Breton Landbridge Marsh Creation (West) (BS-38)
Priority Project List: 28
Sponsors: CPRA, NMFS
Parishes: Plaquemines
Reports
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF0.2 KB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF397.8 KB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF3.9 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF1.9 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF2.3 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF8.4 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF6.7 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF11.4 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF25.3 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF17.1 MB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF368.7 KB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF403.9 KB
Breton Landbridge Marsh Creation (West) River aux Chenes to Grand Lake (BS-0038) 95% Design ReportPDF15.9 MB
Geotechnical Engineering Services Report. Breton Landbridge West Marsh Creation Project (BS-0038). Plaquemines Parish, LouisianaPDF6.7 MB
Breton Landbridge Marsh Creation (West) (BS-38) Numerical Modeling and Wave Impact AnalysisPDF2.3 MB
Breton Landbridge Marsh Creation (West) (BS-38) Geotechnical Data ReportPDF11.4 MB
Breton Landbridge Marsh Creation (West) (BS-38) Phase I Environmental Site Assessment and Hazardous, Toxic, and Radioactive Waste Assessment (HTRW) ReportPDF3.9 MB
Biological Oyster Assessment for Breton Landbridge Marsh Creation (West) (BS-38)PDF10.4 MB
Breton Landbridge Marsh Creation (West) (BS-38) Nationwide Permit SummaryPDF
Breton Landbridge Marsh Creation (West) (BS-38) Geotech PermitPDF48.5 KB
Project Manager's Technical Fact Sheet (HTML)html10.0 KB
Map
There are no maps associated with this project
Data
There is no data associated with this project
Wetland Value Assessment
  • Project Area (acres): 561
  • Average Annual Habitat Units*: 160
  • Acres Created / Restored: 379
  • Acres Protected: 0
  • Total Net Acres: 379

* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.

About This Site

The Louisiana Coastal Wetlands Planning Protection and Restoration Act Program web site contains information and links relating to coastal restoration projects in coastal Louisiana. This site is funded by CWPPRA and is maintained by the USGS National Wetlands Research Center.