Region Two CWPPRA Projects: Construction Status

Project Number Project Title Description of Project Work Net Acres at 20 Years Completion Date Construction Status
BA-02 Project GIWW to Clovelly Hydrologic Restoration Installation of five weirs and four canal plugs; re-establishment of lakeshore rim; maintenance of canal/marsh banks to manage freshwater flow and reduce erosion 2,052  Oct-2000 construction complete; monitoring in progress
BA-3c Naomi Outfall Management Construction of weirs with boat bays to maximize sediment retention and nutrient uptake 633  unscheduled engineering and design
BA-4c West Pointe a la Hache Outfall Management Installation of three plugs and three weirs; restoration of channel banks to enhance sediment and nutrient distribution and reduce saltwater intrusion 1,087  unscheduled engineering and design
BA-15 Lake Salvador Shore Protection Demonstration-Phase I, II Construction and testing of four types of shoreline protection structures to protect the shoreline and adjacent marsh from wave-induced erosion N/A  1998 construction complete
BA-19 Barataria Bay Waterway Wetland Restoration Use of maintenance-dredged sediments to create marsh; purchase of oyster leases 445  (Phase I) 31-Dec-99 construction complete; monitoring in progress
BA-20 Jonathan Davis Wetland Protection Installation of five weirs, eight plugs, breach armoring and rock dike shoreline protection to reduce erosion 510  unscheduled Unit 1 & 2-complete
Unit 3-engineering and design
BA-21-2 Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Creation of marsh platform and six, one-acre ponds to be seeded aerially 161  unscheduled engineering and design
BA-22 Bayou L'Ours Ridge Hydrologic Restoration Installation of six plugs and two water control structures to restore hydrologic integrity of the ridge 737  unscheduled engineering and design
BA-23 Barataria Bay Waterway West Side Shoreline Protection Construction of rock dike; installation of water control structure to provide drainage and fisheries access 232  2-Nov-00 construction complete; monitoring in progress
BA-24 Myrtle Grove Siphon Installation of eight siphon pipes and vacuum pipe; construction of leveed outfall channel to facilitate distribution of water and sediments 1,119 unscheduled engineering and design
BA-24-1 Little Lake Shoreline Protection/Dedicated Dredging near Round Lake Installation of shoreline protection and dedicated dredging   713 unscheduled engineering and design
BA-24-4 Northeast Extension of Barataria Landbridge Shoreline Protection Installation of foreshore rock dike with a lightweight aggregate core or concrete sheetpile and will incorporate fish dips  334 unscheduled engineering and design
BA-25 Bayou Lafourche Siphon Installation of pump/siphon system, a receiving intake structure, discharge settling pond/sediment basin, weir structures and bank stabilization   988 unscheduled engineering and design
BA-26 Barataria Bay Waterway East Bank Protection Installation of foreshore rock dike  217 1-Jun-01 construction complete; monitoring in progress
BA-27 Barataria Basin Landbridge Shoreline Protection-Phase 1 & 2 Stabilization of shoreline with rock riprap; maintenance of vegetation with PVC sheetpile; construction of breakwater to bridge discontinuous marsh 1,304 19-Jul-01 Phase 1-complete
Phase 2-construction
BA-27c Barataria Basin Landbridge Shoreline Protection-Phase 3 Installation of rock shoreline protection 264 unscheduled engineering and design
BA-28 Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island Vegetative plantings; degradation of retention dikes to enhance fisheries; construction of fencing to reduce grazing 127 31-May-01 construction complete; monitoring in progress
BA-29 LA Highway 1 Marsh Creation Dredge material from a nearby area for use to create marsh habitat in a large open water area adjacent to LA Highway 1 146 unscheduled engineering and design
BA-30 East/West Grand Terre Restoration Project Construction of 40 acres of dune and dune will be planted with vegetation  472 unscheduled engineering and design
BA-33 Delta-Building Diversion at Myrtle Grove Installation of five gated box culverts and a conveyance channel; construction of a pump station  8,891 unscheduled engineering and design
BA-34 Small Freshwater Diversion to Northwestern Barataria Installation of two small siphons, gap spoil banks and culverts * unscheduled engineering and design
BA-CW- 3 Dedicated Dredging on the Barataria Basin Landbridge Hydrologic dredging and placement of dredged material in open water areas in the marsh interior; vegetative planting 564 unscheduled engineering and design
BS-3a Caernarvon Diversion Outfall Management Construction of six armored plugs and maintenance of one plug; install culverts in seven existing plugs; restoration of spoilbanks to enhance freshwater flow and retention 802  unscheduled construction
BS-08 Upper Oak River Freshwater Siphon-Phase 1 Installation of a freshwater siphon; create openings in ridge and road to allow water flow; vegetative plantings 339 unscheduled engineering and design
BS-10 Delta-Building Diversion North of Fort St. Philip Installation of a new diversion channel and cuts made into the channel will divert water and sediments into adjacent open waters 2,473 unscheduled engineering and design
BS-11 Delta Management at Fort St. Philip Construction of terraces and six crevasses 267 unscheduled engineering and design
MR-3 West Bay Sediment Diversion Construction of a conveyance channel for diversion of sediments from the Mississippi River 9,831  unscheduled engineering and design
MR-6 Channel Armor Gap Crevasse Enlargement of existing crevasse to allow additional flow and sediment deposition 936 2-Dec-97 construction complete; monitoring in progress
MR-9 Delta-Wide Crevasses Construction of five new crevasses; dredging of existing crevasses; installation of the plug in the Raphael Pass crevasse to force more water through other crevasses 2386 unscheduled construction
MR-10 Combination Dustpan and Cutterhead Maintenance Dredging Operations for Marsh Creation in the Mississippi River Delta Demonstration Project will use dredge material from routine maintenance of the Mississippi River Navigation Channel to create and restore adjacent marsh N/A  unscheduled construction
MR-11 Periodic Introduction of Sediment and Nutrients at Selected Diversion Sites Demonstration Demonstrate the effectiveness of using a dredge to provide sediment input into a diversion structure. A dustpan dredge would be employed for the project causing no impact N/A unscheduled engineering and design
MR-13 Benny's Bay Diversion Installation of a conveyance channel for an uncontrolled sediment diversion 5,828 unscheduled engineering and design

* No net acres are calculated for swamp projects. This project would benefit 5134 acres.

Don't send email to Meat