Barataria Basin Landbridge Shoreline Protection, Phase 3 (BA-27c) Overview
Priority Project List: 9
Parishes: Jefferson
Fact Sheet:
BA-27c General Project Fact Sheet (PDF 2.09 MB)
BA-27c General Project Fact Sheet - High Quality (PDF 7.28 MB)
BA-27c General Project Fact Sheet (PDF 2.09 MB)
BA-27c General Project Fact Sheet - High Quality (PDF 7.28 MB)
Reports:
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF 1.83 MB)
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF 3.90 MB)
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF 1.43 MB)
BA-27c Ecological Review (PDF 1.77 MB)
BA-27c Project Managers' Technical Fact Sheet (HTML)
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF 1.83 MB)
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF 3.90 MB)
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF 1.43 MB)
BA-27c Ecological Review (PDF 1.77 MB)
BA-27c Project Managers' Technical Fact Sheet (HTML)
Data:
See BA-27 project page
Barataria Basin Landbridge Shoreline Protection, Phase 3 (BA-27c) 2008 Land-Water Classification
See BA-27 project page
Barataria Basin Landbridge Shoreline Protection, Phase 3 (BA-27c) 2008 Land-Water Classification
| Project Area (acres): | 2380 |
| Average Annual Habitat Units*: | 101 |
| Acres Created / Restored: | 0 |
| Acres Protected: | 264 |
| Total Net Acres: | 264 |
*
Habitat Units represent a numerical combination of
habitat quality (Habitat Suitability Index) and habitat quantity (acres)
within a given area at a given point in time. Average Annual Habitat Units
represent the average number of Habitat Units within any given year over
the project life for a given area.

