Projects > Info

Caminada Headlands Back Barrier Marsh Creation (BA-171)

Priority Project List: 23
Sponsors: CPRA, EPA
Parishes: Lafourche

Reports

Caminada Headland Back Barrier Marsh Creation Project 95% Design ReportPDF2.2 MB
Appendix C: Geotechnical Investigation Data Report Caminada Headlands Back Barrier Marsh Creation ProjectPDF31.7 MB
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020PDF3.1 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF718.4 KB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF295.6 KB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF3.1 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF6.7 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF11.9 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF19.9 MB
BA-171 Landrights DocumentsPDF306.9 KB
BA-171 Landrights DocumentsPDF11.8 MB
BA-171 Landrights DocumentsPDF2.9 MB
BA-171 Landrights DocumentsPDF2.4 MB
BA-171 Landrights DocumentsPDF2.6 MB
BA-171 Landrights DocumentsPDF14.1 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF446.1 KB
BA-171 Landrights DocumentsPDF7.4 MB
BA-171 Landrights DocumentsPDF
BA-171 Landrights DocumentsPDF5.5 MB
BA-171 Landrights DocumentsPDF1.7 MB
BA-171 Annex B Monument Data SheetPDF139.8 KB
BA-171 Final Permit Mod 9-26-2019PDF
BA-171 Coastal Use PermitPDF49.3 KB
BA-171 Final Permit 6-18-19PDF1.5 MB
BA-171 Water Quality CertificationPDF306.7 KB
Draft Design Report Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193)PDF7.1 MB
BA-171 Bid Package Environmental DocumentsPDF4.6 MB
Geotechnical Engineering Report Caminada Headlands Back Barrier Marsh Creation Increment I (BA-171) Marsh Fill Settlement Re-EvaluationPDF2.3 MB
Final Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-0193)PDF
Final Geotechnical Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) Offshore Borrow InvestigationPDF
Survey Methodology Report Topographic and Magnetometer Surveys of the Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193)PDF
Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) Topographic, Bathymetric, and Magnetometer Surveys February - April 2017PDF15.9 MB
Section 4 Survey DrawingsPDF
Annex C NomogramPDF146.2 KB
Section 3 Survey Point DataPDF1.6 MB
Section 2 Survey Field NotesPDF
Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology ReportPDF297.9 KB
Annex A CPRA Maps and Scope of Services for Topographic, Bathymetric, Magnetometer, and Geophysical Surveys for Caminada Headlands Back Barrier Marsh Creation Project (BA-171)PDF3.6 MB
Project Manager's Technical Fact Sheet (HTML)html10.0 KB

Map

There are no maps associated with this project

Data

There is no data associated with this project

Wetland Value Assessment

  • Project Area (acres): 928
  • Average Annual Habitat Units*: 269
  • Acres Created / Restored: 379
  • Acres Protected: 0
  • Total Net Acres: 379

* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.