04 Environmental Assessment (PDF)Environmental Assessment3/1/2006
BA-25b Final Phase 2 Design Report part 1 of 6 (PDF)Contract Studies/Data Collection Report3/1/2006
BA-25 Phase 2 Design Report (PDF)Contract Studies/Data Collection Report3/1/2006
ME-04 2006 Completion Report Maintenance/Repair (PDF)Project Completion Report3/1/2006
Rockefeller Refuge Gulf Shoreline Stabilization Final Design Report (PDF)DESIGN REPORT2/15/2006
TV-04 and TV-17 Repair and Maintenance - As Built Drawings (PDF)Project Completion Report2/1/2006
ME-20 Hydrodynamic Modeling 1 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
ME-20 Hydrodynamic Modeling 2 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
ME-20 Hydrodynamic Modeling 3 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
ME-20 Hydrodynamic Modeling 4 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
BA-04c Hydrodynamic Modeling 1 of 3 (PDF)Contract Studies/Data Collection Report1/24/2006
BA-04c Hydrodynamic Modeling 2 of 3 (PDF)Contract Studies/Data Collection Report1/24/2006
BA-04c Hydrodynamic Modeling 3 of 3 (PDF)Contract Studies/Data Collection Report1/24/2006
GIWW Bank Restoration of Critical Areas in Terrebonne UASCE Permit MVN 2004-4534 CY (PDF)PERMITS1/18/2006
AT-02 2005 Bi-Annual Inspection Report (PDF)Inspection Report12/30/2005
2005 Bi-Annual Inspection Report for Big Island Mining (PDF)Inspection Report12/30/2005
AT-02 Monitoring Plan (PDF)Monitoring Plan12/27/2005
BA-27 Monitoring Plan (PDF)Monitoring Plan12/27/2005
BA-25b Phase 1 Design Report Cover Pages (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Executive Summary (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Table of Contents (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 1 - Introduction (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 2 - Overview of Alternatives Development (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 3 - Conveyance Evaluation (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 4 - Diversion Structures (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 5 - Infrastructure, Utility, and Site Modifications (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 6 - Dredging, Disposal, and Beneficial Reuse Analysis (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 7 - Comparison of Alternatives (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 8 - Recommended Alternatives for the 30 Percent Design Evaluation (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 9 - LDNR and U.S. EPA Review (PDF)Project Report12/15/2005
GIWW Bank Restoration of Critical Areas in Terrebonne Coastal Zone Consistency Permit (PDF)PERMITS12/7/2005
TE-47 Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2005
LA-05 Project Plan and Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2005
PO-30 Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2005
TE-23 Comprehensive Monitoring Report 1 (PDF)OM&M Report12/1/2005
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration 95% Design Report (PDF)DESIGN REPORT12/1/2005
BA-30 Ecological Review (PDF)EA or EIS and Ecological Review11/30/2005
BA-30 Ecological Review (PDF)EA or EIS and Ecological Review11/30/2005
PO-30 Ecological Review (PDF)EA or EIS and Ecological Review11/22/2005
TE-46 Ecological Review (PDF)EA or EIS and Ecological Review11/22/2005
BS-03a 2006 Annual Inspection Report (PDF)Inspection Report11/17/2005
TE-23 2005 Operation, Maintenance, Repair, Replacement, and Rehabilitation Plan (PDF)Project Report11/14/2005
Operation, Maintenance, and Rehabilitation Plan for the West Belle Pass Headland Restoration Project (TE - 23 / PTE - 27) (PDF)OMM Plan11/14/2005
BA-35 Ecological Review (PDF)EA or EIS and Ecological Review11/7/2005
CS-20 2005/2006 Annual Inspection Report (PDF)Inspection Report11/3/2005
CRMS - Wetlands, Status Report for the CWPPRA Task Force (PDF)Project Report11/3/2005
BA-25b Phase 1 Design Report part 1 of 5 (PDF)Contract Studies/Data Collection Report11/1/2005
BA-25 Phase 1 Design Report (PDF)Contract Studies/Data Collection Report11/1/2005
BA-36 Environmental Assessment (PDF)EA or EIS and Ecological Review11/1/2005
Lake Borgne Shoreline Protection 95% Design Report (PDF)DESIGN REPORT11/1/2005
AT-04 Ecological Review (PDF)EA or EIS and Ecological Review10/27/2005
CS-18 2005/2006 Annual Inspection Report (PDF)Inspection Report10/27/2005
West Lake Boudreaux Shoreline Protection and Marsh Creation 95% Design Report (PDF)DESIGN REPORT10/26/2005
CS-17 2005/2006 Annual Inspection Report (PDF)Inspection Report10/24/2005
CS-21 2005/2006 Annual Inspection Report (PDF)Inspection Report10/24/2005
CS-31 2005/2006 Annual Inspection Report (PDF)Inspection Report10/24/2005
ME-09 2005/2006 Annual Inspection Report (PDF)Inspection Report10/21/2005
ME-14 2005/2006 Annual Inspection Report (PDF)Inspection Report10/20/2005
TV-17 2005/2006 Annual Inspection Report (PDF)Inspection Report10/20/2005
ME-11 2005/2006 Annual Inspection Report (PDF)Inspection Report10/19/2005
CS-23 2005/2006 Annual Inspection Report (PDF)Inspection Report10/13/2005
ME-19 2005/2006 Annual Inspection Report (PDF)Inspection Report10/12/2005
TE-47 Ecological Review (PDF)EA or EIS and Ecological Review10/12/2005
TV-15 2005/2006 Annual Inspection Report (PDF)Inspection Report10/11/2005
TV-04 2005/2006 Annual Inspection Report (PDF)Inspection Report10/11/2005
TV-14 2005/2006 Annual Inspection Report (PDF)Inspection Report10/10/2005
ME-13 2005/2006 Annual Inspection Report (PDF)Inspection Report10/7/2005
ME-04 2005/2006 Annual Inspection Report (PDF)Inspection Report10/7/2005
CS-24 2005/2006 Annual Inspection Report (PDF)Inspection Report10/6/2005
CS-27 2005/2006 Annual Inspection Report (PDF)Inspection Report10/6/2005
CS-30 2005/2006 Annual Inspection Report (PDF)Inspection Report10/6/2005
TV-18 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-09 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-13a 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-12 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-03 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TE-22 Breach Repairs (As-Built) (PDF)Project Completion Report10/4/2005
ME-18 Ecological Review (PDF)EA or EIS and Ecological Review9/20/2005
GIWW Bank Restoration of Critical Areas in Terrebonne Water Quality Certification (PDF)PERMITS9/20/2005
ME-18 Environmental Assessment (PDF)EA or EIS and Ecological Review9/20/2005
TE-45 Monitoring Plan (PDF)OMM Plan9/12/2005
Rockefeller Refuge Gulf Shoreline Stabilization (ME-0018) Ecological Review (PDF)ECOLOGICAL REVIEW9/5/2005
TE-22 Project Completion Report (PDF)Project Completion Report9/1/2005
TE-48 Monitoring Plan (PDF)OMM Plan8/24/2005
BA-37 Monitoring Plan (PDF)OMM Plan8/16/2005
MR-09 Final Report (PDF)Project Completion Report8/8/2005
TE-22 2005 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report8/1/2005
Raccoon Island Shoreline Protection and Marsh Creation Offshore Geophysical and Preliminary Geotechnical Survey Report (PDF)GEOTECHNICAL REPORT7/15/2005
PO-32 Ecological Review (PDF)EA or EIS and Ecological Review7/12/2005
TE-48 Ecological Review (PDF)EA or EIS and Ecological Review7/6/2005
Lake Borgne Shoreline Protection Preliminary Design Report (PDF)DESIGN REPORT7/1/2005
LA-03b Nutria Harvest Distribution 2004-2005 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2005 (PDF)OM&M Report6/30/2005
MR-09 Project Completion Report (PDF)Project Completion Report6/28/2005
MR-09 Project Completion Report - Hydro Consultants, Inc. (PDF)Project Completion Report6/28/2005
TE-36 Close Out Report (PDF)Close Out Report6/27/2005
