Region One CWPPRA Projects: Construction Status

Project Number Project Title Description of Project Work Net Acres
at 20 Years
Completion Date Construction Status
PO-17 Bayou LaBranche Wetland Creation Dredging and pumping sediments to create vegetated wetlands
203
7-Apr-94 Construction complete;
Monitoring in progress
PO-16 Bayou Sauvage Refuge Restoration Installation of two pumps to remove excess water
1,550
30-May-96 Construction complete; Monitoring in progress
PO-06 Fritchie Marsh Restoration Installation of culvert and weir; enlargement of channel
1,040
1-Mar-01 Construction complete; Monitoring in progress
PO-18 Bayou Sauvage NWR Hydrologic Restoration Installation of two pumps to remove excess water 
1,280
28-May-97 Construction complete; Monitoring in progress
PO-19 MRGO Disposal Area Marsh Protection Repair dike breaches south of La Loutre Ridge 
755
29-Jan-99 Construction complete; Monitoring in progress
PO-22 Bayou Chevee Shoreline Protection Construction of two rock dikes with fish dips to provide access to shallow-water coves
75
12-Dec-01 Construction complete; Monitoring in progress
PO-25 Bayou Bienvenue Pump Station Diversion and Terracing Combination of existing pump stations with the construction of a 2,500-foot long diversion channel, water control structures and earthen terraces planted with cordgrass
442
Unscheduled Requesting Deauthorization
PO-24 Hopedale Hydrologic Restoration Replace collapsed culverts installed in the 1950s near Yscloskey 
134
Unscheduled Engineering and Design
PO-27 Chandeleur Islands Marsh Restoration Vegetative planting
220
Unscheduled Construction
PO-28 La Branche Wetlands Terracing, Planting and Shoreline Protection   Installation of shoreline protection; vegetative planting; herbivore control
489
Unscheduled Engineering and Design
PO-26 Opportunistic Use of Bonnet Carr Spillway Pulling pins to prevent spillage of the Bonnet Carr structure
177
Unscheduled Engineering and Design
PO-30 Lake Borgne at Shell Beach Construction of a continuous nearshore rock breakwater along the south rim of Lake Borgne
229
Unscheduled Engineering and Design
PO-31 Lake Borgne Shoreline Protection at Bayou Dupre Construction of nearshore rock breakwaters
83
Unscheduled Engineering and Design
PO-29 Diversion into Maurepas Swamp Construction of two box culverts, a receiving pond reinforced with riprap and a deep outflow channel to run from the Mississippi River to U.S. Interstate 10
N/A
Unscheduled Engineering and Design