Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-23)
Priority Project List:
3
Parishes:
Cameron
Reports
2020 Operations, Maintenance, and Monitoring Report for Sabine Structure Replacement (CS-23) |  | 3.6 MB |
2016 Operations, Maintenance and Monitoring Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island GUlly |  | 2.2 MB |
2014/2015 Annual Inspection Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-0023) |  | 2.2 MB |
CS-23 2014/2015 Annual Inspection Report |  | 2.2 MB |
CS-23 2011/2012 Annual Inspection Report |  | 1.9 MB |
CS-23 As-Built Drawings |  | 4.4 MB |
CS-23 Project Completion Report (As Built) |  | 1.1 MB |
CS-23 2009 Project Completion Report |  | 111.4 KB |
CS-23 2005 Project Completion Report |  | 174.1 KB |
CS-23 Summary Data and Graphics |  | 4.1 MB |
CS-23 Monitoring Plan |  | 715.5 KB |
CS-23 As-Built Bid Package |  | 1.3 MB |
CS-23 2012 Monitoring Plan |  | 459.2 KB |
CS-23 2010/2011 Annual Inspection Report |  | 724.8 KB |
CS-23 2008 Operations, Maintenance, and Monitoring Report |  | 2.2 MB |
CS-23 2009/2010 Annual Inspection Report |  | 768.3 KB |
CS-23 2005 Operations, Maintenance, and Monitoring Report |  | 4.3 MB |
CS-23 2006/2007 Annual Inspection Report |  | 567.5 KB |
CS-23 2005/2006 Annual Inspection Report |  | 806.5 KB |
CS-23 2004 Operations, Maintenance, and Monitoring Report |  | 4.5 MB |
Project Manager's Technical Fact Sheet (HTML) |  | 10.0 KB |
Data
The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23) 2000 Land/Water
The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23) 2000 Land/WaterDownload (ZIP 4.4 MB)
- Product Id: 2000-02-0116
- Type: Spatial Data
- Created: 4/8/2004 1:11:00 PM
- Modified: 4/8/2004
- Contact: Bill Jones
- Office: NWRC-GIS
- Orientation:
- Scale: Unknown
- This data set consists of an unsupervised classification of land and water for the year 2000 for the CWPPRA project, The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23). The data are generated using color infrared mosaicked imagery for that year. The data are used by project managers for each site in order to get a general overview of land loss. The data can be compared to the same type of data from previous years to conduct trend analysis.
The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23) 2000 Mosaic
The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23) 2000 MosaicDownload (ZIP 279.3 MB)
- Product Id: 2000-02-0115
- Type: Spatial Data
- Created: 6/30/2003 12:00:00 AM
- Modified: 4/8/2004
- Contact: Bill Jones
- Office: NWRC-GIS
- Orientation:
- Scale: Unknown
- This data set consists of mosaicked color infrared 2000 aerial photography for the CWPPRA project, The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23). The data are used as base map data for either land/water analysis and/or habitat change analysis. The imagery also serves as a visual tool for the project managers to assist them in land loss or any other obvious problems within the project boundary.
Wetland Value Assessment
- Project Area (acres):
42247
- Average Annual Habitat Units*:
491
- Acres Created / Restored:
367
- Acres Protected:
586
- Total Net Acres:
953
* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability
Index) and habitat quantity (acres) within a given area at a given point in time.
Average Annual Habitat Units represent the average number of Habitat Units within
any given year over the project life for a given area.