TE-40 Timbalier Island Vegetative Plantings - Phase I (As-built) (PDF)Project Completion Report6/23/2005
LA-05 Monitoring Plan (PDF)OMM Plan6/13/2005
TV-15 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-16 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-17 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TE-25 and TE-30 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TE-25 and TE-30 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TE-28 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-09 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
PO-22 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
ME-11 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
ME-13 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
ME-09 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-28-1 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-30 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-17 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-18 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-23 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-24 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-22 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-11b 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-03 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-14 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-18 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
BA-03c 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-20 2005 Comprehensive Monitoring Report (PDF)OM&M Report5/20/2005
ME-22 Monitoring Plan (PDF)OMM Plan5/16/2005
BS-12 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/12/2005
BS-12 General Project Fact Sheet (PDF)General Project Fact Sheet5/12/2005
ME-21 Monitoring Plan (PDF)OMM Plan5/10/2005
ME-16 Monitoring Plan (PDF)OMM Plan5/10/2005
Rockefeller Refuge Gulf Shoreline Stabilization 95% Design Report (PDF)DESIGN REPORT5/2/2005
TE-48 Raccoon Island Shoreline Protection and Marsh Creation (Phase A) As-Built Drawings (PDF)AS-BUILT5/1/2005
BA-03c Project Completion Report (PDF)Project Completion Report4/13/2005
PO-24 2005 Project Completion Report (PDF)Project Completion Report4/4/2005
TE-40 Project Completion Report As-Built Drawings (PDF)Project Completion Report3/29/2005
Coastwide Reference Monitoring System - Wetlands, Status Report for the CWPPRA Technical Committee, March 15, 2005 (PowerPoint Presentation)Project Report3/15/2005
TE-40 2005 Project Completion Report (PDF)Project Completion Report3/1/2005
TE-36 Final Report (PDF)OM&M Report3/1/2005
TE-48 Environmental Assessment (PDF)EA or EIS and Ecological Review3/1/2005
ME-16 Environmental Assessment (PDF)EA or EIS and Ecological Review3/1/2005
TE-0040 Project Completion Report, Timbalier Island Marsh/Dune Restoration Project (PDF)Project Completion Report3/1/2005
TV-11b Monitoring Plan (PDF)OMM Plan2/3/2005
BA-40 General Project Fact Sheet (PDF)General Project Fact Sheet2/1/2005
BA-40 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/1/2005
CS-23 2005 Project Completion Report (PDF)Project Completion Report1/27/2005
TV-17 Project Completion Report (PDF)Project Completion Report1/25/2005
CS-17 Draft 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report1/24/2005
TV-15 Project Completion Report As-Built Drawings (PDF)Project Completion Report1/14/2005
PO-24 Project Completion Report (PDF)Project Completion Report1/12/2005
TV-15 Monitoring Plan (PDF)OMM Plan1/5/2005
ME-19 Project Completion Report (PDF)Project Completion Report1/3/2005
TV-15 Project Completion Report (PDF)Project Completion Report1/1/2005
TE-17 Project Completion Report As-Built Drawings (PDF)Project Completion Report12/16/2004
PO-30 Environmental Assessment (PDF)EA or EIS and Ecological Review12/16/2004
Lake Chapeau Warning Buoy Replacement (TE-26) Terrebonne Parish, LA DNR Contract No. 2503-03-18 Survey and Engineering Services (PDF)Project Completion Report12/1/2004
CS-32 Environmental Assessment (PDF)EA or EIS and Ecological Review11/1/2004
ME-22 Ecological Review (PDF)EA or EIS and Ecological Review9/17/2004
TE-48 Phase A Ecological Review (PDF)EA or EIS and Ecological Review9/16/2004
ME-21 Ecological Review (PDF)EA or EIS and Ecological Review9/14/2004
ME-22 Finding of No Significant Impact (PDF)EA or EIS and Ecological Review9/13/2004
ME-22 2004 Environmental Assessment (PDF)Environmental Assessment9/13/2004
TE-43 Ecological Review (PDF)EA or EIS and Ecological Review9/9/2004
TE-39 Ecological Review (PDF)EA or EIS and Ecological Review9/2/2004
Lake Borgne and MRGO Shoreline Protection Ecological Review (PDF)ECOLOGICAL REVIEW9/1/2004
ME-22 Wetland Value Assessment (PDF)WVA Pre-Design8/31/2004
TE-44 Construction Unit 2 Ecological Review (PDF)EA or EIS and Ecological Review8/26/2004
TE-44 Ecological Review (PDF)EA or EIS and Ecological Review8/26/2004
ME-16 Ecological Review (PDF)EA or EIS and Ecological Review8/25/2004
Freshwater Introduction South of Highway 82 Geotechnical Report (PDF)GEOTECHNICAL REPORT8/12/2004
BA-36 Ecological Review (PDF)EA or EIS and Ecological Review8/12/2004
GEOTECHNICAL STUDY TEST SECTIONS ROCKEFELLER REFUGE GULF SHORELINE STABILIZATION PROJECT, CAMERON PARISH, LOUISIANA (PDF)GEOTECHNICAL REPORT8/12/2004
TE-41 Monitoring Plan (PDF)OMM Plan8/5/2004
TE-41 2004 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report8/1/2004
Operation, Maintenance, and Rehabilitation Plan for the Mandalay Bank Protection Demonstration State Project No. TE-0041 (PDF)OMM Plan8/1/2004
North Lake Mechant Landbridge Restoration 95% Design Report (PDF)DESIGN REPORT8/1/2004
TV-18 Monitoring Plan (PDF)OMM Plan7/19/2004
TV-17 Monitoring Plan (PDF)OMM Plan7/15/2004
BA-02 2003 Operations, Maintenance and Monitoring Report (PDF)OM&M Report7/8/2004
TE-17 Project Completion Report (PDF)Project Completion Report7/1/2004
LA-03b Nutria Harvest Distribution 2003-2004 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2004 (PDF)OM&M Report6/30/2004
Task 3 from Request For Proposal - Project Specific Station Coordinates (Zipped file)Raw Data6/29/2004
TE-28 2003 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/14/2004
Task 3 from Request For Proposal - Project Specific Station Location Maps (PDF)Project Report6/2/2004
ME-22 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
LA-06 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-49 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TV-20 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
LA-05 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
PO-33 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
PO-32 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
PO-30 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-39 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-25b General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-34-2 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-37 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
MR-14 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-40 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-50 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-39 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
LA-05 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
LA-06 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
BA-25b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
BA-34-2 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
ME-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
MR-14 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
