PPL12 Nominated Projects
The projects listed below were nominated by the regional planning teams. Agencies and local proponents will be working together to prepare information for the Engineering and Environmental work group meetings on May 7-9 in Baton Rouge. The work group chairmen will distribute agenda and information requirements for those meetings. The Technical Committee is scheduled to meet on May 23 at the Corps of Engineers to select 6-8 candidate projects for detailed evaluation.
Region 1
Hydrologic Restoration in the Swamps West of Lake Maurepas
Goose Point/Pointe Platte Shoreline Protection and Marsh Creation
Shoreline Protection and Marsh Creation Along Lake Borgne (Doullts Canal to
B. St. Malo) and MRGO (Hopedale to Shell Beach)
Region 2
Bayou Dupont Sediment Delivery
Shell Island (multiple options of rock, sand or combination)
East Fourchon Marsh Creation and Terracing
Region 3
North Bully Camp Hydrologic Restoration/Marsh Creation
Avoca Island Diversion and Land Building
Bayou Sale Ridge Protection
Region 4
Oyster Bayou Hydrologic Restoration
Rockefeller Shoreline Protection (Joseph's Harbor to Dewitt Canal)
South White Lake Shoreline Protection (Will's Point to Bear Lake)

