Region One CWPPRA Projects: Construction Status
| Project Number | Project Title | Description of Project Work |
Net Acres at 20 Years |
Completion Date | Construction Status |
|---|---|---|---|---|---|
| PO-17 | Bayou LaBranche Wetland Creation | Dredging and pumping sediments to create vegetated wetlands |
203
|
7-Apr-94 | Construction complete; Monitoring in progress |
| PO-16 | Bayou Sauvage Refuge Restoration | Installation of two pumps to remove excess water |
1,550
|
30-May-96 | Construction complete; Monitoring in progress |
| PO-06 | Fritchie Marsh Restoration | Installation of culvert and weir; enlargement of channel |
1,040
|
1-Mar-01 | Construction complete; Monitoring in progress |
| PO-18 | Bayou Sauvage NWR Hydrologic Restoration | Installation of two pumps to remove excess water |
1,280
|
28-May-97 | Construction complete; Monitoring in progress |
| PO-19 | MRGO Disposal Area Marsh Protection | Repair dike breaches south of La Loutre Ridge |
755
|
29-Jan-99 | Construction complete; Monitoring in progress |
| PO-22 | Bayou Chevee Shoreline Protection | Construction of two rock dikes with fish dips to provide access to shallow-water coves |
75
|
12-Dec-01 | Construction complete; Monitoring in progress |
| PO-25 | Bayou Bienvenue Pump Station Diversion and Terracing | Combination of existing pump stations with the construction of a 2,500-foot long diversion channel, water control structures and earthen terraces planted with cordgrass |
442
|
Unscheduled | Requesting Deauthorization |
| PO-24 | Hopedale Hydrologic Restoration | Replace collapsed culverts installed in the 1950s near Yscloskey |
134
|
Unscheduled | Engineering and Design |
| PO-27 | Chandeleur Islands Marsh Restoration | Vegetative planting |
220
|
Unscheduled | Construction |
| PO-28 | La Branche Wetlands Terracing, Planting and Shoreline Protection | Installation of shoreline protection; vegetative planting; herbivore control |
489
|
Unscheduled | Engineering and Design |
| PO-26 | Opportunistic Use of Bonnet Carr Spillway | Pulling pins to prevent spillage of the Bonnet Carr structure |
177
|
Unscheduled | Engineering and Design |
| PO-30 | Lake Borgne at Shell Beach | Construction of a continuous nearshore rock breakwater along the south rim of Lake Borgne |
229
|
Unscheduled | Engineering and Design |
| PO-31 | Lake Borgne Shoreline Protection at Bayou Dupre | Construction of nearshore rock breakwaters |
83
|
Unscheduled | Engineering and Design |
| PO-29 | Diversion into Maurepas Swamp | Construction of two box culverts, a receiving pond reinforced with riprap and a deep outflow channel to run from the Mississippi River to U.S. Interstate 10 |
N/A
|
Unscheduled | Engineering and Design |