PO-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
PO-32 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
PO-33 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-49 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-50 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TV-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-37 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-40 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
AT-03 Monitoring Report (PDF)Monitoring Report5/5/2004
AT-03 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report5/5/2004
AT-02 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report5/5/2004
Operation, Maintenance, Repair, Replacement and Rehabilitation Plan for the Bayou Chevee Shoreline Protection Project (PO-22) (PDF)OMM Plan5/5/2004
BA-23 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-22 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-17 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-27 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-09 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-28 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
BS-03a 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-17 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-09 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-27 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
MR-06 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-16 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-22 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-13 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-06 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-21 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-31 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-12 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
BA-28 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-11b 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-18 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-23 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-24 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-28-1 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-30 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-11 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-14 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-20 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-24 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-26 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-27 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-41 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-44 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-03 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-18 Project Completion Report As Built Drawings (PDF)Project Completion Report4/22/2004
TE-22 Comprehensive Monitoring Report Part 1 of 2 (PDF)Comprehensive Monitoring Report4/5/2004
TE-22 Comprehensive Monitoring Report Part 2 of 2 (PDF)Comprehensive Monitoring Report4/5/2004
ME-21 Environmental Assessment (PDF)EA or EIS and Ecological Review4/2/2004
TV-18 Project Completion Report (PDF)Project Completion Report4/1/2004
Biological Monitoring Section Standard Operating Procedures (PDF)Project Report3/15/2004
BA-38 Environmental Assessment 2004 (PDF)Environmental Assessment3/1/2004
Barataria Barrier Island Complex: Pelican Island and Pass La Mer to Chaland Pass Restoration Environmental Protection (BA-0038) (PDF)BID DOCUMENTS2/6/2004
TE-41 Project Completion Report (As-Built) (PDF)Project Completion Report2/5/2004
TE-41 Project Completion Report (PDF)Project Completion Report2/1/2004
BA-27d Environmental Assessment (PDF)EA or EIS and Ecological Review2/1/2004
TE-28 Brady Canal Maintenance Project Levee Refurbishment along the West Bank of Jug Lake (PDF)Project Completion Report1/28/2004
ME-09 Summary Data and Graphics (PDF)Summary Data and Graphics1/27/2004
TV-11b Ecological Review (PDF)EA or EIS and Ecological Review1/22/2004
BA-27d Wetland Value Assessment (PDF)WVA Pre-Design1/7/2004
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Geotechnical Investigation (PDF)GEOTECHNICAL REPORT12/23/2003
BA-38 Environmental Assessment 2003 (PDF)Environmental Assessment12/22/2003
BA-20 Project Completion Report (Construction Unit 3) (PDF)Project Completion Report12/16/2003
BA-38 Wetland Value Assessment (PDF)WVA Pre-Design12/8/2003
CS-27 Summary Data and Graphics (PDF)OM&M Report12/8/2003
BA-38 Ecological Review (PDF)EA or EIS and Ecological Review12/3/2003
BS-03a Annual Report 2003 (PDF)OM&M Report12/1/2003
BA-20 Project Completion Report As-Built Plans (PDF)Project Completion Report12/1/2003
CS-17 Comprehensive Monitoring Report (PDF)OM&M Report12/1/2003
Timbalier Island Dune and Marsh Creation Bid Package (PDF)BID DOCUMENTS12/1/2003
Timbalier Island Dune and Marsh Creation Bid Package (PDF)BID DOCUMENTS12/1/2003
Timbalier Island Dune and Marsh Creation Bid Package (PDF)BID DOCUMENTS12/1/2003
TV-16 Summary Data and Graphics (PDF)OM&M Report11/18/2003
CS-22 Summary Data and Graphics (PDF)OM&M Report11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
TE-28 Summary Data and Graphics part 1 of 3 (PDF)Summary Data and Graphics11/10/2003
TE-28 Summary Data and Graphics part 2 of 3 (PDF)Summary Data and Graphics11/10/2003
TE-28 Summary Data and Graphics part 3 of 3 (PDF)Summary Data and Graphics11/10/2003
Chaland Headland 95% Plans (PDF)DESIGN REPORT11/7/2003
Pelican 95% Plans (PDF)DESIGN REPORT11/7/2003
CS-11b Summary Data and Graphics (PDF)OM&M Report11/3/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
Report of Geotechnical Investigation Barataria Barrier Island Restoration Complex Project BA-38 Chaland and Pelican Headlands (PDF)GEOTECHNICAL REPORT10/30/2003
TE-45 Ecological Review (PDF)EA or EIS and Ecological Review10/28/2003
Pecan Island Terracing Geotechnical Report (PDF)GEOTECHNICAL REPORT10/28/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
TV-18 Ecological Review (PDF)EA or EIS and Ecological Review10/9/2003
CS-23 Summary Data and Graphics (PDF)OM&M Report10/1/2003
BA-37 Environmental Assessment (PDF)EA or EIS and Ecological Review10/1/2003
ME-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
ME-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-03 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-10 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-11 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-12 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-13 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-24 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-26 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-10 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-32a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-34 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-39 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-41 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-43 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-44 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-45 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TV-11b General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TV-15 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TV-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-22 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
