Projects > Info

Bayou Dupont Sediment Delivery System (BA-39)

Priority Project List: 12
Sponsors: CPRA, EPA
Parishes: Jefferson, Plaquemines

Reports

2013 Annual Inspection Report Mississippi Sediment Delivery System – Bayou DupontPDF21.5 MB
2016 Annual Inspection Report for Mississippi Sediment Delivery System – Bayou DupontPDF7.6 MB
2012 Annual Inspection Report Mississippi Sediment Delivery System – Bayou DupontPDF
2017 Annual Inspection Report for Mississippi Sediment Delivery System - Bayou DupontPDF17.8 MB
Monitoring Plan for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39)PDF878.0 KB
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System-Bayou Dupont (BA-0039)PDF5.4 MB
Bayou Dupont Sediment Delivery Marsh Creation Fact SheetPDF1.4 MB
Mississippi River Sediment Delivery System - Bayou Soil BoringsPDF923.0 KB
Geotechnical Investigation Data Report Mississippi River Sediment Delivery System - Bayou DupontPDF19.1 MB
Mississippi River Sediment Delivery System - Bayou Dupont Final Construction Fact SheetPDF23.1 KB
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report AppendicesPDF12.1 MB
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design ReportPDF1.2 MB
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Addendum 04PDF3.0 MB
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans Increment 2PDF10.7 MB
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Increment 2PDF
Mississippi River Sediment Delivery System - Bayou Dupont Bid PlansPDF11.5 MB
2013 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39)PDF
BA-39 Investigation of Potential Mississippi River Borrow AreasPDF
BA-39 Monitoring PlanPDF2.8 MB
BA-39 Final Design ReportPDF1.2 MB
BA-39 Project Completion ReportPDF8.0 MB
BA-39 Environmental AssessmentPDF10.7 MB
BA-39 Ecological ReviewPDF1.8 MB
BA-39 Review (Contracted Study Report)PDF34.1 KB
BA-39 2011 Annual Inspection ReportPDF520.6 KB
Project Manager's Technical Fact Sheet (HTML)html10.0 KB

Data

Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) Marsh Creation Areas 1 and 2, 2012 Digital Imagery
Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) Marsh Creation Areas 1 and 2, 2012 Digital Imagery
Download (ZIP 156.3 MB)
  • Product Id: 2013-02-0114
  • Type: Spatial Data
  • Created: 8/12/2013 4:16:00 PM
  • Modified: 8/15/2013
  • Contact: Matt Keller
  • Office: NWRC-GIS
  • Orientation:
  • Scale: Unknown
  • Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) Marsh Creation Areas 1 and 2, 2012 Digital Imagery
Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) 2012 Land-Water Classification Data
Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) 2012 Land-Water Classification Data
Download (ZIP 215.0 KB)
  • Product Id: 2013-02-0106
  • Type: Spatial Data
  • Created: 8/12/2013 2:59:00 PM
  • Modified: 8/14/2013
  • Contact: Matt Keller
  • Office: NWRC-GIS
  • Orientation:
  • Scale: Unknown
  • Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) 2012 Land-Water Classification Data

Wetland Value Assessment

  • Project Area (acres): 471
  • Average Annual Habitat Units*: 159
  • Acres Created / Restored: 326
  • Acres Protected: 0
  • Total Net Acres: 326

* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.