AT-04 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-03c General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-04c General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-27c General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-28 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-30 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-33 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BS-03a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BS-10 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BS-11 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
CS-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
CS-29 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
CS-32 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
LA-03a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
ME-11 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-41 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-43 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-44 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-45 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-39 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-32a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-34 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-26 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TV-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TV-15 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TV-11b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-10 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-03 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
ME-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
ME-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-10 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-11 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-12 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-13 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-27c General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-28 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-33 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-03c General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-04c General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
AT-04 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
ME-11 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
CS-29 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
CS-32 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
LA-03a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BS-03a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BS-10 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BS-11 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
CS-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-37 Ecological Review (PDF)EA or EIS and Ecological Review9/25/2003
CS-18 Summary Data and Graphics (PDF)OM&M Report9/25/2003
BA-20 Summary Data and Graphics (PDF)OM&M Report9/22/2003
CS-30 Summary Data and Graphics (PDF)OM&M Report9/8/2003
BA-03c Summary Data and Graphics (PDF)Summary Data and Graphics9/8/2003
Brady Canal Hydrologic Restoration (TE-28) Modifications As-Built Drawings (PDF)AS-BUILT9/4/2003
BS-03a Annual Report 2002 (PDF)OM&M Report9/1/2003
TE-29 Supplemental Monitoring (PDF)Contract Studies/Data Collection Report9/1/2003
ME-14 Project Completion Report As-Built Drawings (PDF)Project Completion Report9/1/2003
ME-13 Summary Data and Graphics (PDF)OM&M Report8/26/2003
CS-31 Summary Data and Graphics (PDF)Summary Data and Graphics8/26/2003
BS-11 Monitoring Plan (PDF)OMM Plan8/20/2003
ME-09 Summary Data and Graphics (PDF)OM&M Report8/20/2003
MR-03 Monitoring Plan (PDF)OMM Plan8/20/2003
MR-06 Monitoring Plan (PDF)OMM Plan8/14/2003
MR-09 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-16 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-06 Monitoring Plan (PDF)OMM Plan8/14/2003
ME-11 Monitoring Plan (PDF)OMM Plan8/14/2003
ME-09 Monitoring Plan (PDF)OMM Plan8/14/2003
ME-13 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-17 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-18 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-22 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-22 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-23 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-26 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-28 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-04 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-09 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-14 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-12 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-16 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-17 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-11b Monitoring Plan (PDF)OMM Plan8/14/2003
CS-09 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-18 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-20 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-30 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-27 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-28-1 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-23 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-22 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-24 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-25 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-20 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-28 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-22 Monitoring Plan (PDF)OMM Plan8/14/2003
BS-03a Monitoring Plan (PDF)OMM Plan8/14/2003
AT-03 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-02 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-28 2003 Project Completion Report (PDF)Project Completion Report8/12/2003
ME-11 Project Completion Report (PDF)Project Completion Report8/12/2003
ME-19 Monitoring Plan (PDF)OMM Plan8/7/2003
MR-09 Summary Data and Graphics Part 1 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 2 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 3 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 4 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 5 of 5 (PDF)Summary Data and Graphics8/4/2003
BA-19 Monitoring Plan (PDF)OMM Plan8/1/2003
BA-23 Monitoring Plan (PDF)OMM Plan8/1/2003
CS-32 Ecological Review (PDF)EA or EIS and Ecological Review7/11/2003
CS-29 Ecological Review (PDF)EA or EIS and Ecological Review7/9/2003
BA-23 2001 Project Completion Report (PDF)Project Completion Report7/1/2003
BA-27 Project Completion Report (PDF)Project Completion Report7/1/2003
PO-06 2005 Project Completion Report (PDF)Project Completion Report7/1/2003
TV-15 Environmental Assessment (PDF)Environmental Assessment7/1/2003
TE-45 Environmental Assessment (PDF)EA or EIS and Ecological Review7/1/2003
PO-24 Environmental Assessment (PDF)EA or EIS and Ecological Review7/1/2003
PO-24 Project Completion Report As-Built Drawings (PDF)Project Completion Report7/1/2003
LA-03b Nutria Harvest Distribution 2002-2003 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2003 (PDF)OM&M Report6/30/2003
BA-04c Summary Data and Graphics (PDF)Summary Data and Graphics6/25/2003
PO-22 Summary Data and Graphics (PDF)OM&M Report6/23/2003
CS-31 Monitoring Plan (PDF)Monitoring Plan6/11/2003
BA-23 Summary Data and Graphics (PDF)Summary Data and Graphics6/3/2003
PO-27 Summary Data and Graphics (PDF)OM&M Report6/3/2003
PO-06 Summary Data and Graphics (PDF)OM&M Report6/3/2003
PO-29 Ecosystem Health of the Maurepas Swamp: Feasibility and Projected Benefits of a Freshwater Diversion (PDF)Feasibility Study Report6/1/2003
A Contractor's Guide to Minimum Standards Required by the Louisiana Department of Natural Resources, Coastal Restoration Division (PDF)Project Report6/1/2003
Pelican Island 30% Design Report and Appendices (Zipped file)DESIGN REPORT6/1/2003
Caminada Headlands 30% Design Report and Appendices (PDF)DESIGN REPORT6/1/2003
PO-17 Summary Data and Graphics (PDF)OM&M Report5/23/2003
West Lake Boudreaux Shoreline Protection and Marsh Creation Geotechnical Investigation (PDF)GEOTECHNICAL REPORT5/23/2003
West Lake Boudreaux Shoreline Protection and Marsh Creation Geotechnical Investigation (PDF)GEOTECHNICAL REPORT5/23/2003
West Lake Boudreaux Shoreline Protection and Marsh Creation Geotechnical Investigation (PDF)GEOTECHNICAL REPORT5/23/2003
MR-06 Summary Data and Graphics (PDF)OM&M Report5/5/2003
Plans of Proposed TE-26 Lake Chapeau Warning Buoy Replacement (PDF)AS-BUILT5/1/2003
Office of Coastal Restoration and Management Quality Management Plan: 2008 (PDF)Project Report4/30/2003
TV-12 Project Completion Report (PDF)OM&M Report4/28/2003
BA-37 Geotechnical Investigation Part 2 of 2 (PDF)Contract Studies/Data Collection Report4/4/2003
BA-37 Geotechnical Investigation - Part 1 of 2 (PDF)Contract Studies/Data Collection Report4/4/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
ME-19 Ecological Review (PDF)EA or EIS and Ecological Review3/11/2003
TV-18 Environmental Assessment (PDF)Environmental Assessment3/1/2003
TE-40 Ecological Review (PDF)EA or EIS and Ecological Review2/17/2003
ME-04 Progress Report 5 (PDF)OM&M Report1/22/2003
BA-27 CU2 Project Completion Report (PDF)Project Completion Report1/8/2003
BS-03a Project Completion Report (PDF)Project Completion Report1/8/2003
BA-27c (CU2) Project Completion Report (PDF)Project Completion Report1/8/2003
Geotechnical Study (Part II of II) Gulf Shoreline Stabilization Project Rockefeller Refuge, Cameron Parish, Louisiana (PDF)GEOTECHNICAL REPORT1/7/2003
BS-11 Ecological Assessment (PDF)EA or EIS and Ecological Review1/1/2003
BS-11 Environmental Assessment (PDF)Environmental Assessment1/1/2003
A Proposed Coast-Wide Reference Monitoring System for Evaluating Wetland Restoration Trajectories in Louisiana (PDF)Project Report1/1/2003
CWPPRA Adaptive Management: Assessment of Five Barrier Island Restoration Projects in Louisiana (PDF)General Programmatic Document1/1/2003
Chaland Headland and Pelican Island Barrier Shoreline Restoration - Borrow Area Impact Analysis (PDF)DESIGN REPORT1/1/2003
CS-24 Summary Data and Graphics (PDF)OM&M Report12/30/2002
ME-04 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
CS-20 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TE-28 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TV-04 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
PO-17 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
AT-02 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TE-26 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
BA-15 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TV-04 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
ME-09 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TV-03 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
CS-22 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TE-40 Environmental Assessment (PDF)EA or EIS and Ecological Review12/21/2002
TE-28 Adaptive Management Review Final Report (PDF)Adaptive Management Review12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
BA-27c (CU2) Project Completion Report (As-Built) (PDF)Project Completion Report12/2/2002
TV-04 Summary Data and Graphics Part 1 of 2 (PDF)Summary Data and Graphics12/2/2002
TV-04 Summary Data and Graphics Part 2 of 2 (PDF)Summary Data and Graphics12/2/2002
TE-43 Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
North Lake Mechant Landbridge Restoration Geotechnical Investigation (PDF)GEOTECHNICAL REPORT10/31/2002
TV-13a Project Completion Report (PDF)Project Completion Report10/1/2002
AT-02 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
AT-03 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-02 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-15 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-23 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-26 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-27d General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-35 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-36 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-37 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-38 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-04a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-11b General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-21 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-22 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-23 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-24 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-25 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-28 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-30 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-31 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
LA-03b General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-04 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-13 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-14 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-21 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
MR-06 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-06 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-16 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-29 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-22 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-23 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-24 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-25 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-26 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-28 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-29 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-30 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-36 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-46 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-47 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-48 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-03 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-04 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-12 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-13a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-14 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-16 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-20 General Programmatic Document (PDF)Project Report10/1/2002
ME-04 General Programmatic Document (PDF)Project Report10/1/2002
ME-09 General Programmatic Document (PDF)Project Report10/1/2002
TE-26 General Programmatic Document (PDF)Project Report10/1/2002
CS-11b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-21 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-25 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-28 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
LA-03b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-04a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-31 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-13 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-14 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-04 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
AT-02 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
AT-03 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-02 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-15 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-26 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-27d General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-35 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-36 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-37 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-38 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-21 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
MR-06 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-06 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-25 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-26 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-28 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-29 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-12 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-13a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-14 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-03 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-04 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-29 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-36 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-46 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-47 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-48 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-03 Adaptive Management Review Final Report (PDF)Adaptive Management Review9/23/2002
BA-04 Adaptive Management Review Final Report (PDF)Adaptive Management Review9/23/2002
LA-03b Monitoring Plan (PDF)OMM Plan9/10/2002
TV-03 Adaptive Management Review Final Report (PDF)Adaptive Management Review9/5/2002
LA-03b Environmental Assessment (PDF)EA or EIS and Ecological Review9/1/2002
CS-31 Monitoring Plan (2013 Update) (PDF)Monitoring Plan8/28/2002
BA-19 General Programmatic Document (PDF)Project Report8/15/2002
Geotechnical Study (Part I of II) Gulf Shoreline Stabilization Project Rockefeller Refuge, Cameron Parish, Louisiana (PDF)GEOTECHNICAL REPORT8/13/2002
TE-26 Operations and Maintenance Plan 2002 (PDF)Project Report8/8/2002
BA-15 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report8/8/2002
TE-26 Monitoring Report (PDF)Monitoring Report8/8/2002
TE-26 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report8/8/2002
BA-03c Contracted Study Report (PDF)Contract Studies/Data Collection Report8/7/2002
LA-03b Ecological Review (PDF)EA or EIS and Ecological Review8/1/2002
BA-27c Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report7/31/2002
BA-27 2002 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report7/31/2002
Operation, Maintenance, and Rehabilitation Plan for the BA-27 - Barataria Land Bridge Shoreline Protection Phase 1 & 2 (Construction Unit No. 1) (PDF)OMM Plan7/31/2002
BA-02 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report7/30/2002
BA-02 Project Completion Report (PDF)Project Completion Report7/26/2002
TV-03 Adaptive Management Review (PDF)General Programmatic Document7/25/2002
TV-04 Adaptive Management Review - Shoreline Component (PDF)General Programmatic Document7/23/2002
TE-26 Adaptive Management Review (PDF)General Programmatic Document7/23/2002
AT-02 Adaptive Management Review (PDF)General Programmatic Document7/23/2002
TE-28 Adaptive Management Review (PDF)General Programmatic Document7/22/2002
ME-09 Adaptive Management Review Final Report (PDF)General Programmatic Document7/19/2002
TV-04 Adaptive Management Review - Hydrologic Restoration component (PDF)General Programmatic Document7/19/2002
BA-15 Adaptive Management Review Final Report (PDF)General Programmatic Document7/19/2002
PO-17 Adaptive Management Review Final Report (PDF)General Programmatic Document7/9/2002
CS-20 Adaptive Management Review Final Report (PDF)General Programmatic Document7/8/2002
TV-16 Project Completion Report (PDF)Project Completion Report7/5/2002
CS-22 Adaptive Management Review Final Report (PDF)General Programmatic Document7/2/2002
CS-19 Close-Out Report (PDF)OM&M Report7/1/2002
TE-41 Ecological Review (PDF)EA or EIS and Ecological Review7/1/2002
ME-04 Adaptive Management Review (PDF)General Programmatic Document7/1/2002
ME-04 TV-11 2002 Project Completion Report (PDF)Project Completion Report6/20/2002
ME-04 2002 Completion Report for Maintenance/Repair (PDF)Project Completion Report6/20/2002
TE-44 Construction Unit 1 Ecological Review (PDF)EA or EIS and Ecological Review6/1/2002
CS-28-1 Project Completion Report (PDF)Project Completion Report5/8/2002
CS-28-1 2008 Project Completion Report (PDF)Project Completion Report5/8/2002
TE-22 Monitoring Report (PDF)Monitoring Report4/24/2002
TE-22 Operations and Maintenance Plan 2002 (PDF)Project Report4/24/2002
TE-22 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report4/24/2002
BA-23 Project Completion Report As-Built Drawings (PDF)Project Completion Report4/8/2002
CS-09 Hydrodynamic Modeling (PDF)Contract Studies/Data Collection Report3/1/2002
TE-28 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report2/14/2002
TE-28 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report2/14/2002
TE-28 2002 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report2/14/2002
Operation, Maintenance, and Rehabilitation Plan for the Brady Canal Hydrologic Restoration Project TE-28 (PDF)OM&M Report2/14/2002
ME-09 Comprehensive Monitoring Report 2 (PDF)OM&M Report2/1/2002
BA-15 Comprehensive Monitoring Report 1 (PDF)OM&M Report2/1/2002
CS-27 Project Completion Report (PDF)Project Completion Report1/28/2002
CS-27 2006/2007 Annual Inspection Report (PDF)Inspection Report1/28/2002
ME-14 Environmental Assessment (PDF)Environmental Assessment1/1/2002
TV-14 Project Completion Report (PDF)Project Completion Report12/19/2001
BA-27c Project Completion Report (PDF)Project Completion Report11/30/2001
BA-02 CU2 Project Completion Report - As-Built Drawings (PDF)Project Completion Report11/28/2001
BA-20 Project Completion Report (PDF)Project Completion Report11/9/2001
BA-38-2 Project Completion Report (PDF)Project Completion Report11/1/2001
BA-37 Wetland Value Assessment (PDF)WVA Pre-Design10/1/2001
BA-27c (CU1) Project Completion Report (As-Built) (PDF)Project Completion Report9/28/2001
BA-26 Project Completion Report (AS-BUILT) (PDF)Project Completion Report9/28/2001
BA-26 2001 Project Completion Report (PDF)Project Completion Report9/26/2001
BS-11 Ecological Review (PDF)EA or EIS and Ecological Review9/1/2001
TV-04 2001 Project Completion Report (PDF)Project Completion Report8/14/2001
CS-18 Comprehensive Monitoring Report 2 (PDF)OM&M Report8/1/2001
PO-06 2001 Project Completion Report (PDF)Project Completion Report6/27/2001
CS-22 Comprehensive Monitoring Report (PDF)OM&M Report6/1/2001
PO-29 Report on Maurepas Restoration Project Report on Maurepas Restoration Project (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment A - Draft Project Development Plan January 6, 2000 (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment B - Site maps (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment C Draft Hydrologic Modeling May 30, 2001 (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment D Cost Estimates (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment E Draft Swamp Ecology (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment F Draft Water Quality Analysis (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment G WVA Revised Project Information Sheet May 2001 (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Wetland Value Assessment Community Model (PDF)Project Report6/1/2001
TE-37 Monitoring Plan (PDF)OMM Plan5/29/2001
TE-28 2001 Project Completion Report (PDF)Project Completion Report5/16/2001
CS-11b Project Completion Report (PDF)Project Completion Report5/16/2001
BA-19 Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report5/1/2001
PO-27 Monitoring Plan (PDF)OMM Plan4/4/2001
Monitoring Progress Report No. 1, For the Period February 14, 1998 to August 25, 1999 Whiskey Island Restoration (PDF)OM&M Report4/1/2001
PO-25 Feasibility Study Report Part 1 of 2 (PDF)Feasibility Study Report4/1/2001
PO-25 Feasibility Study Report Part 2 of 2 (PDF)Feasibility Study Report4/1/2001
AT-02 Progress Report No. 1 (PDF)Progress Report3/1/2001
PO-22 Project Completion Report (PDF)Project Completion Report1/22/2001
TE-37 Environmental Assessment (PDF)EA or EIS and Ecological Review1/10/2001
CS-19 Comprehensive Monitoring Report 2 (PDF)Monitoring Report1/1/2001
CS-19 Close-Out Monitoring Report (PDF)OM&M Report1/1/2001
TE-37 Ecological Review (PDF)EA or EIS and Ecological Review12/1/2000
PO-28 Ecological Review (PDF)EA or EIS and Ecological Review12/1/2000
TE-18 Progress Report 6 (PDF)OM&M Report12/1/2000
BA-20 Wetland Value Assessment (PDF)WVA Pre-Design11/2/2000
CS-27 Environmental Assessment (PDF)Environmental Assessment11/1/2000
Black Bayou Hydrologic Restoration Environmental Assessment (PDF)Environmental Assessment11/1/2000
Brady Canal Hydrologic Restoration Construction Unit 2 As-Builts (PDF)AS-BUILT10/24/2000
BS-11 Wetland Value Assessment (PDF)WVA Pre-Design10/3/2000
Quality management plan for Coastal Wetlands Planning, Protection, and Restoration Act monitoring program (PDF)Project Report6/1/2000
TE-17 Comprehensive Monitoring Report (PDF)OM&M Report6/1/2000
TE-10 Monitoring Plan (PDF)OMM Plan5/23/2000
CS-20 2000 Comprehensive Monitoring Report (PDF)OM&M Report5/1/2000
CS-20 Progress Report 4 (PDF)OM&M Report5/1/2000
BA-04c Progress Report 3 (PDF)Progress Report5/1/2000
TE-23 Project Completion Report (PDF)Project Completion Report3/15/2000
TE-36 Progress Report 1 (PDF)OM&M Report3/1/2000
BA-15 Progress Report 1 (PDF)OM&M Report3/1/2000
BA-03c Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report2/24/2000
BA-03c Progress Report 2 (PDF)Progress Report2/24/2000
TE-25 and TE-30 Project Completion Report (PDF)Project Completion Report2/1/2000
TE-25 and TE-30 Project Completion Report (PDF)Project Completion Report2/1/2000
TE-25 and 30 Project Completion Report As-Built Drawings (PDF)Project Completion Report1/15/2000
TE-25 and 30 Project Completion Report As-Built Drawings (PDF)Project Completion Report1/15/2000
ME-13 Progress Report 1 (PDF)OM&M Report1/11/2000
MR-06 Progress Report 1 (PDF)OM&M Report12/1/1999
ME-19 Wetland Value Assessment (PDF)WVA Pre-Design10/4/1999
TE-29 Progress Report 1 (PDF)OM&M Report8/1/1999
TE-22 Phase 3 Environmental Assessment (PDF)Environmental Assessment8/1/1999
BA-03c / BA-26 Monitoring Plan (PDF)Monitoring Plan6/16/1999
BA-03c / BA-26 Monitoring Plan (PDF)Monitoring Plan6/16/1999
PO-17 Progress Report 5 (PDF)OM&M Report4/1/1999
Whiskey Island Restoration Vegetation Plantings As-Built (PDF)AS-BUILT4/1/1999
TE-36 Monitoring Plan (PDF)OMM Plan3/1/1999
TV-12 Project Completion Report (PDF)Project Completion Report1/1/1999
TE-28 CU1 Project Completion Report (Pre-Construction Plans) (PDF)Project Completion Report1/1/1999
TE-28 CU2 Project Completion Report (Pre-Construction Plans) (PDF)Project Completion Report1/1/1999
A Survey of Nutria Herbivory Damage in Coastal Louisiana in 1998 (PDF)Program Report12/31/1998
TE-20 and TE-24 As-Built Drawings (PDF)Project Completion Report12/16/1998
TE-20 and TE-24 As-Built Drawings (PDF)Project Completion Report12/16/1998
AT-02 Engineering Closure Report (PDF)General Programmatic Document12/1/1998
AT-02 Engineering Closure Report (PDF)General Programmatic Document12/1/1998
TE-29 Wave Height Measurements - September 1998 (PDF)Contract Studies/Data Collection Report11/20/1998
TE-29 Wave Height Measurements - July 1998 (PDF)Contract Studies/Data Collection Report9/25/1998
TE-27 Project Completion Report (As-Built) (PDF)Project Completion Report9/15/1998
TV-09 Comprehensive Monitoring Report (PDF)OM&M Report9/1/1998
BA-25 Evaluation Report Part 2 (PDF)Evaluation Report9/1/1998
BA-25 Evaluation Report Part 1 (PDF)Evaluation Report9/1/1998
TV-09 Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report9/1/1998
TV-12 Environmental Assessment (PDF)Environmental Assessment8/1/1998
Whiskey Island Restoration Vegetation Plantings (PDF)BID DOCUMENTS8/1/1998
TE-29 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-30 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-27 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-24 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-20 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-18 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-17 Monitoring Plan (PDF)OMM Plan7/23/1998
PO-20 Monitoring Plan (PDF)OMM Plan7/23/1998
MR-08 Monitoring Plan (PDF)OMM Plan7/23/1998
ME-12 Monitoring Plan (PDF)OMM Plan7/23/1998
BA-15 Monitoring Plan (PDF)OMM Plan7/23/1998
CS-21 Monitoring Plan (PDF)OMM Plan7/23/1998
CS-19 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-25 Monitoring Plan (PDF)OMM Plan7/15/1998
BA-19 Progress Report 2 (PDF)Progress Report7/14/1998
CS-20 Progress Report 3 (PDF)OM&M Report6/15/1998
TE-18 Progress Report 5 (PDF)OM&M Report6/10/1998
CS-26 Monitoring Plan (PDF)OMM Plan6/8/1998
PO-18 Progress Report 1 (PDF)OM&M Report6/1/1998
ME-12 Closeout Monitoring Report (PDF)OM&M Report6/1/1998
LA-03a Monitoring Plan (PDF)OMM Plan5/6/1998
TE-25 Environmental Assessment (PDF)EA or EIS and Ecological Review5/1/1998
TE-22 Progress Report 1 (PDF)OM&M Report4/29/1998
TE-23 Project Completion Report Maintenance Dredging As-Built Drawings (PDF)Project Completion Report4/17/1998
TE-27 Geotechnical Report (PDF)Contract Studies/Data Collection Report4/14/1998
PO-16 Progress Report 3 (PDF)OM&M Report4/8/1998
PO-17 Comprehensive Monitoring Report (PDF)OM&M Report4/1/1998
TE-29 Wave Height Measurements - March 1998 (PDF)Contract Studies/Data Collection Report4/1/1998
BA-04c Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report4/1/1998
Whiskey Island Restoration Vegetation Plantings Plan Set (PDF)BID DOCUMENTS3/30/1998
CS-22 Progress Report 1 (PDF)OM&M Report3/5/1998
TE-25 and TE-30 Pre-Construction Plans (PDF)Project Completion Report2/26/1998
TE-25 and TE-30 Pre-Construction Plans (PDF)Project Completion Report2/26/1998
TV-03 Progress Report 3 (PDF)OM&M Report2/16/1998
ME-04 Progress Report 4 (PDF)OM&M Report1/28/1998
CS-17 Progress Report 1 (PDF)OM&M Report1/24/1998
TE-27 Pre-Construction Plans (PDF)Project Completion Report1/7/1998
BA-19 Progress Report 1 (PDF)Progress Report1/6/1998
CS-18 Comprehensive Monitoring Report 1 Part 1 (PDF)OM&M Report1/1/1998
CS-18 Comprehensive Monitoring Report 1 Whole report (PDF)Comprehensive Monitoring Report1/1/1998
CS-18 Comprehensive Monitoring Report 1 Part 2 (PDF)Comprehensive Monitoring Report1/1/1998
BA-27 Wetland Value Assessment (PDF)Wetland Value Assessment12/19/1997
BA-27c Wetland Value Assessment (PDF)WVA Pre-Design12/19/1997
BA-02 Project Completion Report - As-Built Plans (PDF)Project Completion Report12/15/1997
CS-19 Comprehensive Monitoring Report 1 (PDF)OM&M Report12/1/1997
TE-26 Environmental Assessment (PDF)Environmental Assessment12/1/1997
BA-28 Wetland Value Assessment (PDF)WVA Pre-Design11/1/1997
TE-29 Contracted Study Report - October 1997 (PDF)Contract Studies/Data Collection Report10/25/1997
TE-26 Coring and Sediment Analysis (PDF)Contract Studies/Data Collection Report9/12/1997
TE-20 and TE-24 Project Completion Report (Pre-Construction Plans) (PDF)Project Completion Report9/8/1997
TE-27 Addendum to the Environmental Assessment (PDF)EA or EIS and Ecological Review8/19/1997
TV-09 Progress Report 4 (PDF)OM&M Report8/13/1997
ME-09 Comprehensive Monitoring Report 1 (PDF)OM&M Report7/1/1997
CS-20 Progress Report 2 (PDF)OM&M Report6/23/1997
ME-09 Progress Report 3 (PDF)OM&M Report6/13/1997
TE-18 Progress Report 4 (PDF)OM&M Report6/8/1997
BA-15 Phase 2 Environmental Assessment (PDF)Environmental Assessment6/1/1997
ME-12 Progress Report 2 (PDF)OM&M Report5/21/1997
PO-16 Progress Report 2 (PDF)OM&M Report5/5/1997
TV-09 Progress Report 3 (PDF)OM&M Report4/22/1997
PO-17 Progress Report 4 (PDF)OM&M Report4/17/1997
CS-19 Progress Report 4 (PDF)OM&M Report4/1/1997
CS-31 Preliminary Feasibility Report (PDF)Feasibility Study Report4/1/1997
CS-22 Project Completion Report (PDF)Project Completion Report3/18/1997
TV-03 Progress Report 2 (PDF)OM&M Report3/4/1997
ME-04 Progress Report 3 (PDF)OM&M Report2/12/1997
ME-12 Progress Report 1 (PDF)OM&M Report12/30/1996
PO-16 Progress Report 1 (PDF)OM&M Report12/19/1996
CS-20 Progress Report 1 (PDF)OM&M Report12/16/1996
CS-19 Progress Report 3 (PDF)OM&M Report12/9/1996
TE-18 Progress Report 3 (PDF)OM&M Report11/26/1996
TV-03 Progress Report 1 (PDF)OM&M Report11/26/1996
ME-08 Comprehensive Monitoring Report No. 1 (PDF)OM&M Report11/1/1996
TE-29 Project Completion Report - As-Built Plans (PDF)Project Completion Report11/1/1996
PO-17 Progress Report 3 (PDF)OM&M Report10/17/1996
BA-02 Wetland Value Assessment (PDF)WVA Pre-Design8/28/1996
TE-26 Geotechnical Investigation (PDF)Contract Studies/Data Collection Report7/9/1996
BA-15 Phase 1 Environmental Assessment (PDF)Environmental Assessment7/1/1996
CS-19 Progress Report 2 (PDF)OM&M Report6/26/1996
ME-04 Progress Report 2 (PDF)OM&M Report6/24/1996
CS-18 Progress Report 3 (PDF)OM&M Report6/18/1996
TE-18 Progress Report 2 (PDF)OM&M Report6/3/1996
AT-02 Environmental Assessment (PDF)Environmental Assessment6/1/1996
AT-03 Environmental Assessment (PDF)Environmental Assessment6/1/1996
BA-04c Monitoring Plan (PDF)Monitoring Plan5/15/1996
ME-09 Progress Report 2 (PDF)OM&M Report5/8/1996
PO-17 Progress Report 2 (PDF)OM&M Report5/6/1996
BA-04c Progress Report 2 (PDF)Progress Report4/25/1996
TV-09 Progress Report 2 (PDF)OM&M Report3/27/1996
CS-17 Wetland Value Assessment (PDF)WVA Pre-Design2/27/1996
TV-03 Project Completion Report (PDF)Project Completion Report2/13/1996
TE-28 Environmental Assessment (PDF)EA or EIS and Ecological Review2/1/1996
CS-18 Progress Report 4 (PDF)OM&M Report1/27/1996
CS-18 Progress Report 2 (PDF)OM&M Report1/11/1996
Soil Borings and Laboratory Tests Sand Source Borings Isle Dernieres Restoration Project East and Trinity Islands (PDF)GEOTECHNICAL REPORT1/8/1996
Soil Borings and Laboratory Tests Sand Source Borings Isle Dernieres Restoration Project East and Trinity Islands (PDF)GEOTECHNICAL REPORT1/8/1996
TV-09 Project Completion Report (PDF)Project Completion Report1/1/1996
BA-04c Monitoring Report (PDF)Monitoring Report1/1/1996
PO-17 Progress Report 1 (PDF)OM&M Report10/24/1995
TV-09 Progress Report 1 (PDF)OM&M Report10/17/1995
ME-04 Progress Report 1 (PDF)OM&M Report10/9/1995
BA-03c Progress Report 1 (PDF)Progress Report10/4/1995
CS-18 Progress Report 1 (PDF)OM&M Report9/21/1995
BA-04c Progress Report 1 (PDF)Progress Report9/21/1995
ME-08 Progress Report 1 (PDF)OM&M Report9/19/1995
TE-18 Progress Report 1 (PDF)OM&M Report9/19/1995
ME-09 Progress Report 1 (PDF)OM&M Report9/18/1995
CS-19 Progress Report 1 (PDF)OM&M Report9/18/1995
CS-11b WVA Pre-Design (PDF)WVA Pre-Design9/7/1995
Coastal Protection and Restoration Authority Bid Plans for Queen Bess (BA-0019) (PDF)BID DOCUMENTS6/15/1995
ME-04 Project Completion Report (PDF)Project Completion Report4/27/1995
TE-22 Phase 1 Environmental Assessment (PDF)Environmental Assessment3/1/1995
BA-23 Wetland Value Assessment Pre-Design (PDF)WVA Pre-Design1/17/1995
ME-08 Monitoring Plan (PDF)OMM Plan9/12/1994
TE-29 WVA Pre-Design (PDF)WVA Pre-Design8/8/1994
BA-03C Wetland Value Assessment (PDF)Wetland Value Assessment7/6/1994
PO-17 Project Completion Report (PDF)Project Completion Report4/29/1994
Final Engineering Report for Isles Dernieres Restoration Project: Phase 0 - Eastern Isle Dernieres and Phase 1 - Trinity Island (PDF)DESIGN REPORT3/31/1994
Final Engineering Report for Isles Dernieres Restoration Project: Phase 0 - Eastern Isle Dernieres and Phase 1 - Trinity Island (PDF)DESIGN REPORT3/31/1994
Final Engineering Report for Isles Dernieres Restoration Project: Phase 0 - Eastern Isle Dernieres and Phase 1 - Trinity Island (PDF)DESIGN REPORT3/31/1994
TE-28 WVA Pre-Design (PDF)WVA Pre-Design1/1/1994
Subsoil Investigation Isle Dernieres Restoration Eastern Isle Derniere and Trinity Island (PDF)GEOTECHNICAL REPORT11/24/1993
Subsoil Investigation Isle Dernieres Restoration Eastern Isle Derniere and Trinity Island (PDF)GEOTECHNICAL REPORT11/24/1993
BA-02 Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report11/1/1993
TE-32a (TE-07) Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report10/19/1993
CS-04a WVA Pre-Design (PDF)WVA Pre-Design9/8/1993
PO-17 (PO-03a) Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report6/5/1993
BA-04 Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report3/30/1993
PO-17 Executive Summary (PDF)General Programmatic Document1/1/1993
BS-04a Feasibility Report (PDF)Feasibility Study Report12/31/1992
CS-11b Feasibility Study (PDF)Feasibility Study Report10/1/1992
CS-21 WVA Pre-Design (PDF)WVA Pre-Design9/11/1992
CS-21 Wetland Value Assessment (PDF)Wetland Value Assessment9/11/1992
CS-22 WVA Pre-Design (PDF)WVA Pre-Design8/28/1992
BS-03A WVA Pre-Design (PDF)WVA Pre-Design8/18/1992
CS-20 WVA Pre-Design (PDF)WVA Pre-Design8/12/1992
AT-03 WVA Pre-Design (PDF)WVA Pre-Design6/29/1992
AT-02 WVA Pre-Design (PDF)WVA Pre-Design6/29/1992
BS-03A Feasibility Report (PDF)Feasibility Study Report5/1/1992
PO-17 Feasibility Report- Draft (PDF)Feasibility Study Report2/3/1992
CS-18 WVA Pre-Design (PDF)WVA Pre-Design11/14/1991
BA-02 Feasibility Report (PDF)Feasibility Study Report9/30/1991
BA-19 WVA Pre-Design (PDF)WVA Pre-Design9/30/1991
PO-17 (PO-3a) Project Plan Update (PDF)General Programmatic Document7/10/1991
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Grand Lake Shoreline Protection Tebo Point Bid Package (PDF)BID DOCUMENTS1/1/1900
Grand Lake Shoreline Protection Tebo Point Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Brady Canal Hydrologic Restoration Construction Unit 1 (PDF)AS-BUILT1/1/1900
TE-34 Floating Debris Barrier Brady Canal and Superior Canal As-Builts (PDF)AS-BUILT1/1/1900
River Reintroduction into Maurepas Swamp Project (PO-0029) Preliminary Operations, Maintenance, Monitoring, and Adaptive Management Plan (PDF)OMM Plan1/1/1900
PO-104 Change Order #1 (PDF)BID DOCUMENTS1/1/1900
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Pre-Bid Meeting Sign In Sheet (PDF)BID DOCUMENTS1/1/1900
2010 Annual Inspection Report Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF)Inspection Report1/1/1900

About This Site

The Louisiana Coastal Wetlands Planning Protection and Restoration Act Program web site contains information and links relating to coastal restoration projects in coastal Louisiana. This site is funded by CWPPRA and is maintained by the USGS National Wetlands Research Center.